Annexure A FORM 1 (See Regulation 3) ARCHITEC'I'’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 31/03/2022 To, M/s. Royal’s Realtors B-3, Avani Apartments, W.E. Highway, Dahisar (East), Mumbai- 400 068 Subject: Certificate of Percentage of Completion of Construction Work of SHREE ROYAL HEIGHT situated on C.T.S. No. 113 and 113/1 to 4, Village Akruli situate at Ashok Nagar, Kandivali (East), Mumbai - 400 101, having MahaRERA Registration Number P51800022042, being developed by M/s. Royal's Realtors. Sir, I Mr. UDAY KANADIA of M/s. KRATAARTH ARCHITECTS have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of SHREE ROYAL HEIGHT situated on C.T.S. No. 113 and 113/1 to 4, Village Akruli situate at Ashok Nagar, Kandivali (East), Mumbai - 400 101, having MahaRERA Registration Number P51800022042, being developed by M/s. Royal's Realtors. I, Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE - A One Building, Single Wing of “SHREE ROYAL HEIGHT” Sr. Tasks /Activity Percentage No of work done (As on Date of Certificate) 1 Excavation 100% 2. Basement ---- 2 Podium ---- 3 Plinth 100% 4 Stilt Floor 0% 5 18 number of Slabs of Super Structure 66% 6 Internal walls, Internal Plaster, floorings, doors and windows within 10.25% flat/premises. 7 Sanitary & Electrical Fittings within the Flat/Premises, 0% 8 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 29.60% Underground Water Tanks. 9 External plumbing and external plaster, elevation, completion of 12.70% terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and 2.53% Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per Specifications in agreement of Sale. Any other activities. TABLE – B Common Area (Internal and External Development Works) in Respect of the Registered Phase/ Project Number. S. No. Common areas and Proposed. Percentage of Details. Facilities, Amenities. (Yes/No) Work done. (As on date of the Certificate) 1. Internal Roads & No 0% N.A. Footpaths. 2. Water Supply. Yes 0% Drinking Water Permission after O.C. Received. 3. Sewerage (chamber, Yes 40% Sewerage Remark obtained lines, Septic Tank, shall complete before O.C. STP). 4. Storm Water Yes 25% SWD Remark obtained Drains. shall complete before O.C. 5. Landscaping & Yes 0% S. G. NOC obtained. shall Tree Planting. complete before O.C. 6. Street Lighting. No 0% N.A. 7. Community Building. No 0% N.A. 8. Treatment and disposal No 0% N.A. of sewage and sullage water. 9. Solid Waste No 0% N.A. Management And Disposal. 10. Water Conservation, Yes 0% Shall complete before O.C. Rain water Harvesting. Consultants appointed. 11. Energy No 0% N.A. Management. 12. Fire protection Yes 0% CFO NOC obtained shall and fire safety complete before O.C.. Requirements. 13. Electrical meter Yes 0% Shall complete before O.C. Room, sub-station, receiving station. 14. Others. Yes 10% Site Development. Thanking You, Yours faithfully, M/s. KRATAARTH ARCHITECTS AR. UDAY KANADIA Reg.No.CA/2005/35347