MUNICIPAL CORPORATION OF GREATER MUMBAI CHE/A - 4943/BP(WS)/AR To, To, Shri. Prakash Shah, Lic. Surveyor. Shri. Vipul Vora Partner of M/s. Royal Realtors. 601, Ishwar Apt., Ashok Nagar Cross Road no. A/2, 3/B, Avani Apt., Near Nirmal Apt., W.E. 2, Kandivali (E), Mumbai – 400 101. Highway, Dahisar (E), Mumbai – 400 068. Sub : Proposed redevelopment on Plot bearing C.T.S. No. 113, 113/1 to 4 of Village Akurli, at Ashok Chakravarty Road, Kandivali (E), Mumbai in R/South ward. Ref : Your request to approve amended plans in Auto D.C.R. console. Gentleman, There is no objection to carry out the work as per amended plans submitted by you in auto D.C.R. console subject to the following conditions:- 1) That all the objections of this office I.O.D under No. CHE/A – 4943/BP(WS)/AR dated 10.08.2018 shall be applicable and should be complied with. 2) That all the balance payment, shall be paid before C.C. 3) That the revised R.C.C design & calculations shall be submitted before C.C. 4) That the extra water and sewerage charges shall be paid before C.C. 5) That the no dues pending certificate from A.E.W.W. (R/N) Ward shall be submitted. 6) That the revised H.E. N.O.C. shall be submitted. 7) That the valid Janta Insurance Policy shall be submitted. 8) That the self declaration for dry and wet garbage shall be submitted to separate the garbage generated in the building shall not be treated separately on the same plot by residents / occupants of the building in jurisdiction of M.C.G.M. and the necessary condition in sale agreement to that effect shall be incorporated by Developer / Owner. 9) That self declaration form in respect of installing compositing pit/composite machine / bio-mechanize system for processing wet waste generated at project side shall be submitted by developer / building / owner as per circular No. CHE/0024/Gen dated 02.04.2016. 10) That all the conditions in the N.O.C. from SWM department obtained online in response to application under No. CHE/A – 4943/BP(WS)/AR dated 12.06.2018 to transport & deposit / dump / level the C&D Waste at only designated unloading site – JNPT SEZ Phase-I, near JNPT Port, Road No. 348A, Beside Dastan Toll Plaza, Panvel - Uran Road, Dist. Raigad shall be complied with. 11) That the monthly progress report shall be submitted. 12) That the adequate safeguards should be employed for preventing dispersal of (dust) particles/ particles through the Air (or even otherwise) & adequate record shall be maintained & uploaded for every single trip for disposal of C&D waste, at the time of loading the C&D waste in vehicle, after loading the C&D waste in the vehicle during the hauling. 13) That the construction site & landfill site shall be inspected by the Licensed Architect/ Licensed Engineer, the compliance report thereof shall be uploaded, any breach in respect of the same will entail the cancellation of the building permission or the IOD & the work will be liable to be stopped immediately. 14) That the construction is being permitted with a condition that the debris shall be deposited on pre-identified site with due consent / NOC of the land owner. 15) That C&D Waste of large scale above 20 MT shall be disposed off as per Waste management plan approved online & as per Construction and Demolition Waste Management Rules 2016. 16) That in the event the consent given by the disposal site owner / authority is revoked for any reasons, and/ or in the event the time limit during which disposal site was available gets expired, the relevant construction activity shall be stopped & show cause notice shall be given & till such time Waste Management Plan/ Debris Management plan is amended to provide the new site for dumping of C&D Waste and got approved online, construction work shall not be recommenced. 17) That the valid Bank Guarantee of Rs.5,00,000/- shall be furnished solely for the purpose of ensuring compliance of the conditions in the Waste Management Plan/ Debris Management Plan approved by SWM department of MCGM, till grant of full Occupation Certificate. 18) That any officer of MCGM/ Monitoring Committee shall be entitled to inspect the record of grant of IOD, visit & inspect landfill sites, as well as, MCGM Officers/ Monitoring Committee shall be entitled to bring to the notice of MCGM any breach in the IOD conditions. The order passed by MCGM on the reported breaches shall not be final & binding. 19) That all the conditions in the orders of Hon’ble Supreme Court of India dated 15.03.2018 in the case of Dumping Ground shall be complied with. 20) That in breach of any of the above conditions, this approval is liable to be revoked. One set of approved plans are returned herewith as token of approval. Yours faithfully, Abhijit Digitally signed by Abhijit Bandu Sankhe DN: c=IN, o=Personal, Vinod Digitally signed by JITENDRA Vinod Kondiram Digitally signed by JITENDRA W GHODE 2.5.4.20=26038e0b1e7c13d3ef0a07e1a08d7468 b2f42efb2d498b1a47e0ec7ec555a28a, Kondiram Kekan DN: c=IN, o=Municipal Corporation of Bandu postalCode=400092, st=MAHARASHTRA, Greater Mumbai, postalCode=400604, 2.5.4.45=03410065396135303233613164643938 st=Maharashtra, W 643433663532326336383464356363373738356 2.5.4.20=bd149be446a12c8b6c922c33e 563353236343438396666363039343430353666 Date: 2019.06.15 baebe53372e2a674f0856ca5f874bd30e 356431633132316563343839, Sankhe Kekan ad55a4, serialNumber=500b47bd46871f2cf0987bf537e2 serialNumber=a6f762f05f2966fb498d5 a95b6d124e88ff1ca9cfcc0376826e55c72f, GHODE 16:36:06 +05'30' cn=Abhijit Bandu Sankhe ed6e989f0e6a20faf6ce504c27f5f050c90 Date: 2019.06.14 20:14:29 +05'30' 4070cbe1, cn=JITENDRA W GHODE Date: 2019.06.12 17:31:43 +05'30' S.E.B.P. (R/S) A.E.B.P. (R/S) Executive Engineer (B.P.) (Western Suburbs) ‘R’ Ward