" Engineers " Achitects " licensed Surveyor " Development Monoger " PMC FORM I O archo CONSULTANIS ARCHITECT'SCERTIFICATE (As on 30th June 2024) Date : 30.06.2024 To, Shraddha Landmark Pvt. Ltd., Manisha Hcights Commercial, Ground + 1s Floor, Bchind Manisha Hcights, Vaishali Nagar, Mulund (W), Mumbai - 400080. Subjcct: Certificate of Percentage of Completion of Construction Work of proposed Redevelopment of Building No. 14, Known as Tagore Nagar Gcetanjali CHS. Ld. on plot bcaring no. 352 (pt), 352/ 18 to 25 of Village Hariyali, at Tagore Nagar, Vikhroli (E), Mumbai - 400083. Arca being developed by M/s. Shraddha Landmark Pvt. Ltd. Sir, MahaRERA Registration No:P51800021957 1, Sachin Rakshe of M/s Archo Consultants have undertaken assignment as Licensed Surveyor of certifying Percentage of Completion of Construction Work of proposed redevelopment of Building No. 14, Known as as Tagore Nagar Geetanjali CHS. Ltd. on plot bearing no. 352 (pt), 352/ 18 to 25 of Village Hariyali, at Tagore Nagar, Vikhroli (E), Mumbai - 400083. Area being developed by M/s. Shraddha Landmark Pvt. Ltd. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE- A Percentage of Actual Sr. No. Task / Activity Work Done (As on date of the Certificate) (1) (2 (3) 1 Excavation IS.0GONS AA 100% MUMBAI Sunview CHS LId., Bldg. No.4,A-Wing, Room No 2, Ground Floor, off Sahokar eterTilgkragar, Chembur (W), Mumboi-400 089. Mob.: +91 9833986465 Email : archoconsultants@gmail.com 2 Basemcnts (if any) 0.00% 3 Podiums (if any) 0.00% 4 Plinth 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster, Floorings, Doors and 100% windows within Flats / Premises Sanitary Fittings within the Flat / Premises 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level 100% Overhead and Underground Water Tanks External plumbing and external plaster, elevation, 100% 10 completion of terraces with waterproofing of the Building / Wing. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/ CRZ NOC, finishing to entrance lobby/s, 11 plinth protection, paving of areas appurtenant to 100% Building / Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE B Common Area (Internal and External Development Works) in respect of the Registered Phase / Project Number Proposed Percentage of Details Sr. (Yes / Actual Work No. Common areas and Facilities No) Done (As on date of the Certificate) (1) (2) (3) (4) (5) Yes 100% 1 Internal Roads & Footpaths Driveway Yes 100% 2 Water Supply MCGM Sewerage (Chamber lines, Septic Tank, Yes 100% MCGM 3 STP) Yes 100% 4 Storm Water Drains Developer 5 Landscaping &Tree Planting No 100% Developer Yes 0% Community Buildings Driveway Lighting o MUMBAI No 0% NA 7 Strect Lighting No 0% NA Treatment and disposal of sewage and sullage water No 0% NA Solid Waste management & Disposal Yes 100% Only Rain Water conservation / Rain water Water 10 harvesting Harvesting by Developer No 0% NA 11 Energy management Fire Protection and fire safety Yes 100% Developer 12 requirements Electrical meter room, sub- station, Yes 100% Developer 13 receiving station 14 Others(Option to Add more) a. Mechanical Stack Parking System Yes 100% Developer b. Society Office Yes 100% Developer c. Fitness Center Yes 100% Developer Yours Faithfully, RCHO M/s. Archo Consultants, CONS ALTANS MUMBAI Sachin K. Rakshe (LS) Lic. No. (R/172/LS/2009) Agreed and Accepted by: For M/s. Shraddha Landmark Pyt. Ltd.