Date: 13.08.2021 To, Vaibhav Realtors, Owner / Developer 9 No. Malharrao Wadi, D.A. Lane, Kalbadevi , Mumbai – 400002. Sub.: Certificate regarding part completion of ongoing construction work of Bldg. No. 1 in Proposed Slum Rehabilitation scheme on plot bearing old CTS No. 3138 to 3145, 3146, 3146/1 to 12, 3147, 3150, 3150/1 to 9, 3151, 3151/1 to 6 and 3155 and new CTS Nos. 3138A & 3138B of Village: Kolekalyan, Taluka: Andheri, District: Mumbai., Pin: 400055 being redeveloped by M/s. Vaibhav Realtors Sir, I, Architect Pranav A. Shah of Aakar Architects have undertaken assignment as Architect for certifying percentage of completion of construction work of proposed building no. 1 having 3 wings in proposed redevelopment as detailed above and redevelopment being carried out by M/s Vaibhav Realtors. Following Technical Professionals are appointed by Developer to the best of my knowledge: (i) Ar. Pranav A. Shah of M/s. Aakar Architects as Liaison / Approval Architect (ii) Mr. Furkhan I. Pettiwala of M/s. Frames as Lic. Structural Consultant (iii) Mr. Dinesh H. Mehta as Licensed Plumber (iv) Mr. Dinesh H. Mehta as Licensed Site Supervisor Based on visual inspection of site with respect to the building of the aforesaid Real Estate Project, I hereby state certify that as on the date of this certificate, the percentage of work done for the building of the Real Estate Project as registered vide number P51800022021 under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity is stated in Table B below. TABLE - A PROPOSED BUILDING No. 1 - Wing A, B & C Sr. % of work Task / Activity No. done 1 Excavation 100% 2 Plinth 100% 3 Podiums N.A. 4 RCC work in Stilt Floor 100% 5 RCC Slabs work in Super Structure of Wing ‘A’ 50% 6 Internal walls, Internal plaster, Flooring within Flats / Premises, doors and 5% windows to each of the Flat/Premises OFFICE: 607, GHANSHYAM ENCLAVE, LINK ROAD, LALJI PADA, KANDIVALI (W), MUMBAI - 67. Tel: 9930 772 882, 2868 0618. Email: aakararchitects@yahoo.com ARCHITECTURE PLANNING URBAN DESIGN Sr. % of work Task / Activity No. done 7 Sanitary fittings within the Flats/Premises 0% RCC work of staircases, lifts wells lobbies at each floor level connecting 8 50% staircases and lifts ,overhead and underground water tanks The external plumbing, external plaster, elevation, completion of terraces with 9 0% waterproofing of the building. Installation of lifts, water pumps, Fire Fighting Fittings and equipment as per CFO 5% NOC, Electrical fittings to Common Areas, electro, mechanical equipment, 10 Compliance to conditions of environment/CRZ NOC, Finishing of entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall & other requirements as may be required to obtain Occupation/Completion Certificate TABLE –B Internal and External Development Works (in respect of the entire Registered Phase) Sr. Common areas Proposed % of work Details No. and Facilities / Amenities (Yes / No) done 1 Internal Roads & Footpaths NA - - 2 Water Supply Yes 0% - 3 Sewerage (chamber, Lines, Septic Tank, STP) Yes 10% - 4 Storm Water Drains Yes 10% - 5 Landscaping & Tree Planting Yes 0% - 6 Street lighting NA - - 7 Community Buildings NA - - 8 Treatment and disposal of sewage NA - - and sullage water 9 Solid Waste Management & disposal NA - - 10 Water Conservation, Rain water harvesting Yes 0% - 11 Energy Management NA - - 12 Fire Protection & Fire safety Requirement NA - - 13 Electrical meter room, Sub Station, receiving station Yes 0% - Thanking You Yours Faithfully, Architect Pranav A. Shah For Aakar Architects COA Regn. No. CA/98/23873 ARCHITECTURE PLANNING URBAN DESIGN