Raj K. SHAH Architects and interior designers C/39 CHEMBUR GAOTHAN, CHEMBUR (E), MUMBAI – 400 071 Date : 23rd Jan. 2022 FORM 1 ARCHITECT'S CERTIFICATE To M/s. Labh Enterprises, 503, Exim Link, Mulund Goregaon Link Road, Nahur (W), Mumbai – 400 078. Subject: Certificate of Percentage of Completion of Construction Work of ONE number of Building (Wing “A” & “B” of the Project KNOWN as “SUKESH” situated on the Plot bearing C T S No. 1370 & 1409 of Village Mulund (West), at Valji Ladha Road, Mulund (W), Mumbai - 400 080, PLOT admeasuring 1113.60 Sq. M. area being developed by M/s. Labh Enterprises. Sir, I, SHRI RAJ KETAN SHAH, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of One Building (Wing “A” & “B” of the Project KNOWN as “SUKESH” situated on the Plot bearing CTS No. 1370 & 1409 of Village Mulund (W) at Valji Ladha Road, Mulund (West), Mumbai-400 080, PLOT admeasuring 1113.60 Sq.mts area being developed by M/s Labh Enterprise. 1. Following technical professionals are appointed by Owner / Promoter : (i) Shri Raj K. Shah, as Architect. (ii) Shri Furkhan I. Pettiwala, as Structural Engineer. (iii) M/s. Efforts, as MEP Consultant (iv) Mr. Kiran Kuttir Site Engineer Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51800022016 under MahaRERA is as per table A herein below. The percentage of the work executed up to 31.12.2022 with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. No Tasks /Activity Percentage of work done Wing Wing “”A” “B” 1 Excavation 100 100 2 Stilt 100 100 3 Number of Podiums NA NA 4 Ground Floor 100 100 5 Number of Slabs of Super Structure 100 100 6 Internal walls, Internal Plaster, 100 100 Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the 70 70 Flat/Premises, Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at 100 100 each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external 100 100 plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire 90 90 Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. Common areas and Proposed Percentage Details No Facilities, Amenities (Yes/No) of Work done 1. Internal Roads & NA NA Footpaths 2. Water Supply Yes 60 3. Sewerage (chamber, lines, Yes 80 Septic Tank, STP) 4. Storm Water Drains Yes 70 5. Landscaping & Tree Yes 50 Tree planting Planting only. 6. Street Lighting NA NA 7. Community Buildings NA NA 8. Treatment and disposal of NA NA sewage and sullage water 9. Solid Waste Management Yes 80 & Disposal 10. Water conservation, Rain Yes 100 water harvesting 11. Energy management NA NA 12. Fire protection and fire Yes 80 safety requirements 13. Electrical meter room, sub Yes 70 Electric meter station, receiving station room only 14. Others (Option to Add No Nil more) Yours faithfully, Digitally signed by Raj Ketan Shah Raj DN: cn=Raj Ketan Shah c=IN o=Personal Ketan Reason: I am the author of this document Location: Shah Date: 2023-01-25 16:53+05:30 RAJ K SHAH (CA/2014/63869)