Raj K. SHAH Architects and interior designers C/39 CHEMBUR GAOTHAN, CHEMBUR (E), MUMBAI – 400 071 30th July 2022 FORM 1 ARCHITECT'S CERTIFICATE To M/s. Labh Enterprises, 503, Exim Link, Mulund Goregaon Link Road, Nahur (W), Mumbai – 400 078. Subject: Certificate of Percentage of Completion of Construction Work of ONE number of Building (Wing “A” & “B” of the Project KNOWN as “SUKESH” situated on the Plot bearing C T S No. 1370 & 1409 of Village Mulund (West), at Valji Ladha Road, Mulund (W), Mumbai - 400 080, PLOT admeasuring 1113.60 Sq. M. area being developed by M/s. Labh Enterprises. Sir, I, SHRI RAJ KETAN SHAH, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of One Building (Wing “A” & “B” of the Project KNOWN as “SUKESH” situated on the Plot bearing CTS No. 1370 & 1409 of Village Mulund (W) at Valji Ladha Road, Mulund (West), Mumbai-400 080, PLOT admeasuring 1113.60 Sq.mts area being developed by M/s Labh Enterprise. 1. Following technical professionals are appointed by Owner / Promoter : (i) Shri Raj K. Shah, as Architect. (ii) Shri Furkhan I. Pettiwala, as Structural Engineer. (iii) M/s. Efforts, as MEP Consultant (iv) Mr. Kiran Kuttir Site Engineer Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51800022016 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Sr. No Tasks /Activity Percentage of work done Wing Wing “”A” “B” 1 Excavation 100 100 2 Stilt 100 100 3 number of Podiums NA NA 4 Ground Floor 100 100 5 Number of Slabs of Super Structure 100 100 6 Internal walls, Internal Plaster, 90 100 Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the 40 40 Flat/Premises, Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at 100 100 each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external 80 90 plaster, elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire 20 30 Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. Common areas and Proposed Percentage Details No Facilities, Amenities (Yes/No) of Work done 1. Internal Roads & No Nil Footpaths 2. Water Supply Yes 40 3. Sewerage (chamber, lines, Yes 40 Septic Tank, STP) 4. Storm Water Drains Yes 50 5. Landscaping & Tree Yes Nil Tree planting Planting only 6. Street Lighting No Nil 7. Community Buildings No Nil 8. Treatment and disposal of No Nil sewage and sullage water 9. Solid Waste Management Yes 80 & Disposal 10. Water conservation, Rain Yes 70 water harvesting 11. Energy management No Nil 12. Fire protection and fire Yes 60 safety requirements 13. Electrical meter room, sub Yes 50 Electric station, receiving station meter room only 14. Others (Option to Add No Nil more) Yours faithfully, Digitally signed by Raj Ketan Shah Raj Ketan DN: c=IN, o=Personal, title=2266, pseudonym=68277EE61B9F03BDB288035 797E4EC269BDB79AA, 2.5.4.20=db5d5c8b6e5a1780719dde634aa d76c9139a04ba6eb9cc544b056482e6547d Shah 66, postalCode=400080, st=Maharashtra, serialNumber=EF4269342FC6379A8CC96B 367DEB6B67C22F36063C4621624943ADE 8761EF812, cn=Raj Ketan Shah Date: 2022.08.04 10:59:22 +05'30' RAJ K SHAH (CA/2014/63869)