Divyesh Parekh Licensed Surveyor (B.E. Civil) 25, Natraj, Sodawala Lane, Borivali (W), Mumbai - 92. divsparekh@gmail.com, I Phone: 98693 56657. ___________________________________________________________________________ FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 31.03.2021 To, BHALANI & MEHTA (AOP) 1/B, Parvati Kunj CHSL., Daulat Nagar Road No. 03, Borivali (East), Mumbai – 400066 Subject: Certificate of Percentage of Completion of Construction Work of KRISHNAM (VANDANA) Building - Wing of the - Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing C.N. No/CTS No./Survey no./ Final Plot no CTS No. 519, 519/1-2 demarcated by its boundaries ( latitude and longitude of the end points) CTS No. 518 to the North, CTS No. 520 to the South, CTS No. 522 to the East, EXISTING ROAD to the West of Division Konkan ,village Malad ,Taluka Borivali ,District Mumbai Suburban, PIN 400064 admeasuring 306.2 sq.mts. plot area being developed by Bhalani & Mehta (AOP) Sir, I Mr. Divyesh H. Parekh have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the KRISHNAM Building, situated on the plot bearing C.N. No/CTS No./Survey no./ Final Plot no CTS No. 519, 519/1-2 of Division Konkan, Village Malad, Taluka Borivali, District Mumbai Suburban, Pin-400064, admeasuring 306.20 sq.mts. plot area being developed by Bhalani & Mehta (AOP). 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri. Divyesh H. Parekh as L.S. / Architect. (ii) Shri. Umeshkumar Chaurasia as Structural Consultant. (iii) Shri. Jitendra K. Jadav as MEP Consultant. (iv) Shri. Samir N. Bhalani as Site Supervisor. Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number P51800021871 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page 1 of 3 Table A Building /Wing Number_____(to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks /Activity Percentage of work done 1 Excavation 90 % 2 _1_ number of Basement(s) and 1 no of Plinth 100 % 3 _0_ number of Podiums NIL 4 Stilt Floor NIL 5 _8_ number of Slabs of Super Structure 62.50% 6 Internal walls, Internal Plaster, Floorings within 08% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical NIL Fittings within the Flat/Premise 8 Staircases, Lifts Wells and Lobbies at each Floor level 62.50% connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, NIL completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings NIL and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. No. Common areas and Facilities, Proposed (Yes/No) Percentage of Details Amenities Work done 1. Internal Roads & Footpaths NO NA 2. Water Supply YES --- 3. Sewerage (chamber, lines, YES --- Septic Tank , STP) 4. Storm Water Drains NO NA 5. Landscaping & Tree Planting NO NA 6. Street Lighting NO NA 7. Community Buildings NO NA 8. Treatment and disposal of NO NA sewage and sullage water 9. Solid Waste management & YES 70% Foundation and Disposal Construction Debris up to 5th Page 2 of 3 Slab Completed. 10 Water conservation, Rain YES --- water harvesting 11. Energy Management No NA 12. Fire Protection and fire YES --- safety requirements 13. Electrical meter room, sub- YES --- station, receiving station 14. Others (Option to Add More) NO NA Yours Faithfully Divyesh H. Parekh Date: DIVYESH HARESH 2021.07.06 PAREKH 10:24:00 +05'30' Licensed Surveyor (License No: P/444/LS) Page 3 of 3