SORRENTO : 2 BASEMENTS + STILT + 1st To 22nd , Sector-VI-A 40 PROFORMA - B 4 STAMP OF DATE OF RECEIPT OF PLANS 3.00 3.00 LIFT F.F. LIFT MACHINE HT 2.10M MACHINE ROOM CAP. 30870 LTR ROOM 6.10 6.10 3.10 3.10 TERRACE TERRACE TERRACE 1.50 TERRACE 1.50 TERRACE FLR LVL BEDROOM KITCHEN LIV 2.90 2.90 LIVING 22ND FLOOR LVL PASS. LIVING 22ND FLOOR LVL PROPOSED REFUGE 0.60 1.10 2.90 2.90 W E L L BEDROOM KITCHEN LIV LIVING 3.15 21ST FLR LVL (REFUGE) PASS. LIVING 21ST FLR LVL (REFUGE) LIFT WELL LIFT WELL BEDROOM KITCHEN LIV 2.90 2.90 L I F T LIVING 20TH FLOOR LVL PASS. LIVING 20TH FLOOR LVL PROPOSED REFUGE 0.60 1.10 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 3.15 19TH FLR LVL (REFUGE) PASS. LIVING 19TH FLR LVL (REFUGE ) BEDROOM KITCHEN LIV 2.90 2.90 LIVING 18TH FLOOR LVL PASS. LIVING 18TH FLOOR LVL PROPOSED REFUGE 1.10 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 17TH FLR LVL (REFUGE) 3.15 PASS. LIVING 17TH FLR LVL (REFUGE) STAMP OF APPROVAL OF PLANS BEDROOM KITCHEN LIV 2.90 2.90 LIVING 16TH FLOOR LVL 16TH FLOOR LVL PASS. LIVING PROPOSED REFUGE 0.60 1.10 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 15TH FLR LVL (REFUGE) 3.15 PASS. LIVING 15TH FLR LVL (REFUGE) BEDROOM KITCHEN LIV 2.90 2.90 LIVING 14TH FLOOR LVL PASS. LIVING 14TH FLOOR LVL PROPOSED REFUGE 0.60 1.10 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 3.15 13TH FLR LVL (REFUGE ) PASS. LIVING 13TH FLR LVL (REFUGE ) 2.90 2.90 LIFT WELL LIFT WELL W E L L BEDROOM KITCHEN LIV LIVING 12TH FLOOR LVL PASS. LIVING 12TH FLOOR LVL PROPOSED REFUGE 0.60 1.10 2.90 2.90 L I F T BEDROOM KITCHEN LIV 69.95 69.95 LIVING 3.15 11TH FLR LVL (REFUGE) PASS. LIVING 11TH FLR LVL (REFUGE) BEDROOM KITCHEN LIV 2.90 2.90 LIVING 10TH FLOOR LVL 10TH FLOOR LVL PASS. LIVING PROPOSED REFUGE 0.60 1.10 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 3.15 9TH FLR LVL (REFUGE) PASS. LIVING 9TH FLR LVL (REFUGE) BEDROOM KITCHEN LIV 2.90 2.90 LIVING 8TH FLOOR LVL 8TH FLOOR LVL PASS. LIVING PROPOSED REFUGE 0.60 1.10 CONTENTS OF SHEET BEDROOM KITCHEN LIV 2.90 2.90 LIVING 3.15 7TH FLR LVL (REFUGE) PASS. LIVING 7TH FLR LVL (REFUGE) SECTION A-A , SECTION B-B BEDROOM KITCHEN LIV 2.90 2.90 LIVING 6TH FLOOR LVL PASS. LIVING 6TH FLOOR LVL W E L L LIFT WELL LIFT WELL 0.60 BEDROOM KITCHEN LIV 2.90 2.90 LIVING 5TH FLOOR LVL PASS. LIVING 5TH FLOOR LVL DESCRIPTION OF PROPOSAL & PROPERTY 2.90 L I F T 2.90 PROPOSED RESIDENTIAL BUILDING NO.2 (SORRENTO ) IN SECTOR - VI - A BEDROOM KITCHEN LIV LIVING 4TH FLOOR LVL ON PLOT BEARING C.T.S. No. 10 B/3 (PT.) OF VILLAGE POWAI, PASS. LIVING 4TH FLOOR LVL MUMBAI - 400 076. BEDROOM KITCHEN LIV 2.90 2.90 LIVING 3RD FLOOR LVL LIVING PASS. 3RD FLOOR LVL NAME & SIGNATURE OF OWNER BEDROOM KITCHEN LIV 2.90 2.90 LIVING 2ND FLOOR LVL LIVING 2ND FLOOR LVL PASS. 2.90 2.90 BEDROOM KITCHEN LIV LIVING 1ST FLOOR LVL 0.25 LIVING PASS. 1ST FLOOR LVL W E L L 600mm THK 1.20 1.20 PT TRANSFER PLATE TRANSFER LVL GIRDER BEAM SEEN IN STACK FIRE ELEVATION PARKING STP PLANT GIRDER BEAM 6.05 6.05 CONTROL ROOM GIRDER BEAM 0.60 M. THK PT TRANSFER PLATE 5.45 L I F T (CAPACITY ROOM SUB STATION 4.60 = 50 cu.m.) COLUMN SPLAYING 0.10 GARBAGE SHRI. SURENDRA HIRANANDANI C.A. TO OWNERS. ENTRANCE ROOM ENTRANCE LOBBY LVL STILT FLOORGR.LVL. PASS. LOBBY STILT FLOORGR.LVL. 0.10 CUTOUT FOR PUMP ROOM VENTILATION GIRDER BEAM JOB NO. DATE NAME. ADDRESS & SIGN OF ARCHITECT 5.10 5.00 5.00 FRESH AIR SHAFT (B2) 7.00 PUZZLE PARKING SPACE SPACE FOR ELE. PANELS FOR FIRE & PUZZLE PARKING COMMON SERVICE ( - 5.00 LVL.) FOR ( -5.00 LVL.) DOMESTIC PUMPS ELEC PANEL DRIVEWAY BASEMENT-1 FLOOR DRIVEWAY PASS. SERVICES BASEMENT-1 FLOOR 10.95 10.95 F.F TANK CUTOUT FOR PUMP ROOM 1,50,000L VENTILATION 5.95 LIFT WELL LIFT WELL 5.95 5.95 DRG.NO. SCALE PUZZLE PARKING PUZZLE PARKING ( - 10.95 LVL.) ( - 10.95 LVL.) 1:200 5.75 PUMP ARCHITECT FLUSH PUMP ROOM TANK DRIVEWAY BASEMENT-2 FLOOR DRIVEWAY PASS. ROOM BASEMENT-2 FLOOR 2.10 1.85 DRAWN BY SUJIT SUHAS JOSHI SECTION : A- A SECTION : B-B N CHK. BY. OLYMPIA, CENTRAL AVENUE, HIRANANDANI BUSINESS PARK, SCALE:-1:200 SCALE:-1:200 AR POWAI, MUMBAI-400076