PLAN AS PER  PLAN APPROVED  PROFORMA - I DT. 30.03.016 MODF.DCR-1991 DCPR 2034 TOTAL   A AREA STATEMENT D TENEMENT STATEMENT  1 AREA OF PLOT 4615.10 ---- 4615.10 i GROSS BUILT UP AREA (16 ABOVE) 8222.55                           (a) AREA OF SET BACK ---- ---- ---- ii DEDUCTION FOR NON-RESI. AREAS (shops etc.) ---               (b) AREA OF D.P. ROAD ---- ---- ----               iii AREA FOR TENEMENTS (i - ii) 8222.55                (c) 7.5% AMENITY SPACE ---- ---- ---- iv TENEMENTS PERMISSIBLE ( 450 T /hectare)   370.00  TOTAL DEDUCTIONS (a+b+c) ---- ---- ---- v TENEMENTS PROPOSED ( BLDG. NO 1 (D wing) = 15 BLDG. NO 2 = 85 ) 100.00             ---- vi TENEMENTS EXISTING           NET PLOT AREA 4615.10 4615.10 ( BLDG. NO 1 (A,B & C wings) 56.00    2 DEDUCTIONS FOR TOTAL TENEMENTS 156.00      A FOR RESERVATION /ROAD AREA ---- ---- ---- E PARKING STATEMENT                   (a) ROAD SET-BACK AREA TO BE HANDED OVER(100%) REG.NO 16 ---- ---- ---- i PARKING REQUIRED BY REGULATIONS FOR ---          (b)PROP.D.P ROAD AREA TO BE HANDED OVER (100%) REG.NO 16 ---- ---- ---- 3.00 WD PATHWAY             REQUIRED PARKING 50.00  BALC. PROJ.               (c) i RESERVATION AREA TO BE HANDED OVER(100%) REG.NO 17 ---- ---- ---- ---   ii COVERED GARAGES PERMISSIBLE     3.00 WD PATHWAY  ---  ---- ---- ---- COVERED GARAGES PROPOSED  4.98) LIFT (4.20x       ii RESERVATION AREA TO BE HANDED OVER(100%) AS PER AR REG.NO 17 iii          ---    B FOR AMENITY AREA CAR   S.TOIL   (1.20x BALC. PROJ. 1.52) (a) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER REG.NO.14(A) (5% of 4615.10) ---- ---- ---- SCOOTER/MOTORCYCLE ---  SPACE FOR ELECTRIC METER   (3.00x   2.14)  1.83) --- LIFT 1.83) (1.98x LIFT SUCTION TANK (1.98x PUMP ROOM (b) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER REG.NO.14(B) ---- ---- ----  OUTSIDER (VISITORS)          ---- ---- ---- iv TOTAL PARKING PROVIDED 34.00   BALC. PROJ.  (c) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER REG.NO.35 (ABEYANCE)  2.40 0.45 mt.wd. chajja  ---- ---- ---- PARKING SPACES ALREADY CONDONED AS PER CONCESSIONS 12.40              C DEDUCTION FOR EXISTING BUILT-UP AREA TO BE RETAINED IF ANY/LAND COMPONENT OF 19.00     SOCIETY OFFICE   (3.40x 3.12) S.slab  APPROVED UNDER NO. MCP/134 DT. 01/02/2016 FOR WING 'B'             Duct LIFT  METER ROOM F LOADING & UNLOADING STATEMENT 0.75 mt.wd. BUILDING LINE ABOVE ---- ---- ---- chajja EXISTING BUA AS PER REG. UNDER WHICH THE DEVELOPMENT WAS ALLOWED F.R.D.  4.98) LIFT  LOBBY 13.30  STILT STILT              (4.20x       Servent Toilet LIFT               3 TOTAL DEDUCTIONS [ 2(A)+2(B)+2(C)] ---- ---- ---- LOADING & UNLOADING REQUIRED --- Duct 1   S.slab 12.70  BUILDING LINE ABOVE  4 BALANCE AREA OF PLOT( 1 MINUS 3) 4615.10 ---- 4615.10 2 LOADING & UNLOADING PROPOSED ---  BALC. PROJ.   3.00 WD PATHWAY         4.50           4(a) DEDUCTION FOR RECRETION GROUND (15%) DCR 1991 692.27 ---- ---- CERTIFICATE OF AREA  5 PLOT AREA UNDER DEVELOPMENT [1-2(A)+2(B)] 3922.83 692.27 4615.10 CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON     6 ZONAL (BASIC) F.S.I (1 OR 1.33) 1.00 1.00 1.00 15.04.2019 AND THAT THE DIMENSIONS OF THE SIDES,ETC.,OF THE R.G. - A PLOT STATED ON THE PLAN ARE AS MEASURED ON SITE AND THE 7 PERMISSIBLE BUILT-UP AREA AS PER ZONAL(BASIC) F.S.I(5X6) 3922.83 692.27 4615.10 AREA SO WORKED OUT IS 4615.10 (FOUR THOUSAND SIX HUNDRED   1 23.00 X 26.00 598.00   8 B.U.A EQUAL TO LAND AREA HANDED OVER AS PER 3(a) REG.NO 30(A) FIFTEEN POINT TEN SQ.MTR.) AND TALLIES WITH THE AREA STATED 2 8.00 X 11.75 94.00 IN THE DOCUMENT OF OWNERSHIP/TOWN PLANNING SCHEME  A TOTAL 692.00 (a) ADDITIONAL BUA FOR 2(A)(c)(i) & 2(B) ABOVE WITH IN CAP OF ADMISSIBLE "TDR" AS PER RECORDS.  8.31  TABLE NO.12 ON BALANCE PLOT. ---- ---- ---- Digitally signed   R.G. - 2 692.00 SIDDHART by   SIDDHARTH S   (b) ADDITIONAL BUA FOR 2(A)(a) & 2(B) ABOVE TO BE UTILIZED OVER AND ABOVE HS NADKARNI   THE PERMISSIBLE F.S.I AS PER COLUMN NO.7 TABLE- 12 OF REG.NO 30(A) AND TO THE ---- ---- ---- Date: 2021.07.05     MENTIONED IN TABLE 12A REG.32(200% OR 250%) NADKARNI 19:47:54 +05'30' 482    481      480    0 3.0 1.0  1. 69 7 (c) ADDITIONAL BUA IN CASE OF 2(A)(c)(ii) AS PER REG.NO 17(1).NOTE 20 (vii) & (viii) AS PER 6.00 47 ---- ---- ----      1. 3. 69 AR POLICY ON REMAINING PLOT(Y% AS PER TABLE NO.5 OF REG.17(1)        9 ADDITIONAL/ INCENTIVE BUA WITHIN CAP OF "ADDMISSIBLE TDR" AS PER TABLE NO.12 ON A PLOT ---- ---- ----   (a) IN LIEU OF COST OF CONSTRUCTION OF AMENITY BUILD. AS PER REG.NO 30(A)3(d) ---- ---- ----    PAVED R.G. (b) 50% OF REHABE COMPONENT AS PER REG.33(7)(A) ---- ---- ----   (c) 15% FOR SR NO.7 OR ABOVE OR 10SQ.MT PER REHAB TENEMENTS AS PER REG. 33(7)(B) ---- ---- ----  1 17.29 X 4.20 X 0.50 X 2 72.62 2 1.07 X 3.00 X 0.50 X 2 3.21 i.e (15% X = SQ.MT OR 10 SQ.MT X NO OF TENEMENT= SQ.MT) ---- ---- ---- 3 3.47 X 1.69 X 0.50 X 2 5.86 10 BUA DUE TO "ADDITIONAL F.S.I ON PAYMENT OF PREMIUM AS PER TABLE NO.12   II TOTAL 81.69 OF REG.NO 30(A)(4 X 50%)(Permissible : 4615.10 X 50%= 2307.55) ALREADY CLAIMED 276.0 SQMT   SAY PAVED R.G. 82.00 NOW CLAIMED 119.11 SQMT = 395.11 SQ.MT. 276.00 119.11 395.11    11 B.U.A DUE TO ADMISSIBLE TDR AS PER TABLE NO.12 OF REG NO. 30(A) & 30(2)  SR NO. 5 X 50% OR 70% OR 90% OR 100%    (a) 100% TDR (Permissible : 4615.10X100% = 4615.10 SQ.MT)    RESERVATION TDR ALREADY CLAIMED IN BLD. NO. 2 150. 00 SQ.MTR.    1353.35 ---- 1353.35   RESERVATION TDR ALREADY CLAIMED IN BLD. NO. 1 U/R 1203.35 SQ.MTR.  20 16 15 14    Syed byDigitally signed Syed Ghazali  19 17  18 13 12   (b) F.S.I. ADVANTAGE AS PER DC (10)(2) ALREADY CLAIMED FOR BLDG. NO. 1:- 468.64 SQ.MT. 1569.64 ---- 1569.64 Nasar      FOR BLDG. NO. 2:- 1101.00 SQ.MT.  Ghazali Date:  2021.07.05   (c) SLUM T.D.R. ---- ---- ---- Nasar 22:35:58 +05'30'  3.00 WD PATHWAY  BALC. PROJ.   811.38  12 PERMISSIBLE BUILT-UP AREA (7+ 8 +9 +10 +11) 7121.82 7933.20 3.00 13 TOTAL BUILT-UP AREA    (a) RETAINED BUILT-UP AREA BUILDING NO.1 ( WING-A+B+C) STILT  21 09   10 11 PART OCCUPATION BLD. NO.1 OF WING-A & C dt. 15.02.2001 = 1175.44 SQ.MTR. 1175.44 ---- 1175.44 VIJAY  PARESH Digitally signed 3.00 WD PATHWAY  LIFT  PART OCCUPATION BLD. NO.1 OF WING- B dt. 26.09.2016 = 1885.83 SQ.MTR. MACHI Digitally signed by VIJAY by PARESH 28.22 1885.83 ---- 1885.83 MACHINDRA BADADE SURYAK SURYAKANT (4.20x DN: c=IN, o=Personal, 4.98) 2.5.4.20=2339d8d194b291795f9aeb   11484cd2bbc73eb95f4e8b5b6a3f25    (b) NOW PROPOSED BUILT-UP AREA BUILDING NO. 1 ( WING D) ---- 335.87 335.87 NDRA bef3d1a6a569, postalCode=400087, st=Maharashtra, serialNumber=9427f6c8bea79fca827 8e538792a7f36931b422d3b4f164be ANT PANCHAL 2b7005d09f24ca4, cn=VIJAY Date:   BADA MACHINDRA BADADE Date: 2021.07.06 19:37:43 +05'30' 2021.08.02 PANCHA 15:42:56  (c) PROPOSED BUILT-UP AREA BUILDING NO.2 FILE NO. CHE/7677/AR 4048.21 ---- 4048.21 VINOD Digitally signed by VINOD 07 08   DE KONDIRAM KONDIRAM KEKAN TOTAL L +05'30' Date: 2021.08.03 17:45:23 +05'30'   6.00 7109.48 335.87 7445.35 KEKAN  STILT  ---- ---- ---- S.TOIL (1.20x 14 TDR GENERATED IF ANY AS PER 30(A) BALC. PROJ.  1.52)    15 FUNGIBLE COMPENSATORY AREA AS PER REG NO.31(3) ---- ---- ----  SPACE FOR ELECTRIC    06  METER  (3.00x  ---- ---- ---- 2.14)  (a) (i) PERMISSIBLE FUNG. COMPENSATORY AREA FOR REHAB. COMPONENT WITHOUT    3.000  LIFT LIFT CHARGING PREMIUM SUCTION TANK (1.98x (1.98x PUMP ROOM  1.83) 1.83) (a) (ii) FUNGIBLE COMPENSATORY AREA AVAILED FOR REHAB. COMPONENT WITHOUT ---- ---- ----       CHARGING PREMIUM Digitally    SIDDH signed by   (b) (i) PERMISSIBLE FUNG. COMPENSATORY AREA BY CHARGING PREMIUM FOR RESIDENTIAL 660.04 117.55 777.59 BALC. PROJ. 22 17.44  SIDDHARTH  4.30 2.14 1.07 4.21 2.40 2.10 3.62 3.75 WING -B + WING -D 1885.83 + 335.87 = 2221.70 ( 2221.70 X 35% ) & (335.87 X 35% = 117.55 smt.) ARTH S S NADKARNI 4.60  0.45 mt.wd. chajja STILT Date: 1.50 3.91 0.75 1.50 0.45   (b) (ii) FUNGIBLE COMPENSATORY AREA AVAILED ON PAYMENT FOR PREMIUM FOR RESIDENTIAL 659.81 117.39 777.20 NADK 2021.07.05  0.75 mt.wd. chajja  SOCIETY OFFICE  (Already claimed for wing B 225.16 + wing D 434.65) + now claimed for wing D 117.39 sq.mtr.  3.10 12.40   04 (3.40x  3.12)  0.75 mt.wd. chajja S.slab Duct LIFT 1.68X1.68 0.75 mt.wd. chajja METER ROOM (b) (iii) PERMISSIBLE FUNG. COMPENSATORY AREA BY CHARGING PREMIUM FOR COMMERCIAL ---- ---- ---- ARNI +05'30' 19:48:16 0.75 mt.wd. 1.50 2.18X1.20 Z PUMP ROOM 3.20X1.06 chajja 13.30 Z F.R.D. (b) (iv) FUNGIBLE COMPENSATORY AREA AVAILED ON PAYMENT FOR PREMIUM FOR COMMERCIAL ---- ---- ---- 05 LIFT STILT LOBBY STILT    7.12 X 1.50 (1.60x  1.21) 3.000 16 Z TOTAL BUA PROPOSED INCLUDING FCA [13+15(a)(ii)+15(b)(ii)+15(b)(iv)] 7769.29 453.26 8222.55 03  02 STILT 01 LIFT  Servent Toilet 1.20x1.80 1.98X1.83 0.60 17 F.S.I CONSUMED ON NET PLOT(13/4) 1.61 1.20  ENTRANCE LOBBY Duct 3.28 X 5.14 OTHER REQUIREMENTS ---- ---- ----  12.70 Z S.slab  A RESERVATION / DESIGNATION     Slope 1:5   BALC. PROJ. 4.50 (a) NAME OF RESERVATION ---- ---- ----  1.50 0.75 mt.wd. chajja 0.75 mt.wd. chajja  3.00 WD PATHWAY  1.20 7.08 1.98 7.18    CANOPY (b) AREA OF RESERVATION LAND HANDED OVER AS PER REG.NO 17 ---- ---- ----    4.50   4.50   (c) B.U.A OF AMENITY TO BE HANDED OVER AS PER REG.NO 17 ---- ---- ----      (d) AREA / BUILT-UP AREA OF DESIGNATION ---- ---- ----  B PLOT AREA / BUILT-UP AMENITY TO BE HANDED OVER AS PER REG NO.  (a) 14(A) ---- ---- ----   (b) 14(B) ---- ---- ----  (c) 15 ---- ---- ----            0.75 M. W. CHAJJA WING - C 0.75 M. W. CHAJJA 4'-0" WD BALC. 4'-0" WD BALC.    0.75 M. W. CHAJJA (1.22)  B1 (1.22) B1 0.75 M. W. CHAJJA      BED ROOM LIVING ROOM BED ROOM 0.75 M. W. CHAJJA LIVING ROOM  9'-9"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" (2.97x3.67) 10'-0"x12'-0"" (3.05x3.67) (2.97x3.67)   (3.05x3.67)  UP DN  2 1   BATH LIFT 1.76x0.91 KITCHEN 1.90x0.91 6'-6"x4'-1" 5'-3"x4'-1" KITCHEN  2'-3"x4'-0"     10'-0"x7'-6" (3.05x2.28)  WC 10'-0"x7'-6" (3.05x2.28)    (0.91x1.22)    1.20 M. W. CHAJJA   0.75 M. W. CHAJJA 2.29 x 1.54 0.91 M.CANTILEVER 0.75 M. W. CHAJJA TOIL    1.37x0.91 BED   3.66 x 3.51 BED 3.35 x 3.13 PASS    2.74 x 1.07 1.37x0.91 1.53x1.10 TOIL 1.34 x 1.22 S.S. 0.75 M. W. CHAJJA 1.07 M.CANTILEVER   LIV 1.20 M. W.  2.13 x 1.22  5.34 x 3.66 KIT CHAJJA 2.59 x 2.44          0.75 M. W. CHAJJA WING - C 0.75 M. W. CHAJJA   3 1.98 x 1.37    0.75 M. W. CHAJJA 4'-0" WD BALC. 4'-0" WD BALC.     LIFT LIFT WING - B DN 1.83 x 1.98 1.83 x 1.98 0.75 M. W. CHAJJA (1.22) B1 (1.22) B1 0.75 M. W. CHAJJA      UP 1.37x1.67 LOBBY COUNTED IN FSI 3.96 x 1.53 BED ROOM LIVING ROOM BED ROOM  0.75 M. W. CHAJJA LIVING ROOM 9'-9"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" (2.97x3.67) 10'-0"x12'-0"" 4 (3.05x3.67) (3.05x3.67) (2.97x3.67)  0.75 M. W. CHAJJA   1.07 M.CANTILEVER  2.13 x 1.22  1.20 M. W. 2 UP DN 1  KIT  CHAJJA LIV 2.59 x 2.44 5.34 x 3.66  17.44 A BATH LIFT 1.76x0.91 KITCHEN 1.90x0.91 5'-3"x4'-1" KITCHEN 1.53x1.10 6'-6"x4'-1"  4.30 2.14 1.07 4.21 2.10 3.62 1.37x0.91 2'-3"x4'-0" S.S. 10'-0"x7'-6"   (3.05x2.28) 10'-0"x7'-6"  TOIL  WC (3.05x2.28) 1.34 x 1.22   0.45 mt.wd. chajja   (0.91x1.22)  PASS    0.75 M. W. CHAJJA 0.91 M.CANTILEVER 1.20 M. W. CHAJJA 2.74 x 1.07  0.75 M. W. CHAJJA 1.20 M. W. CHAJJA 1.50 1.50 0.22 0.75 1.50 0.45 1.55 2.29 x 1.54 0.91 M.CANTILEVER 0.75 M. W. CHAJJA 0.75 mt.wd. chajja TOIL 1.37x0.91    BED 2.80 1.37x0.91 3.66 x 3.51 BED  3.91 BED  3.35 x 3.13   4.07  3.66 x 3.51 BED 3.35 x 3.13 TOIL  4.00 1.00 0.75 mt.wd. chajja 1.25 1.54 x 2.29 0.60 0.60  S.slab  1.91  0.75 M. W. CHAJJA 0.75 mt.wd. chajja Duct LIFT UP 1.50 BED ROOM PASS    1.50 1.68X1.68 DN 1.50 3.32 X 3.00 2.74 x 1.07 v    0.75 mt.wd. WC 1.37x0.91  3'-0"x WC BATH chajja  4'-0" 1.53x1.10 chajja (0.91x TOIL KITCHEN  1.22) KITCHEN  F.R.D. KITCHEN  1.34 x 1.22 S.S. 10'-0"x7'-6" 2'-3"x4'-0"  TOILET 2.10 X 2.85 0.75 M. W. CHAJJA Z Z 0.23 1.07 M.CANTILEVER 10'-0"x7'-6" LOBBY 2.28 X 1.21 (3.05x2.28) BED ROOM 1.10X2.10 BATH LIFT 1.90x0.91 (3.05x2.28) 2.90 X 3.15 7.12 X 1.50 1.98 X 1.24 1.60 x 1.21 1.76x0.91 TOILET  11.24 1.20 M. W. Service Slab F.R.D. 2.10 X1.22  F.R.D. 0.75 M. W. CHAJJA LIV 2.13 x 1.22 Z 5.34 x 3.66 Duct 1 2 KIT 10 cm. thk. wall  9.69 CHAJJA  6 2.59 x 2.44 5 DN UP TOILET LIFT  TOILET 2.10 X 1.22 LIVING ROOM BED ROOM 1.98X1.83 0.60 0.60 3 BED ROOM LIVING ROOM 2.10 X 1.10 9'-9"x12'-0" 10'-0"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" 1.20    (3.05x3.67) (2.97x3.67) 1.98 x 1.37 LIVING LIVING   (2.97x3.67) (3.05x3.67) chajja  0.75 M. W. CHAJJA 0.60 0.60 Duct 3.20 X 5.14 3.41 X 5.14  LIFT LIFT WING - B DN 1.83 x 1.98 1.83 x 1.98 Z S.slab BED ROOM v  KITCHEN     BED ROOM 3.24 X 3.50 2.14 X 2.45 4'-0" WD BALC.  4'-0" WD BALC. 3.35 X 3.00 0.75 M. W. CHAJJA   UP 1.37x1.67 0.75 M. W. CHAJJA LOBBY (1.22) B1 (1.22) B1 COUNTED IN FSI 3.96 x 1.53  4 0.75 M. W. CHAJJA   0.75 M. W. CHAJJA 1.20 0.55 0.75 mt.wd. chajja chajja  0.75 M. W. CHAJJA 0.75 mt.wd. chajja   1.07 M.CANTILEVER 2.13 x 1.22 1.20 M. W.     WING - A    KIT 1.20 7.08 1.98 7.18   CHAJJA LIV 2.59 x 2.44 5.34 x 3.66  17.44 A  1.53x1.10 4.30 2.14 1.07 4.21 2.10 3.62 A 1.37x0.91 TOIL S.S.   1.34 x 1.22 0.45 mt.wd. chajja PASS    0.75 M. W. CHAJJA 0.91 M.CANTILEVER 2.74 x 1.07  1.20 M. W. CHAJJA 1.50 0.75 1.50 1.50 0.45 0.22 1.55   0.75 mt.wd. chajja 1.37x0.91  BED 2.80 3.66 x 3.51 BED   B 3.91  TOIL 3.35 x 3.13 4.07 4.00 1.00 1.25 S  0.75 mt.wd. chajja 1.54 x 2.29 0.60 0.60  S.slab  1.91   0.75 M. W. CHAJJA 0.75 mt.wd. chajja Duct LIFT UP 1.50 1.50 10 1.68X1.68 DN 1.50 Cross beam 11     0.75 mt.wd. WC at 3.0 m. height   3'-0"x WC Cross beam 12 BATH chajja  4'-0" chajja (0.91x  KITCHEN  at 3.0 m. height  1.22) KITCHEN  F.R.D. Z 10'-0"x7'-6" 2'-3"x4'-0"  10'-0"x7'-6" Z 0.23 LOBBY 2.28 X 1.21 (3.05x2.28) 1.90x0.91 BATH LIFT 1.98 X 1.24 1.60 x 1.21 (3.05x2.28) STILT 7.12 X 1.50 STILT  1.76x0.91 11.24 Service Slab F.R.D. 0.75 M. W. CHAJJA Z  Syed Digitally signed Duct by Syed Ghazali  9.69   6 5 DN UP Ghazali Nasar Cross beam LIFT  Date: 2021.07.05 BED ROOM LIVING ROOM LIVING ROOM BED ROOM at 3.0 m. height 1.98X1.83 0.60  Nasar 22:37:00 +05'30' 9'-9"x12'-0" 10'-0"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" 1.20  (3.05x3.67) (2.97x3.67) (2.97x3.67) (3.05x3.67) FITNESS CENTER chajja VIJAY Digitally signed by VIJAY 0.60 0.60 Duct 3.20 X 4.70 MACHINDRA BADADE DN: c=IN, o=Personal, Digitally signed by Z Area - 17.50 sq.mt. MACHIND 2.5.4.20=2339d8d194b291795f9aeb 11484cd2bbc73eb95f4e8b5b6a3f25 PARESH PARESH S.slab bef3d1a6a569, postalCode=400087, SURYAKANT 6 RA st=Maharashtra, SURYAKAN PANCHAL VINOD KONDIRAM KONDIRAM Digitally signed by VINOD  serialNumber=9427f6c8bea79fca827 3 9 8e538792a7f36931b422d3b4f164be KEKAN 5 2b7005d09f24ca4, cn=VIJAY T PANCHAL 15:43:31 Date: 2021.08.02 KEKAN Date: 2021.08.03 17:45:37 +05'30'  BADADE MACHINDRA BADADE 2 8 Date: 2021.07.06 19:40:22 +05'30' +05'30' 4'-0" WD BALC. 4'-0" WD BALC. 0.75 M. W. CHAJJA 4   0.75 M. W. CHAJJA 7 (1.22) B1 (1.22) B1 1 B B S    Slope 1:5 0.44 0.75 M. W. CHAJJA   0.75 M. W. CHAJJA Bldg. line above 1.20 chajja 0.55     0.75 mt.wd. chajja 0.75 mt.wd. chajja    WING - A        1.20 7.08 1.98 7.18    B Digitally signed A SIDDHA by SIDDHARTH RTH S Date: S NADKARNI   NADKAR 2021.07.05  19:48:51 NI +05'30'     17.44 11.72 A A 4.30 2.14 1.07 4.21 2.10 3.62 4.30 2.14 1.07 4.21 0.45 mt.wd. chajja 0.45 mt.wd. chajja 1.50 1.50 0.22 1.50 1.50 0.75 1.50 0.45 1.55 0.75 1.50 0.75 mt.wd. chajja 0.75 mt.wd. chajja 2.80 2.80 3.91 3.91 4.07 4.00 1.00 1.25 4.07 4.00 1.00 0.75 mt.wd. chajja 0.75 mt.wd. chajja 0.60 0.60 0.60 0.60 S.slab S.slab 1.91 UP 1.91 UP 0.75 mt.wd. chajja Duct LIFT BED ROOM 0.75 mt.wd. chajja Duct LIFT 1.50 1.50 1.50 1.50 1.68X1.68 DN 1.50 3.32 X 3.00 v 1.68X1.68 DN 1.50 0.75 mt.wd. 0.75 mt.wd. chajja chajja F.R.D. KITCHEN chajja F.R.D. chajja TOILET 2.10 X 2.85 TOILET 0.23 0.23  BED ROOM 1.10X2.10 LOBBY BED ROOM 1.10X2.10 LOBBY 7.12 X 1.50 7.12 X 1.50 2.90 X 3.15 2.90 X 3.15 TOILET 11.24 Service Slab Service Slab F.R.D. F.R.D. 2.10 X1.22 F.R.D. F.R.D. Z Z Duct Duct 1 2 1 10 cm. thk. wall 9.69 TOILET LIFT 2.10 X 1.22 LIFT TOILET 1.98X1.83 0.60 0.60 TOILET 1.98X1.83 0.60 0.60 2.10 X 1.10 2.10 X 1.10 1.20 1.20 LIVING LIVING LIVING TERRACE chajja chajja 0.60 0.60 0.60 0.60 Duct 3.20 X 5.14 3.41 X 5.14 Duct 3.20 X 5.14 Z S.slab BED ROOM v Z S.slab KITCHEN 3.24 X 3.50 KITCHEN BED ROOM BED ROOM R.C.C WALL 2.14 X 2.45 2.14 X 2.45 3.35 X 3.00 3.35 X 3.00  1.50 MTR. PARAPET WALL HEIGHT        1.20 1.20 0.75 mt.wd. chajja chajja 0.55 0.75 mt.wd. chajja chajja 0.55 0.75 mt.wd. chajja 0.75 mt.wd. chajja  0.75 M. W. CHAJJA WING - C 0.75 M. W. CHAJJA 1.20 7.08 1.98 7.18 1.20 7.08 1.98 4'-0" WD BALC. 4'-0" WD BALC.  0.75 M. W. CHAJJA   (1.22) B1 (1.22) B1 0.75 M. W. CHAJJA  A  A     BED ROOM LIVING ROOM BED ROOM 0.75 M. W. CHAJJA LIVING ROOM 9'-9"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" (2.97x3.67) 10'-0"x12'-0"" (3.05x3.67) (3.05x3.67) (2.97x3.67)  UP DN  2 1  0.45 mt.wd. chajja 1.50 0.75 1.50 LIFT 1.76x0.91 1.50 1.90x0.91 BATH 5'-3"x4'-1" KITCHEN 2.30 0.49 KITCHEN 6'-6"x4'-1"  10'-0"x7'-6" 2'-3"x4'-0"   (3.05x2.28) 10'-0"x7'-6" 1.05 7 0.97 8 1.05 9 3.91  WC (3.05x2.28)  4.00 1.00    0.60 0.60  (1.22x0.91)   0.50 0.30 S.slab 3.20 LIFT M/C 1.20 M. W. CHAJJA  Duct 0.45 0.75 M. W. CHAJJA 0.76 x 0.15 ROOM 1.50 1.50 10 1.50 0.91 M.CANTILEVER 0.75 M. W. CHAJJA DN 0.75 mt.wd. 9 6   3.20 chajja 3.04 W.C. 5 F.R.D. KIT / DIN   3.66 x 3.51 BED 1.37x0.91 5.33 x 3.13 0.15 1.08 OVER HEAD TANK 1.05 2.25 3.32 8 2.70 4.10 4 F.R.D. 1.07x   6.80 1.07 FLAT NO. 1 AT 2ND TO 9TH FLOOR 1.52x0.38 FLAT NO. 2 AT 2ND TO 8TH FLOOR 1.37x0.91 1.53x1.10 TOIL 7 6 LIFT M/C S.S. 3.34 ROOM 1.34 x 1.22 3.19 FLAT NO. 2 0.75 M. W. CHAJJA 4.15 FLAT NO. 1 1.07 M.CANTILEVER RCA - 55.81 Sq.mt. TERRACE 2.87 2.29  4.84 1.20 M. W. 1.20 5 RCA - 52.24 Sq.mt.  LIV 3 0.60 0.60 2.13 x 1.22 Duct 5.34 x 3.66 BED 2 1.95 6.70 CHAJJA 2.59 x 2.44 S.slab 0.90 4  6.62 2.21 0.30 3 1.05 1 3 1 2   1.98 x 1.37    1.50 MTR. PARAPET WALL HEIGHT 0.75 M. W. CHAJJA 0.50 5.86 0.49  LIFT LIFT 1.20 WING - B DN 1.83 x 1.98 1.83 x 1.98 0.75 mt.wd. chajja chajja        UP 1.37x1.67 LOBBY COUNTED IN FSI 3.96 x 1.53  NO. SIZE SQ.MT. NO. SIZE SQ.MT. 4  1 1 2.21 X 0.50 01.11  0.75 M. W. CHAJJA 5.86 X 0.30 01.76   1.07 M.CANTILEVER  2.13 x 1.22 1.20 M. W. 2 0.49 X 0.30 00.15 2 2.29 X 1.95 04.47   BED 3 6.62 X 1.05 06.95 CHAJJA  LIV 2.59 x 2.44 3 6.80 X 4.84 32.91 5.34 x 3.66  17.44 4 1.08 X 0.15 00.16 4 6.70 X 0.90 06.03 A 1.53x1.10 4.30 2.14 1.07 4.21 2.10 3.62 5 2.25 X 3.04 06.84 5 2.87 X 1.20 03.44 1.37x0.91 S.S.  TOIL 6 1.05 X 3.34 03.51 1.34 x 1.22 6 3.32 X 3.20 10.62 0.45 mt.wd. chajja 1.07x 1.52x0.38 7 2.30 X 1.05 02.42 7 2.70 X 3.19 08.61   0.75 M. W. CHAJJA 0.91 M.CANTILEVER 1.07 8  1.20 M. W. CHAJJA 1.50 0.75 1.50 0.22 1.55 8 0.45 X 0.97 00.44 4.15 X 4.10 17.01 1.50 0.45 0.75 mt.wd. chajja 9 0.50 X 0.30 00.15 W.C.  2.80 9 0.49 X 1.05 00.51  BED KIT / DIN 3.66 x 3.51  3.91 10 3.20 X 0.30 00.96 1.37x0.91 5.33 x 3.13   4.07 0.76 x 0.15 4.001.00 1.25  0.75 mt.wd. chajja TOTAL 55.81 TOTAL 52.24  0.60 0.60  S.slab 1.91  0.75 M. W. CHAJJA 0.75 mt.wd. chajja Duct LIFT UP 1.50 1.50 BED ROOM RERA CARPET 55.81 SQ.MT. RERA CARPET 52.24 SQ.MT.  1.68X1.68 DN 1.50 3.32 X 3.00 v      0.75 mt.wd. WC  3'-0"x WC  BATH chajja  4'-0" chajja  (0.91x KITCHEN 1.22) KITCHEN  KITCHEN  F.R.D. 10'-0"x7'-6" 2'-3"x4'-0"  Z TOILET 2.10 X 2.85 Z 0.23  2.28 X 1.21 (3.05x2.28) 10'-0"x7'-6" BED ROOM 1.10X2.10 LOBBY BATH LIFT 7.12 X 1.50 1.90x0.91 1.98 X 1.24 1.60 x 1.21 (3.05x2.28) 2.90 X 3.15 TOILET 1.76x0.91 11.24  Syed Digitally signed Service Slab F.R.D. F.R.D. 2.10 X1.22 by Syed Ghazali   Z Duct Ghazali 1 2 Nasar 10 cm. thk. wall  9.69  6 5 DN UP  Date: 2021.07.05 LIFT TOILET 2.10 X 1.22  Nasar 22:37:36 +05'30' TOILET 1.98X1.83 0.60 0.60 BED ROOM LIVING ROOM LIVING ROOM BED ROOM 2.10 X 1.10 9'-9"x12'-0" 10'-0"x12'-0" 10'-0"x12'-0" 9'-9"x12'-0" 1.20 (2.97x3.67) (3.05x3.67)  (3.05x3.67) (2.97x3.67) LIVING LIVING VIJAY Digitally signed by VIJAY PARESH Digitally signed chajja MACHINDRA BADADE DN: c=IN, o=Personal, by PARESH 0.60 0.60 Duct 3.20 X 5.14 3.41 X 5.14 SURYAKA SURYAKANT 2.5.4.20=2339d8d194b291795f9 MACHIN aeb11484cd2bbc73eb95f4e8b5b 6a3f25bef3d1a6a569, VINOD Digitally signed by VINOD Z S.slab BED ROOM v postalCode=400087, PANCHAL KONDIRAM KEKAN KITCHEN DRA st=Maharashtra, serialNumber=9427f6c8bea79fca NT KONDIRAM  Date: 2021.08.02 Date: 2021.08.03 17:45:48 8278e538792a7f36931b422d3b4 3.24 X 3.50 f164be2b7005d09f24ca4, BED ROOM BADADE 2.14 X 2.45 cn=VIJAY MACHINDRA BADADE PANCHAL 15:43:49 +05'30' KEKAN +05'30'  Date: 2021.07.06 19:40:53 +05'30' 3.35 X 3.00 4'-0" WD BALC. 4'-0" WD BALC. 0.75 M. W. CHAJJA   0.75 M. W. CHAJJA (1.22) B1 (1.22) B1        0.75 M. W. CHAJJA   0.75 M. W. CHAJJA 1.20 0.55    0.75 mt.wd. chajja chajja 0.75 mt.wd. chajja WING - A         1.20 7.08 1.98 7.18   A SIDDHAR Digitally signed by SIDDHARTH TH S S NADKARNI  Date: NADKAR 2021.07.05   NI 19:49:13 +05'30'   4.21 WING D - BUILT-UP AREA CALC.FOR 17.44 0.23 TYPICAL FLOOR (2ND TO 8TH) 4.30 2.14 1.07 3.98 2.10 2.53 1.09 2.14 6 NOS. LENGTH X WIDTH IN SQMTS 4.30 S1 B.U.A. SUMMARY WING - D 2 4 1.55 5 1.33 0.64 ADDITION 1 2.16 3 S1 0.23 2.80 2.14 L1 Proposed Proposed gross 3.39 A 17.44 X 11.24 196.03 0.23 1.91 S2 7 0.22 1.07 ST.CASE & LIFT DEDUCTION AT 1ST FLR. Floors B.U.A. 4.07 a DEDUCTION in sq.mt. S1 4.21 X 4.30 18.10 1.23 L1 1.23 1 4.30 X 3.39 14.58 P1 L2 L1 2.14 X 2.14 4.58 2 2.14 X 2.16 4.62 1.50 P2 Expansion joint 0.47 0.23 P3 L2 2.44 X 2.29 5.59 L3 0.91 6.19 1st floor 0.00 3 1.07 X 4.07 4.36 1.99 P1 1.07 X 0.23 0.25 2nd floor 118.51 P2 4 2.10 X 2.80 5.88 118.51 0.15 0.40 P2 6.19 X 1.50 9.29 3rd floor P1 1.50 5 2.53 X 1.55 3.92 L2 2.29 4th floor P3 0.40 X 0.15 0.06 11.24 118.51 7.12 4.70 6 1.09 X 1.33 1.45 5th floor 118.51 2.44 TOTAL 37.87 6th floor 118.51 L4 9.69 7 0.64 X 0.22 0.14 7th floor 118.51 2.14 8 1.98 X 0.55 1.09 8th floor 118.51 2.14 9 1.20 X 3.15 3.78  9th floor 57.87 TOTAL 39.82 TOTAL 887.91 b ST.CASE & LIFT DEDUCTION  S1 0.23 X 2.80 0.64 3.15 ST.CASE & LIFT DEDUCTION AT 9TH FLR. S2 3.98 X 4.30 17.11 4.21 0.55 S1 4.21 X 4.30 18.10 9 L1 0.23 X 1.23 0.28 8 L1 2.14 X 1.23 2.63 L2 1.91 X 1.23 2.35   1.20 7.08 1.98 7.18 L3 1.99 X 0.91 1.81 L2 1.99 X 0.91 1.81 4.30  S1 L3 2.29 X 2.14 4.90  L4 2.14 X 2.14 4.58 2.14 1.23 L1 P1 1.07 X 0.23 0.25      P1 7.12 X 1.50 10.68 1.99 0.23 P2 7.27 X 1.50 10.91   P2 1.07 X 0.23 0.25 0.91 L2 1.07   P3 1.23 X 0.15 0.19   TOTAL 37.70 P1 TOTAL 38.79     TOTAL DEDUCTION 77.52 P2 1.50 0.15     7.27 P3 NET BUILT UP AREA OF FLR. 118.51     ( 196.03 - 77.52 = 118.51 ) SQ.MTS 1.23 STAIRCASE AREA CALCULATION    (9TH TO 13TH FLOOR) L3 2.14     2.29 (1ST FLOOR) 37.87 X 1 = 37.87 SQ.MT. TYPICAL FLOOR    37.70 X 7 = 263.90 SQ.MT. (2ND TO 8TH)   (9TH FLOOR) 38.79 X 1 = 38.79 SQ.MT.    TOTAL AREA = 340.56 SQ.MT.   TOTAL AREA/ FL. OF WING B = 155.06 SQ.m             3.50     ( 14TH FLOOR)     WING D - BUILT-UP AREA CALC.FOR  11.72 9TH FLOOR    4.30 2.14 1.07 4.21    NOS. LENGTH X WIDTH IN SQMTS f 5.00  2   2.16 3 ADDITION 1 TOTAL AREA/ FL. OF WING B = 162.48 SQ.m 0.23 A 11.72 X 11.24 131.73   3.39 1.91 S1 4.07 4.30 a DEDUCTION   L1 STAIRCASE AND LIFT/LOBBY AREA CLAIM 1.23 L2 1.23 1 4.30 X 3.39 14.58 0.23 2 2.14 X 2.16 4.62  WING A & C L3 0.91 1.99 3 1.07 X 4.07 4.36    P2 4 1.23 X 5.29 6.51 1.50   P1 P3 0.15 5 2.21 X 0.55 1.22 11.24 4.70 7.27 6 1.20 X 3.15 3.78 FITNESS CENTER AT 1ST FLOOR    1.23     L4 TOTAL 35.07 F 3.50 X 5.00 17.50   2.14 b ST.CASE & LIFT DEDUCTION TOTAL 17.50       WING B 2.29 S1 4.21 X 4.30 18.10     L1 0.23 X 1.23 0.28 4 5.29 FITNESS CENTER     L2 1.91 X 1.23 2.35    L3 1.99 X 0.91 1.81 PERMISSIBLE - 887.91 X 0.20 = 17.75 3.15 L4 2.29 X 2.14 4.90 PROPOSED AREA - 17.50 SQ.MT.    P.(1.53X3.96)+(0.15X1.52)+(1.45X1.67) 0.55 6 P1 7.27 X 1.50 10.91 5 P2 1.07 X 0.23 0.25    1.20 7.08 2.21 1.23 P3 1.23 X 0.15 0.19 TOTAL 38.79     TOTAL DEDUCTION 73.86  NET BUILT UP AREA OF FLR. 57.87    ( 131.73 - 73.86 = 57.87 ) SQ.MTS                                                                         Syed Digitally signed by Syed Ghazali               Ghazali     Nasar  Date: 2021.07.05          Nasar 22:38:13 +05'30'                           VIJAY  Digitally signed by VIJAY      MACHINDRA BADADE DN: c=IN, o=Personal,   PARESH Digitally signed by       MACHIND 2.5.4.20=2339d8d194b291795f9aeb1 1484cd2bbc73eb95f4e8b5b6a3f25be f3d1a6a569, postalCode=400087, PARESH SURYAKANT VINOD Digitally signed by VINOD  st=Maharashtra, KONDIRAM KEKAN    RA serialNumber=9427f6c8bea79fca827 8e538792a7f36931b422d3b4f164be2 SURYAKAN PANCHAL KONDIRAM Date: 2021.08.03 17:46:01 b7005d09f24ca4, cn=VIJAY Date: 2021.08.02       BADADE MACHINDRA BADADE Date: 2021.07.06 19:41:23 +05'30' T PANCHAL 15:44:05 +05'30' KEKAN +05'30'                                                                                             ADMISSIBLE            SIDDHAR          TH S Digitally signed by SIDDHARTH S NADKARNI   Date: 2021.07.05 19:49:36      NADKAR +05'30' NI   LIVING ROOM PASS 3RD FLOOR 3.10 LIVING ROOM PASS 2ND FLOOR   2.90 FITNESS CENTER LIFT WELL PASS 1ST FLOOR    SLOPE 1:5 6.95  CANOPY 1.50 4.05  ENTRANCE LOBBY  GR. FLOOR GR. LVL.   PART SECTION 'B'B  ( WING -D - Proposed) OVER HEAD TANK 3.20   LIFT M/C ROOM 2.40 1.50 TERRACE FLOOR BED LIVING 3.10 KITCHEN 1.50 1.50 R.C.C WALL TERRACE 9TH FLOOR LOBBY TERRACE  3.10 0.45 3.10 0.75  BED LIVING KITCHEN BED PASS TOILET LIVING ROOM 0.60  LIFT M/C ROOM  8TH FLOOR LOBBY 8TH FLR. 0.15     0.60  3.10 3.10  0.45 3.10 BED LIVING KITCHEN BED PASS TOILET 0.75   0.60 TERRACE FLOOR  TERRACE  TERRACE 3.10 LIVING ROOM     7TH FLOOR 0.60 LOBBY 7TH FLR. 0.15  0.60   3.10 0.45 3.10 BED LIVING KITCHEN BED PASS TOILET 0.75 LIVING ROOM 0.60 7TH FLOOR KIT PASS BATH KIT  6TH FLOOR LOBBY 6TH FLR. 0.60 0.15    0.60 3.10 3.10 0.45 3.10 BED LIVING KITCHEN BED PASS TOILET 0.75 6TH FLOOR KIT PASS BATH KIT 3.10 LIVING ROOM 0.60     CHAJJA 5TH FLOOR 0.60 LOBBY 5TH FLR. 0.15    0.60 31.90 31.90 BED LIVING 3.10 KITCHEN BED PASS TOILET 3.10 0.75 28.80 28.80 5TH FLOOR 0.60 KIT PASS BATH KIT  LIVING ROOM 0.45   4TH FLOOR LOBBY 4TH FLR. 0.15    0.60 3.10 3.10 0.45 3.10 0.75  4TH FLOOR KIT PASS BATH KIT PASS BED LIVING KITCHEN BED PASS TOILET  3.10 0.60 LIVING ROOM   CHAJJA  0.60 LOBBY 3RD FLR. 3RD FLOOR 0.15   0.60 3RD FLOOR  KIT PASS BATH KIT PASS BED LIVING 3.10 KITCHEN BED PASS TOILET 3.10 0.75   LIVING ROOM 0.60   0.45  LOBBY 2ND FLR.  2ND FLOOR 0.15  2ND FLOOR  Syed Digitally signed 2.90 2.90 KIT PASS BATH KIT PASS by Syed Ghazali  FITNESS CENTER LIFT  Ghazali Nasar CHAJJA  Date: 2021.07.05  Nasar  1ST FLOOR 1ST FLR.  22:38:48 +05'30' LOBBY 6.95 Digitally signed by VIJAY Cross beam at 3.0 m. ht. VIJAY MACHINDRA BADADE DN: c=IN, o=Personal, Digitally signed 2.5.4.20=2339d8d194b291795f PARESH by PARESH 1 ST FLOOR KIT PASS BATH KIT MACHIN 9aeb11484cd2bbc73eb95f4e8b 5b6a3f25bef3d1a6a569, SURYAKANT postalCode=400087, st=Maharashtra, SURYAKAN PANCHAL Digitally signed by VINOD VINOD KONDIRAM KONDIRAM KEKAN DRA serialNumber=9427f6c8bea79fc 4.05 4.05 T PANCHAL Date: 2021.08.02 a8278e538792a7f36931b422d3 b4f164be2b7005d09f24ca4, KEKAN Date: 2021.08.03 17:46:12 ENTRANCE LOBBY STILT STILT BADADE cn=VIJAY MACHINDRA BADADE Date: 2021.07.06 19:42:06 +05'30' 15:44:22 +05'30' +05'30'  0.15    LOBBY GR. FLOOR     GR. LVL. G.LEVEL GR. LVL. GR. LVL.        WING 'D' (PROPOSED) SIDDHAR Digitally signed by SIDDHARTH TH S S NADKARNI Date: SECTION Z - Z SECTION AT A-A NADKAR 2021.07.05  ( WING -D - Proposed) SCALE = 1:100 NI 19:54:25 +05'30'   WING-C (1ST TO 7TH)  WING - C     O.H. WATER TANK    O.15 THK. & 1.15 MT. HT   O.15 THK. & 1.15 MT. HT 1.20 M. W. 1.20 M. W. PARAPET WALL PARAPET WALL 1.20 M. W. CHAJJA LIFT 1.20 M. W. CHAJJA CHAJJA 1.98 x 1.83 CHAJJA LOBBY 3.96 x 1.53 1.53x1.10 2.13 x 1.22 2.13 x 1.22 1.53x1.10 LIFT 1.34 x 1.22 1.34 x 1.22 DN TERRACE ABOVE 1.98 x 1.83 7th FLOOR TOIL TOIL COUNTED IN FSI KIT / DIN BED BED KIT / DIN 1.37x1.67 3.13 x 5.05 2.44 x 2.59 2.44 x 2.59 3.13 x 5.05  1.98 x 1.37  0.99x 0.99x   WING-A 2.15 x 0.38 2.15 x 0.38 (1ST TO 4TH) LIFT M/C 0.91 0.91  ROOM    3   4    DN UP 1.50 x 1.09 O.15 THK. & 1.15 MT. HT 0.75 M. W. CHAJJA 0.91 M.CANTILEVER W.C. PARAPET WALL TOILET TOILET 2.29 x 1.20 1.06x 1.06x 2.29X1.20 2.29X1.20 TOIL 1.35 1.35 LIV LIV  KIT 3.66 x 5.34  3.66 x 5.34  3.66 x 3.51 1.85x1.09 1.50 x 1.06 REFUGE FLOOR BED    BED  3.51 x 3.66  3.81 x 7.08 3.51 x 3.66  1.07 M.CANTILEVER 1.07 M.CANTILEVER 0.75 M. W. CHAJJA  1.07 M.CANTILEVER 0.91 M.CANTILEVER 0.75 M. W. CHAJJA 0.75 M. W. CHAJJA 0.91 M.CANTILEVER 0.75 M. W. CHAJJA LIV WING-A  5.34 x 3.66  0.75 M. W. CHAJJA ARCHITECTURAL PROJECTION 0.75 M. W. CHAJJA  WING - B 5TH TO 7TH FLOOR PLAN       3   1.98 x 1.37   0.75 M. W. CHAJJA   LIFT LIFT  WING - B DN 1.83 x 1.98 1.83 x 1.98         UP 1.37x1.67 LOBBY COUNTED IN FSI 3.96 x 1.53      ARCHITECTURAL PROJECTION WING-B (1ST TO 4TH) 4 0.75 M. W. CHAJJA 1.07 M.CANTILEVER 1.20 M. W. 2.13 x 1.22 BED   BALC. BALC.   CHAJJA LIFT 1.20 M. W. CHAJJA 2.13 x 1.52 2.13 x 1.52 1.20 M. W. CHAJJA  LIV 2.59 x 2.44 1.98 x 1.83 5.34 x 3.66 LOBBY 3.96 x 1.53 1.53x1.10 2.13 x 1.22 2.13 x 1.22 1.53x1.10 1.52x1.10 0.91x TOIL LIFT 1.34 x 1.22 0.99 1.34 x 1.22 1.67 x 1.22  1.98 x 1.83 2.15 x 0.38  TOIL TOIL 0.75 M. W. CHAJJA COUNTED IN FSI 1.35 x 1.06 0.91 M.CANTILEVER KIT / DIN BED BED KIT / DIN 1.20 M. W. CHAJJA 3.13 x 5.05 2.44 x 2.59 2.44 x 2.59 3.13 x 5.05  1.98 x 1.37 0.91x   0.99x   BED TOILET 0.99 2.15 x 0.38 KIT / DIN 2.15 x 0.38 0.91 3.66 x 3.51 5.05 x 3.13 2.29X1.20 3   4    DN UP O.15 THK. & 1.15 MT. HT TOILET TOILET    1.06x 1.06x  PARAPET WALL  2.29X1.20 1.35 1.35 2.29X1.20 Z Z LIV LIV LIFT M/C 3.66 x 5.34  3.66 x 5.34  ROOM BED    BED DN 3.51 x 3.66 TERRACE ABOVE  3.51 x 3.66 7th FLOOR 1.07 M.CANTILEVER 1.07 M.CANTILEVER TERRACE ABOVE WING`B' O.H. WATER 7th FLOOR 0.91 M.CANTILEVER 0.75 M. W. CHAJJA 0.75 M. W. CHAJJA 0.91 M.CANTILEVER (5TH TO 7TH FLOOR) 0.75 M. W. CHAJJA TANK   ARCHITECTURAL PROJECTION 0.75 M. W. CHAJJA 0.75 M. W. CHAJJA WING - B      O.15 THK. & 1.15 MT. HT O.15 THK. & 1.15 MT. HT PARAPET WALL PARAPET WALL  WING`B' ( 8TH FLOOR)   WING - A      TOTAL AREA/ FL. OF WING B = 120.80 SQ.m     Existing (WING-B) 0.15 THK. & 1.15 MT. HT 0.15 THK. & 1.15 MT. HT   PARAPET WALL PARAPET WALL  L/F M/C   ROOM          Syed Digitally signed    by Syed Ghazali   Ghazali Nasar  Date: 2021.07.05     Nasar 22:40:04 +05'30'   DN UP    Digitally signed by VIJAY MACHINDRA BADADE Digitally signed VIJAY DN: c=IN, o=Personal, 2.5.4.20=2339d8d194b291795f9aeb1 PARESH by PARESH   MACHINDR 1484cd2bbc73eb95f4e8b5b6a3f25bef 3d1a6a569, postalCode=400087, SURYAKANT VINOD Digitally signed by VINOD O.H.TANK st=Maharashtra, serialNumber=9427f6c8bea79fca8278 e538792a7f36931b422d3b4f164be2b SURYAKAN PANCHAL KONDIRAM KONDIRAM KEKAN A BADADE 7005d09f24ca4, cn=VIJAY MACHINDRA BADADE T PANCHAL Date: 2021.08.02 Date: 2021.08.03 17:46:23   Date: 2021.07.06 19:42:33 +05'30' 15:44:40 +05'30' KEKAN +05'30'                  WING - B   0.15 THK. & 1.15 MT. HT 0.15 THK. & 1.15 MT. HT PARAPET WALL PARAPET WALL SIDDHAR Digitally signed    TH S by SIDDHARTH S NADKARNI     NADKAR Date: 2021.07.05   19:54:48 +05'30' NI    1      R.C.C. OVER ADDITIONS TANK 1) 3.67 x 1.69 = 6.20 2) 3.96 x 7.23 = 28.63 3) 1.37 x 1.93 = 2.64  2  TERRACE TERRACE     14TH FLOOR    R.C.C. KIT / DIN LIVING STAIR LOBBY LIVING KIT / DIN  JALLI   3  13TH FLOOR  R.C.C. JALLI KIT / DIN LIVING STAIR LOBBY LIVING KIT / DIN  12TH FLOOR  KIT / DIN LIVING STAIR LOBBY LIVING KIT / DIN TOILET DUCT TOILET DUCT 11TH FLOOR  KIT / DIN LIVING STAIR LOBBY LIVING KIT / DIN 10TH FLOOR WING `B'  KIT / DIN LIVING STAIR LOBBY LIVING KIT / DIN  LIFT M/C ROOM 9TH FLOOR   KIT / DIN LIVING LOBBY KIT / DIN    LIVING TERRACE FLOOR TERRACE TERRACE   8TH FLOOR     TERRACE W.C PASS LIVING LOBBY LIVING KIT / DIN TERRACE  CHAJJA CHAJJA 7TH FLOOR KIT PASS BATH KIT    WING `C' 7TH FLOOR WING `A'      BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET KITCHEN BED  6TH FLOOR CHAJJA CHAJJA KIT PASS BATH KIT    CHAJJA  6TH FLOOR    BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET KITCHEN BED  5TH FLOOR CHAJJA CHAJJA KIT PASS BATH KIT   5TH FLOOR       CHAJJA  BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET KITCHEN BED  CHAJJA  4TH FLOOR KIT PASS BATH KIT PASS       CHAJJA  4TH FLOOR     BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET KITCHEN BED  3RD FLOOR   CHAJJA CHAJJA KIT PASS BATH KIT PASS        3RD FLOOR     BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET KITCHEN BED  2ND FLOOR  Syed Digitally signed CHAJJA CHAJJA KIT PASS BATH KIT PASS by Syed Ghazali   Ghazali Nasar  CHAJJA  Date: 2021.07.05   Nasar 2ND FLOOR   22:41:57 +05'30'  VIJAY Digitally signed by VIJAY MACHINDRA BADADE Digitally signed  KITCHEN BED  DN: c=IN, o=Personal, BED KITCHEN TOILET PASS LIVING LOBBY LIVING PASS TOILET PARESH by PARESH CHAJJA CHAJJA 1 ST FLOOR KIT PASS BATH KIT MACHIND 2.5.4.20=2339d8d194b291795f9aeb11 484cd2bbc73eb95f4e8b5b6a3f25bef3 d1a6a569, postalCode=400087, SURYAKANT Digitally signed by VINOD RA st=Maharashtra, serialNumber=9427f6c8bea79fca8278 e538792a7f36931b422d3b4f164be2b SURYAKAN PANCHAL VINOD KONDIRAM KONDIRAM KEKAN 7005d09f24ca4, cn=VIJAY KEKAN Date: 2021.08.03 17:46:33  BADADE MACHINDRA BADADE T PANCHAL Date: 2021.08.02  +05'30' Date: 2021.07.06 19:43:02 +05'30' 15:44:55 +05'30' 1ST FLOOR      PASS LIVING PASS TOILET BED     BED KITCHEN TOILET LIVING LOBBY KITCHEN G.LEVEL       STILT STILT   STILT STILT SIDDHAR Digitally signed by SIDDHARTH G.LEVEL   TH S S NADKARNI Date: SECTION AT Y-Y SECTION Z - Z NADKAR 2021.07.05  ( WING -C,B & A ) SCALE = 1:100 NI 19:55:41 +05'30' ADDITION AT 5TH TO 7TH    SUMMARY FLOOR (WING-A+WING-C) x FL. = TOTAL B                      0.91 0.91                       WING - C WING - A 6.32        1 1 BALCONY AREA STATEMENT        WING C 1st to 7th          ADD.TO 14TH FLOOR        1.07 1.07   W 4.58 1.51 1.51 4.58 W        1.60 1.60 A  L 3.73 3.73 L       2.60 2.60 L1 P ST 3.28 3.96 3.96 3.28 ST  2 2   3 4 BALC. BALC. 4 3 W   W 0.91 1.98 2.44 x 1.52 L1 P 2.44 x 1.52 1.98 0.91    3.96 Y Y         A 3.28x0.46 3.28x0.46   COUNT FROM 1 2.13 1.53 5th TO 12th 1     6.32       P COUNT FROM 1ST TO 14TH  B WING A 1st to 4th      WING - B    B3     X X DEDUCTION FROM WING 'B'   0.15x5.35      5 0.76 ST2 0.76 5    0.91  0.91                            0.91 0.46 0.91 B3 B1 ST3 B3        3.81 3.81       LINE AREA DIA. (TYPICAL AREA DIA.) WING A 5th to 7th      WING`B' SCALE 1:100                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Syed Digitally signed         by Syed Ghazali                    Ghazali Nasar        Date: 2021.07.05          Nasar 22:43:16 +05'30'                         VIJAY Digitally signed by VIJAY MACHINDRA BADADE Digitally signed by       DN: c=IN, o=Personal, PARESH PARESH       2.5.4.20=2339d8d194b291795f9a          MACHIN eb11484cd2bbc73eb95f4e8b5b6a SURYAKANT VINOD Digitally signed by VINOD       3f25bef3d1a6a569, postalCode=400087, SURYAKAN PANCHAL       DRA KONDIRAM KEKAN st=Maharashtra,            serialNumber=9427f6c8bea79fca8 278e538792a7f36931b422d3b4f1 64be2b7005d09f24ca4, cn=VIJAY T PANCHAL 15:45:11 Date: 2021.08.02 KONDIRAM Date: 2021.08.03 17:46:45           BADADE MACHINDRA BADADE +05'30' KEKAN +05'30'       Date: 2021.07.29 16:49:11 +05'30'                                                                                                                                  SIDDHART Digitally signed            by SIDDHARTH      HS S NADKARNI     Date:        NADKARN 2021.07.05    I 19:56:04 +05'30'