ARCHITECT'S CERTIFICATE FOR RERA – FORM 1 Parijat Hill View – RERA P51800021747 Date : 31.12.2022 To The Director, Parijat Hill View Realty LLP 72 -76, Industrial Estate, Mundhva, Pune Subject: Certificate of Percentage of Completion of Construction Work of 1 No. of Buildings /2 Wing(s) of the Project situated on the Plot bearing C.N. No/CTS No. 259 (pt) /, 260 (pt) Survey no. 34 A Chawl No 48 to 53 demarcated by its boundaries (latitude 19.222941027499523, longitude 72.86876037537411 of the end points) having East Side Boundary of Plot occupied by Residential Chawl. South Side Boundary Plot occupied Internal Road and Residential project. West Side Boundary Plot occupied by Internal Road and RG Society, MHADA. North Side –D P Road. Division Borivali village Magathane taluka Borivali District Mumbai PIN 400066 admeasuring 2727.82 sq. mts. area being developed by M/s Parijat Hill View Realty LLP Dear Sir, I/ We Arch. Hemant Kankaraiya have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Building /Wing Number to be prepared separately for each Building /Wing of the Project named Parijat Hill View. Table A Sr. No Task Activity % Of Work Done 1 Excavation 100% 2 1 number of Basement(s) and Plinth 100% 3 Zero number of Podiums NA 4 Stilt Floor 100% 5 22 number of Slabs of Super Structure 100% 6 Internal walls, Internal Plaster, 100% Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 100% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each 100% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 100% elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings 100% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Sr. Common areas and Facilities, Proposed Percentage of Details No Amenities (Yes/No) Work done 1 Internal Roads & Foot paths Yes 100 2 Water Supply Yes 100 MCGM and Bore Well (if approved) 3 Sewerage (chamber, lines, Yes 100 Common Sewerage Septic Tank , STP) as per approval of MCGM 4 Storm Water Drains Yes 100 As per Norms 5 Landscaping & Tree Planting Yes 100 As per Norms 6 Street Lighting Yes 100 As per Norms 7 Community Buildings No 100 As per Norms 8 Treatment and disposal of Yes 100 As per Norms sewage and sullage water 9 Solid Waste management & No 100 No Disposal 10 Water conservation, Rain Yes 100 As per Norms water harvesting 11 Energy management Yes 100 As per Norms 12 Fire protection and fire safety Yes 100 As per Norms requirements 13 Electrical meter room, sub- Yes 100 As per Norms station, receiving station 14 Others (Option to Add more) NA 100 NA Yours Faithfully For Deeksha City Scape L.S/ Architect (License NO CA / 99 / 25011)