Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 30th September 2025) To, NEELESHWAR DEVELOPERS, H 602, KRISHNAVASANT, KANDIVALI EAST, SAGAR COMPLEX VILLAGE, Borivali, Mumbai Suburban, MAHARASHTRA, 400101 Subject: Certificate of Percentage of Completion of Construction work as on 30th September 2025 of SATELLITE HEIGHTS having MahaRERA Registration Number: P51800021643 being developed by NEELESHWAR DEVELOPERS Sir, I/We have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction work of SATELLITE HEIGHTS having the building having MahaRERA Registration Number: P51800021643 being developed by NEELESHWAR DEVELOPERS Based on Site Inspection, with respect to Layout/each of the Building /Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA is as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number Sr.No Task/Activity Percentage of Work Done (As of date 30th September 2025) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 100% 4. Number of Podium NA 5. Stilt Floor 100% 6. Slabs of Super Structure 85% Internal walls, Internal Plaster Floorings, Doors and Windows 7. 65% within Flat/Premises 8. Sanitary Fittings within the Flat/Premises. 60% Staircases, Lifts Wells and Lobbies at each Floor level Overhead 9. 38% and Underground Water tanks. The external plumbing and external plaster, elevation, 10. 42% completion of terraces with waterproofing of the Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, 11. finishing to entrance lobby/s, plinth protection, paving of areas 42% appurtenant to Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) for (Project Name) Percentage of Work Done Sr. Common areas and Facilities, Proposed (As on 30th Details No Amenities (Yes/No) September 2025 of the Certified) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths YES 45% Work in Progress Water Conservation, Rain 2. NO 0% NA water Harvesting 3. Energy management NO 0% NA Fire Protection and Fire Safety 4. Yes 40% Work in Progress Requirements Electrical Meter Room, 5. Yes 40% Work in Progress Sub-Station, Receiving Station Aggregate area of recreational 6. YES 0% Work in Progress Open Space 7. Open Parking YES 0% Work in Progress 8. Water Supply Yes 35% Work in Progress Sewerage (Chamber, Lines, 9. Yes 40% Work in Progress Septic Tank, STP) 10. Landscaping & Tree Planting Yes 40% Work in Progress 11. Street Lighting YES 35% Work in Progress 12. Community Buildings No 0% NA Treatment And Disposal of 13. No 0% NA Sewage and Sullage Water Solid Waste Management and 14. No 0% NA Disposal