detailed ofaforesaidBased under Percentage Siteonbeing certifying Surveyor HEIGHTSt Krishnavasant, Complex Village, Sagar Developers, Neeleshwar Kandivali Subject: Sir,31/03/2024 he IofWe P51800021643 602, H To, the MahaRERA developed Ar. Parnavi BangarAr. PB work in Real Parnavi Certificate East, ASSOCIATES Table executed Work of of Inspection, building Estate by being SATELLITE Borivali B. is Neeleshwar Bangar done as Percentage of developed of with Project, MahaRERA having Percentage 400101 - ARCHITECT'S CERTIFICATE registered for with respect each have HEIGHTS respectI Developers. by 31/03/2024)(Ason Regulation (See 3) certify as of undertaken Neeleshwar Annexure A to the Completionof of FORM 1 each per that to having building Layout/each Completion Table of P51800021643 as Registration Number: the on assignment Developers. MahaRERA A wing / Construction activity herein the of of date of the Construction below. of the as of Registration the RealBuildingthis Architects/Licensed work parnavibassociates@gmail.com certificate, entire TheEstate of percentage Wing work Shreerang Society Thane SATELLITE phase Project of Number: as the the +91 is on 7738750063 e +91 7738750063 parnavibassociates@gmail.coms Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Table A Building Number 01 Sr.No Task/Activity Percentage of Work Done (31/03/2024) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 100% 4. Number of Podium NA 5. Stilt Floor 100% 6. Slabs of Super Structure 60% 7. Internal walls, Internal Plaster Floorings, Doors and WindowS within Flat/Premises 50% 8. Sanitary Fittings within the Flat/Premises. 50% 9. Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water tanks. 50% The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 40% BuildingWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NO, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 40% Building/Wing, Compound Wall protection and allother requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 i: parnavibassocia tes:sgmail.com I Shreerang Society Thane � PB ASSOCIATES •• Ar. Pamavi Bangor TABLE-B Common Area Internal and External Develo ment Works for SATELLITE HEIGHTS Percentage of Sr. Common areas and Proposed Detail Work Done No Facilities, Amenities (Yes/No) s (31/03/2024) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths Yes 40% Work in Process 2. Water Supply Yes 35% Work in Process Sewerage (chamber, lines, Yes 40% 3. Work in Process Seotic Tank, STP) 4. Storm Water Drains Yes 35% Work in Process 5. Landscaoina & Tree PlantinQ Yes 40% Work in Process 6. Street Liahtina Yes 35% Work in Process 7. Community Buildings No - - Treatment and disposal of - - 8. No sewaae and sullaqe water. Solid Waste Management & - - 9. No Disposal Water Conversation & Rain No - - 10. Water Harvesting 11. Energy Management No - - Fire Protection and fire Yes 35% Work in Process 12. safetv requirements Electrical metre room, 13. sub-station, receiving Yes 40% Work in Process station. 14. Others (options to add more) No - - Yours Faithfully, Agreed and accepted by: Signature of Promoter AR. PARNAVl BANGAR Neeleshwar Developers (License No-CA/2023/155164) Date: