+91 7738750063 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 31/12/2023) To, Neeleshwar Developers, H 602, Krishnavasant, Sagar Complex Village, KandivaliEast, Borivali -400101 Subject: Certificate of Percentage of Completion of Construction work as on 31/12/2023 of SATELLITE HEIGHTS having MahaRERA Registration Number: P51800021643 being developed by Neeleshwar Developers. Sir, IWe Ar. Parnavi Bangar have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction work of SATELLITE HEIGHTS the building having MahaRERA Registration Number: P51800021643 being developed by Neeleshwar Developers. Based on Site Inspection, with respect to Layoutleach of the Building Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA is as registered as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. +91 77'J87:nJ63 • parnavibassociafes@gmail.com I Shreerang Society Thane � PB ASSOCIATES Ar. Pamavi Bangor Table A s ·u1ld1nq Number 01 Sr.No Task/Activity Percentage of Work Done (31/12/2023) (1 ) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 100% 4. Number of Podium NA 5. Stilt Floor 100% 6. Slabs of Suoer Structure 60% Internal walls, Internal Plaster Floorings, Doors and 7. 50% Windows within Flat/Premises 8. Sanitary Fittings within the Flat/Premises. 50% Staircases, Lifts Wells and Lobbies at each Floor level 50% 9. Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 40% Buildina/Wina. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 40% Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 77'38750063 " parnavibassociales@gmail.com II Shreerang Society Thane � PB ASSOCIATES Ar. Parnavi Bangor TABLE-B Common Area (Internal and External Development Works) for SATELLITE HEIGHTS Percentage of Sr. Common areas and Proposed Detail Work Done No Facilities, Amenities (Yes/No) s (31/12/2023) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths Yes 40% Work In Process 2. Water Suooly Yes 35% Work In Process 3. Sewerage (chamber, lines, Yes Work In Process 40% Septic Tank, STP) 4. Storm Water Drains Yes 35% Work In Process 5. Landscapinq & Tree Plantin� Yes 40% Work In Process 6. Street Liqhtina Yes 35% Work In Process 7. Community Buildings No - - 8. Treatment and disposal of No - - sewaqe and sullaae water. Solid Waste Management & - 9. No - Disposal Water Conversation & Rain No - - 10. Water Harvestinq 11. Energy Management No - - Fire Protection and fire Yes 35% Work In Process 12. safety reouirements Electrical metre room, 13. sub-station, receiving Yes 40% Work In Process station. 14. Others (options to add more) No - - Yours Faithfully, Agreed and accepted by: Signature of Promoter AR. PARNAVI BANGAR Neeleshwar Developers (License No-CA/2023/155164) Date: