Annexure - B FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawa l of money from Designated Account- Project wise) (As on 30th June 2024) Date: 30th JUNE 2024 To, The, M/s. Skyblu developer's 802, Skyline Epitome, Kirol Marg. Near Jolly Gymkhana, Vidyavihar West, Mumbai 400086 Subject: Certificate of Cost Incurred for Development of 72 Corp having MahaRERA Registration Number P51800021663 (Only Applicable after project Registration) being developed by Skyblu developer. Sir, II We Raghavendra Singh have undertaken assignment of certifying Estimated Cost for 72 Corp having MahaRERA Registration Number PS1800021663 (Only Applicable after project Registration being developed by M/s Skyblu developer. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by 1395.56 Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 49,69,88, 702.00/-( Total of Table A and B) at the of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completio n of the apartments and proportio nate completio n of internal & external works, as p~r specification mentione d in agreemen t of sale and for the purpose of obtaining occupatio n certificate /completi on certificate for the Building (s)/ ng the Planning Authority ), Lay out / Plotted De vel opment from the MC GM bei Wing(s lemented. aforesaid project is being imp under whose jurisdiction the at Rs. 365 ,10 0,9 87. 00 4. The Estimated Cost Inc urred till date is calculated Incurred is calculated on the of Tab le A and B). The amount of Estimated Cost (Total items. es used and un it cost these basis of inp ut materials/servic com ple tio n of Co mp leti on of the Civil, MEP and Allied works for 5. The Balance Cost rnal & external works, as per ap art me nts an d pro po rtio na te completion of inte ima te at Rs. Rs. of the t is est ion s me ntio ne d in ag ree ment of sale, of the projec specificat Table A and B}. 49 ,69 ,88 ,70 2.0 0/ (Total of for the ap art me nts an d Co st of the Civil, MEP and allied wo rk 6. I cer tify tha t the ed in ag ree me nt of ern al & ext ern al, as per specifications me nti on pro po rtio na te int is as giv en in Pro jec t as com ple ted on the date of thi s certificate sale, of the aforesaid Table A an d B below: Table A led Skyblu Plotted De vel op me nt bearing Nu mb er 4/2 or cal Bu ild ing / Wi ng / La yo ut/ developer. ve lop me nt of tel y for each Bu ildi ng / Wi ng / La yo ut/ Plo tte d De (to be pre pa red separa the Real Estate Project) Am ou nts (In Rs.) Pa rticulars Sr No . Plo tte d 49,69,88,702.00 Bu ild ing / Wi ng / La yo ut/ 1. To tal Estimated co st of the of Re gis tra tio n is De ve lop me nt as on da te 365,100,987.00 cat e 2. Co st inc urr ed as on da te of cer tifi 73.4% 3. Wo rk do ne in Pe rce nta ge tim ate d cos t) (As Pe rce nta ge of the es 13,18,87,715.00 ed ** 4. Ba lan ce Co st to be Inc urr st) (Based on Es tim ate d Co 00.00 al/ Ex tra Ite ms no t inc lud ed in the 5. Co st Inc urr ed on Ad dit ion Es tim ate ~ Co st (Table- C) TABLE B Internal & External Development Works in Respect of the Reqistered Phase Sr. No Particulars Amounts 1. Total Es.ti mated Cost of the Internal and External 1,72,45,000.00 Development Works including amenities and Facilities in the layout as on date of Registration is 2. Cost incurred as on date of certificate 00.00 3. Work done in Percentage (as Percentage of the estimated 00.00 cost). 4. Balance Cost to be Incurred** (Based on Estimated Cost). 1,72,45,000.00 5. Cost Incurred on Additional/Extra Items not included in the 00.00 Estimated Cost (Table- C) Yours Faithfully, RAGH 4L ;