Ann xur .. B · FORM-2 [see Regulation 3] ENGINEER'S CERTIFICATE h tim of Registration of Ongoing Project and for withdrawal (T b ubmi t d fm n y from Designated Account- Project wise) (As on 31/12/2023) T, Th, Ml . kyblu d vlop r's o , kylin Epitome,Kirol Marg. N r J lly Gymkhana, Vidyvihar West, Mumb i 400086 g MahaR�RA Subj ct: Certificate of Cost Incurred for Development of 72 Co:p havin Registration Number PS 1800021663 (Only Applicable after proJect Registration) beirg developed br Skyblu developer. Sir, If We Raghavendra Singh have undertaken 'assignment of certifying Estimated Cost for 72 Corp having MahaRERA Registration Number P51800021663 .(Only Applicable after project Registration being ' . developed by M/s Skyblu developer. ' 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & _external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/Consultants. The Schedule of items and quantity required for the entire work as calculated by 1395.56 Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference as �s. 49,69,88,702.00/-(Tota,I of Table A and B) at the of Registration. The estimated Tota/ Cost of project is with r�ference to the Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external works, as per specification mentioned i� agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the Building (s)/