admin@daisaria.co A DAISARIA AS S OCIAT ES 801, Skyline Epitome Near Jolly Gymkhana, 022 6111 0504 0226111 0531 TE TURE URBAN DESIGN I PROJECT MANACEMENTI INTERIORS Kirol Road, Vidyavihar West, www.daisaria.com n s9001.2015 certtie-d company Mumbai- 400086. FORM1 ARCHITECT'S CERTIFICATE Ref.No:849/2018/474 September 07,2020 M/s.Skyblu Developers 802, Skyline Epitome, Kirol Road, Near Jolly Gymkhana, Vidyavihar West, Mumbai-400 086. Subject:Certificate of Percentage of Completion of Construction Work of 72 Corp' Building situated on the plot bearing CTS No. 4/2 demarcated by its boundaries (latitude and longitude of the end points) 19°06'16.6852" and 72°53'14.0245" to the South-West, 1906'15.8417" and 72°53'15.5976" to the South-East, 19°06'16.8911" and 72°53'15.7827" to the North-East and 19°06'17.5345" and 72°53'14.5837" to the North-West of village Mohili at Saki-Vihar Road, Sakinaka, Kurla(W) in L-Ward, PIN 400 072 admeasuring 1395.966 sq.mts. area being developed by M/S.SKYBLU DEVELOPERS. Sir, In continuation of our certificate dated 29.05.2019 certifying Percentage of Completion of Construction work of the *72 Corp" Building, situated on plot bearing CTS No. 4/2 of village Mohili at Saki-Vihar Road, Sakinaka, Kurla(W) in L-Ward., admeasuring 1395.96 sq.mts. area developed by M/s.Skyblu Developers, we further certify as under Owner/Promoter:- Following technical professionals are appointed by M/s/.: Daisaria Associates as Architect (i) M/s/.: S.V.Patel & Associates as Structural Consultant (ii) M/s/.: Urja Consultants as MEP Consultants (iii) (iv) Shri.: Shri.Jignesh Solgama as Site Supervisor Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I the building of the certify that as on the date of this certificate, the Percentage of work done for Real Estate Project Phoenix is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. DAISARIA ASS OCIAT ES 801, Skyline Epitome, Near Jolly Gymkhana, admin@daisaria.co 022 6111 0504 022 6111 0531 Kirol Road Vidyavihar West TECTURE 'URBAN DESIGNI PROJECT MANAGEMENTI INTERIORS www.daisaria.com Mumbai - 400086. in IS0 9001:2015 cerlified company Table A Building Sr. Tasks/Activity Percentage No. of work done Excavation 100% 8% 2 Number of Basement &Plinth 2 numberof Podiums 0% 4 Stilt Floor 0% 14number of Slabsof Super Structure. 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, 0% Doors and Windows to each of the Flat/Premises. 0% 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level connecting 0% 8 Staircases and Lifts, Overhead and Underground Water Tank. 9 The external plumbing and external plaster, elevation, completion 0% of terraces with waterproofing oftheBuilding. Installation of lifts, water pumps, Fire Fighting Fittings and 0% 10 Common Equipment per CFO NOC, Electrical fittings to as mechanical equipment, Complianceto conditions of Areas, electro, environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate. TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Work done InternalRoads&Foothpaths NO N.A. YES 0% Yet tostart 2 Water Supply 3 Sewerage (chamber, lines, Septic YES 0% Only Tank, STP) Chamber lines. Yet tostart 4 Storm Water Drains YES 0% Yet tostart 5 Landscaping & Tree Planting YES 0% Only Tree planting admin@daisaria.com A DAISARIA A ETRIORAN TE S S O C A TE DTCTMANAGEMENT INTRODS S 801. Skyline Epitome Near Jolly Gymkhana Kirol Road, Vidyavihar West. 0226111 0504 022 6111 0531 www.daisaria.com 90012015t 3opany Mumbai- 400086 S. Common areas and Proposed Percentage of Details No. Facilities, Amenities (Yes/No) Work done planting Street Lighting NO N.A. 7 Community Buildings NO N.A. 8 Treatment and disposal of sewage and NO N.A. sullage water 9 Solid Waste management& Disposal NO N.A. Rain YES 0% Only Rain 10 Water conservation, water harvesting Water harvesting 11 Energy management NO N.A. 12 Fir protection and fire safety YES 0% Yet to start As per CFO requirements NOC 13 Electrical meter room, sub-station, YES 0% Electric receiving station meter room yet to start NA 14 Others (Optionto add more) Note: N.A. stands for NOT APPLICABLE. Thanking you, Yours Faithfully, For DAISARIA ASSOCIATES Mahoj V.Daisaria) CA/82/7254 Ajb/3