BUILT UP AREA OF GROUND FLOOR PROFORMA - A BUILT UP AREA STATEMENT A B 38.74 0.53 X 19.73 X 1 NO X 0.55 X 1 NO = = 764.34 SQ.MT. 0.29 SQ.MT. STAIRCASE, 1 i) ii) AREA OF PLOT (AS PER P.R.C.) AREA OF PLOT (AS PER CONVEYANCE DEED) 1519.00 1516.50 01/05 C (1.98+2.02) /2 X 0.15 X 1 NO = 0.30 SQ.MT. GROSS AMENITY SOCIETY PUMP SUB DOUBLE HT TOTAL FLOOR LIFT, LOBBY ED & FD FUNGIBLE NET BUA AREA OF PLOT CONSIDERED 1516.50 ST3 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. BUA AREA OFFICE ROOM STATION SHOP ADD BUA AREA a) AREA OF RESERVATION IN PLOT -- TOTAL ADDITION = 765.11 SQ.MT. X -- DEDUCTIONS 1ST BASEMENT - -- -- -- -- -- -- -- -- -- b) AREA OF ROAD SET BACK 120.54 PROFORMA - B 1 0.95 X 1.45 X 1 NO = 1.38 SQ.MT. 2ND BASEMENT - -- -- -- -- -- -- -- -- -- -- c) AREA OF D.P. ROAD -- 2 5.52 X 6.65 X 1 NO = 36.71 SQ.MT. GROUND 696.92 140.39 1.22 - 20.00 23.24 42.90 44.89 514.06 133.27 380.79 2 DEDUCTIONS FOR 0.50 X 13.48 X 3.17 X 1 NO CONTENTS OF SHEET 3 = 21.37 SQ.MT. 1ST 609.21 140.62 1.22 -- -- -- -- -- 467.37 121.17 346.20 (A) FOR RESERVATION / ROAD AREA -- 4 (1.91+2.17)/2 X 1.05 X 1 NO = 2.14 SQ.MT. a) ROAD SET-BACK AREA TO BE HANDED OVER(100%) GROUND FLOOR PLAN,BUA LINE DIAGRAM AND CALCULATION 5 1.05 X 4.85 X 1 NO = 5.09 SQ.MT. 2ND 698.98 139.22 1.22 -- -- -- -- -- 558.54 144.81 413.73 120.54 38.74 BUILT UP AREA STATEMENT AND TENEMENT STATEMENT 5a 1.00 X 1.50 X 1 NO 1.50 SQ.MT. 3RD PARKING FLR -- -- -- -- -- -- -- -- -- -- -- b) PROPOSED D.P. ROAD TO BE HANDED OVER (100%) -- BLOCK PLAN , LOCATION PLAN B TOTAL DEDUCTION = 68.19 SQ.MT. Y1 -- c) i) RESERVATION AREA TO BE HANDED OVER (100%) R.G DIAGRAM CALCULATION & REQUIREMENT 4TH PARKING FLR -- -- -- -- -- -- -- -- -- -- -- 0.95 0.55 GROSS BUILT UP AREA [X - Y1] = 696.92 SQ.MT. X1 4.55 5TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 ii)RESERVATION AREA TO BE HANDED OVER AS PER AR 1 1.45 STAMP OF APPROVAL OF PLANS 0.53 GROUND FLOOR STAIRCASE, LIFT AREA CALCULATION 6TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 ST1 6.35 X 3.65 X 1 NO = 23.18 SQ.MT. (B) FOR AMENITY AREA ST1 3.65 7TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 L1 4.54 X 2.71 X 1 NO = 12.30 SQ.MT. a) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER DCR 8TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 -- L2 2.31 X 2.71 X 1 NO = 6.26 SQ.MT. 14(A) 722.21 THIS CANCELS APPROVALS TO THE PREVIOUS PLANS ST2 3.50 X 6.50 X 1 NO = 22.75 SQ.MT. 9TH 815.55 92.12 1.22 -- -- -- -- -- 187.24 534.97 b) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER DCR 6.35 CL 6.65 2 6.65 -- ST3 0.90 X 0.10 X 2 NOS 0.18 SQ.MT. 10TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 14(B) SANCTIONED UNDER NO.CHE/ES/5513/L/337/NEW CL 7.28 X 6.65 X 1 NO = 48.41 SQ.MT. 11TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 c) AREA OF AMENITY PLOT TO BE HANDED OVER AS PER DCR DATED 04-02-2020 STL1 1.66 X 2.25 X 1 NO = 3.74 SQ.MT. -- STL1 2.25 722.21 35 (ABEYANCE) L1 2.71 STL2 2.03 X 2.25 X 1 NO = 4.57 SQ.MT. 12TH 815.55 92.12 1.22 -- -- -- -- -- 187.24 534.97 7.28 5.52 13TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 (C) DEDUCTION FOR EXISTING BUILT-UP AREA TO BE RETAINED 1.66 LL1 4.81 X 3.60 X 1 NO = 17.32 SQ.MT. - IF ANY 4.54 0.15 C 1.98 LL2 3.00 X 0.56 X 1 NO = 1.68 SQ.MT. 14TH 815.55 92.12 1.22 -- -- -- -- -- 722.21 187.24 534.97 APPROVED SUBJECT TO CONDITIONS MENTIONED IN a) LAND COMPONENT OF EXISTING BUA / EXISTING BUA AS TOTAL STAIRCASE LOBBY AREA = 140.39 SQ.MT. Y2 15TH (PART) 650.99 THIS OFFICE LETTER NO: CHE/ES/5513/L/337/NEW 2.02 744.33 92.12 1.22 -- -- -- -- -- 168.20 482.79 PER REGULATION UNDER WHICH THE DEVELOPMENT WAS -- 2.90 5.79 3.17 AMENITY AREA CALCULATION ( COUNT IN FSI) TOTAL 10904.94 1433.55 17.08 20.00 23.24 42.90 44.89 9413.06 2439.84 6973.22 ALLOWED Bajirao Digitally signed by AM1 2.90 X 6.42 X 1 NO = 18.62 SQ.MT. 3 TOTAL DEDUCTION [{2(A)+2(B)}+2(C)] 120.54 LL1 3.60 AM2 5.79 X 6.73 X 1 NO = 38.97 SQ.MT. 3 4 BALANCE AREA OF PLOT 1395.96 Bajirao Lahu Patil AM3 0.50 X 6.94 X 1.63 X 1 NO = 5.66 SQ.MT. OFFICE / SHOPS TDR UTILISATION TABLE Lahu Patil Date: 5 AM4 5.57 X 1.20 X 1 NO = 6.68 SQ.MT. STATEMENT PLOT AREA UNDER DEVELOPMENT (4) 1395.96 2021.03.31 6 ZONAL (BASIC) FSI 19.73 19.73 11:37:39 +05'30' DH 4.81 6.42 TOTAL AMENITY AREA = 69.93 SQ.MT. Y3 Sr. No. 1.00 0.56 AM1 6.73 6.94 OFFICE NO. D.R.C. FOLIO No. RESERVATION UTILISATION AREA DETAILS OF LAND LL2 A AM2 FLOOR 7 BUILT UP AREA AS PER ZONAL (BASIC) FSI (5X6) 1395.96 SOCIETY OFFICE AREA CALCULATION PER FLOOR CERTIFICATE No. FROM FORM No. IN Sqmtrs SURRENDERED 3.00 8 SO1 4.95 X 4.04 X 1 NO = 20.00 SQ.MT. GROUND 3 BUILT UP EQUAL TO AREA OF LAND HANDED OVER AS PER -- EXECUTIVE ENGINEER BLDG. PROP - II 1 000996 TDR/WS/ES/CITY/WARD/ HOSPITAL 10000.00 C.T.S. No.11A/4 OF VILLAGE CHANDIVALI REGULATION 30(A) SHINDE Digitally signed by SHINDE TOTAL SOCIETY OFFICE AREA = 20.00 SQ.MT. Y4 3 SHOP + 4 RESIDENTIAL 48875 2.71 SACHIN BALAKRISHNA L2 FD AM3 1ST STL2 2.25 OFFICES (i) AS PER 2(A) AND 2(B) EXCEPT 2(A)(c) (ii)ABOVE WITH IN CAP DN: c=IN, o=Personal, 2.5.4.20=7b59065f4fa84deb22428 Yatish SACHIN Digitally signed by Yatish DUCT AREA CALCULATION 2 SRA/1364/CONST. TDR/SRP/CITY/ES/WS/N-27 2900.00 C.T.S. No.195(PT) OF VILLAGE GHATKOPAR OF "ADMISSIBLE TDR" AS COLUMN 6 OF TABLE-12 ON 241.08 46faa1c66969bde5390f6fb05b0ea Shirishchandra Randeria DN: c=IN, o=Personal, 2ND 09 SLUM 48895 CORRESPONDING S.NO. 249(PT) 03bda45f4cd62e, Shirishcha 2.5.4.20=467be74326f300aba080753c a05f41e4bf1e83372f9ea23472545b47 WARD PHASE -IV/CONST./I 13.48 47cd8c81, postalCode=400050, 2.31 2.03 FD 0.45 X 2.71 X 1 NO = 1.22 SQ.MT. REMAINING / BALANCE PLOT (2 X 2 A(a)) [120.54 X 2 ] postalCode=400701, ndra BALAKRIS st=Maharashtra, serialNumber=2d42aad0dac27f094c5 2.90 1.63 3RD 0 st=MAHARASHTRA, 07a3cc1b035ee9669670b59d142df98 0.45 TOTAL DUCT AREA = 1.22 SQ.MT. Y5 serialNumber=a86ecc52f6867d25 c8f6cc611aef0f, cn=Yatish 5.57 1.91 (ii) IN CASE OF 2(A) (c) (ii) PERMISSIBLE OVER AND ABOVE a63b85a857ff60210a6a60137f0aa Randeria Shirishchandra Randeria 1.51 Date: 2021.03.30 16:03:14 +05'30' 1.20 1.05 -- HNA PR 4 4TH 0 3069cb6a4ec5ac04c39, AM4 5a 1.50 2.17 PERMISSIBLE BUA ON REMAING / BALANCE PLOT cn=SHINDE SACHIN BALAKRISHNA Date: 2021.03.30 12:09:08 +05'30' 1.00 3.05 5.42 PUMP ROOM AREA CALCULATION 5TH 12 9 BUILT UP AREA IN LIEU OF COST OF CONSTRUCTION OF 1.11 PR1 6TH 12 BUILT UP AMENITY TO BE HANDED OVER (within the limit of -- S.E. (B.P.) L/W A.E. (B.P.) L & N PR 2.90 X 1.51 X 1 NO = 4.38 SQ.MT. permissible BUA on remaining plot) PR1 3.05 X 1.11 X 1 NO = 3.39 SQ.MT. 7TH 12 PR2 3.83 X 4.04 X 1 NO = 15.47 SQ.MT. 10 BUILT UP AREA DUE TO"ADDITIONAL FSI ON PAYMENT OF ST2 6.50 4.95 3.83 8TH 12 TOTAL PUMP ROOM AREA = 23.24 SQ.MT. Y6 PREMIUM"AS PER TABLE NO 12 OF REGULATION NO 30(A)ON 5.30 697.98 5.15 SB1 5.46 9TH 12 REMAINING/BALANCE PLOT [1395.96X0.50] =697.98 4.85 5 SB SO1 4.04 PR2 SUBSTATION AREA CALCULATION 10TH 12 SB 5.42 X 5.15 X 1 NO = 27.91 SQ.MT. 11TH 12 11 BUILT UP AREA DUE TO ADMISSIBLE "TDR" AS PER TABLE 3.50 1.05 SB1 2.17 X 5.30 X 1 NO = 11.50 SQ.MT. NO 12 OF REGULATION NO 30(A) AND 32 ON REMAINING / SB2 12TH 12 1154.88 ST3 0.10 ST3 SB2 0.50 X 5.46 X 1.28 X 1 NO = 3.49 SQ.MT. BALANCE PLOT [(1395.96X1) -241.08] = 1154.88 0.10 1.28 13TH 12 0.90 0.90 TOTAL SUBSTATION AREA = 42.90 SQ.MT. Y7 14TH 12 8.37 6.50 9.91 12 ADDITIONAL F.S.I. AS PER DCPR- 33(19) 6 3.15 15TH(PART) 10 92 [(1516.50X5) - (1395.96X2.5)] 3485.00 2 7 4 3. 5.10 5.10 DOUBLE HEIGHT SHOP AREA CALCULATION (1.50 TIMES COUNTED IN FSI) 11 4.8 3 84 [7582.50 - 3489.90 = 4092.60] (CLAIMING 3485.00) TOTAL 149 9 .76 5 7. 13 PERMISSIBLE BUA (as the case may be with/ without BUA as per DH 4.55 X 19.73 X 0.50 X 1 NO = 44.89 SQ.MT. 4.9 1 4. AREA LINE DIAGRAM OF GROUND FLOOR 7 89 6974.90 TOTAL AREA = 44.89 SQ.MT. Y8 2(c)) [7+8+10+11+12] SCALE 1:100 REQUIRED AMENITY AREA = 5% OF NET PLOT AREA = 5% OF 1395.96 SQ.MTS. NET BUILT UP AREA OF GROUND FLOOR = 514.06 SQ.MT. 14 PROPOSED BUA (as the case may be with/ without BUA as per = 69.80 SQ.MTS 6973.22 [X1 - (Y2+Y4+Y5+Y6+Y7)+Y8] 2(c)) PROPOSED AMENITY AREA = 69.90 SQ.MTS. PAVED R.G. AREA LINE DIAGRAM 15 BUILT UP AREA OF AMENITY TO BE H/O TO MCGM FREE OF SCALE 1:200 COST IN LIEU OF DEVELOPMENT PERMISSION GRANTED AS PER CHANGE OF USER FROM INDUSTRIAL TO COMMERCIAL - U/N- Ch. E/B.P./12977 DT. 16TH FEB 2019 PAVED R.G. AREA CALCULATION 1 0.50 X 11.76 X 4.99 X 1 NO = 29.34 SQ.MT. 16 TDR GENERATED IF ANY AS PER REGULATION 30(A) AND 32 REQUIRED R.G. AREA = 1395.96 X 15 % = 209.39 SQ.MTS 2 0.50 X 11.76 X 4.87 X 1 NO = 28.64 SQ.MT. -- PROPOSED R.G. AREA = 210.24 + 63.43 = 273.67 SQ.MTS ADJ. CTS NO 3 4 8.37 6.50 X 5.10 X 1 NO X 3.15 X 1 NO = = 42.69 20.47 SQ.MT. SQ.MT. 17 FUNGIBLE COMPENSATORY AREA AS PER REGULATION NO -- 4/ A 5 9.91 X 5.10 X 1 NO = 50.54 SQ.MT. 31(3) 6 0.50 X 7.84 X 3.92 X 1 NO = 15.37 SQ.MT. 22.53 i) PERMISSIBLE FUNGIBLE COMPENSATORY AREA FOR REHAB 2.89 2.74 8 7 0.50 X 7.84 X 4.89 X 1 NO = 19.17 SQ.MT. 9 -- North COMPONENT WITHOUT CHARGING PREMIUM TOTAL ADDITION = 206.22 SQ.MT. X R.G. REQUIRED ON GR FLR = 125.63+62.82 = 188.45 SQ.MT. R.G.1 ii) FUNGIBLE COMPENSATORY AREA AVAILED FOR REHAB NO -- PLOT BOUNDARY COMPONENT WITHOUT CHARGING PREMIUM S R.G. ON MOTHER EARTH AREA LINE C T REQUIRED 60% R.G AREA AT GROUND LEVEL = 209.39 X 60% = 125.63 SQ.MT b) J . / B 41.12 50% R.G. IS ON MOTHER EARTH = (209.39 X 60%) / 2 = 125.63/2 = 62.82 SQ.MT R.G.2 DIAGRAM A D 4 50% R.G. IS PAVED = (209.39 X 60%) / 2 = 125.63/2 = 62.82 SQ.MT SCALE 1:200 i)PERMISSIBLE FUNGIBLE COMPENSATORY AREA BY CHARGING PREMIUM ( 13 X 35%) 2439.84 PAVED WITH PERFORATED PAVING R.G. ON MOTHER EARTH AREA CALCULATION ii) FUNGIBLE COMPENSATORY AREA AVAILED ON PAYMENT OF AS PER REG. 27 (I) NOTE (2) 1 0.50 X 22.53 X 2.89 X 1 NO = 32.56 SQ.MT. PREMIUM 2439.84 2 0.50 X 22.53 X 2.74 X 1 NO = 30.87 SQ.MT. REQUIRED R.G.1- 209.40 SQ.MT. TOTAL ADDITION = 63.43 SQ.MT. X 18 TOTAL BUILT UP AREA PERMISSIBLE INCLUDING FUNGIBLE 9414.74 PROPOSED R.G.1- 210.24 SQ.MT. COMPENSATORY AREA (13+17(a)(ii)+17(b)(ii)) 6.00 6.28 18 TOTAL BUILT UP AREA PROPOSED INCLUDING FUNGIBLE 9413.06 COMPENSATORY AREA (13+17(a)(ii)+17(b)(ii)) B A TOTAL PLOT AREA STATEMENT A 19 FSI CONSUMED ON NET PLOT (14/4) 5.00 II) OTHER REQUIREMENTS NET PLOT AREA = 1398.46 SQ.MT. (A) RESERVATION / DESIGNATION -- 0.63 1.05 1.05 1.05 1.05 1.05 0.63 TOTAL SET-BACK AREA = 120.54 SQ.MT. a) NAME OF RESERVATION 4.51 FRD UP 4.55 -- 3.02 2.50 b) AREA OF RESERVATION AFFECTING THE PLOT 27.45 MT WIDE SAKIVIHAR ROAD 3.00 TOTAL PLOT AREA = 1519.00 SQ.MT. -- BUILDING LINE ABOVE 1.52 3.00 1.50 TOILET DN c) AREA OF RESERVATION LAND TO BE HANDED/HANDED STAMP OF DATE OF RECEIPT OF PLANS 1.50X1.45 6.20 NET PLOT AREA CALCULATION OVER AS PER REGULATION NO.17 -- 3.35 1 1.50 0.35 d) BUILT UP AREA OF AMENITY TO BE HANDED OVER AS PER STAIRCASE 13. 1 = 0.50 X 51.75 X 22.87 X 1 NO. = 591.76 SQ.MT. -- B REGULATION NO.17 1.50 PRESSURIATION 1.50 SHOP 1 2 = 0.50 X 51.75 X 31.08 X 1 NO. = 804.20 SQ.MT. 1.50 UP RS 14.70M X 6.24M CUTOUT CAR LIFT CAR LIFT e) AREA/BUILT UP AREA DESIGNATION -- UP FRD 3.30MX6.65M 3.30MX6.65M NET PLOT AREA = 1395.96 SQ.MT. +0.30 FIRE 40 2 SET - BACK AREA CALCULATION (B) PLOT AREA /BUILT UP AMENITY TO BE HANDED OVER AS PER REGULATION NO. LIFT LIFT i) 14(A) -- MT SET - BACK - 1 2MX2.4M 2MX2.4M ii) 14(B) -- 4.50 A = 0.50 X 34.80 X 2.68 X 1 NO. = 46.63 SQ.MT. iii) 15 -- B = 0.50 X 34.80 X 2.436 X 1 NO. = 42.39 SQ.MT. (C) REQUIREMENT OF RECREATIONAL OPEN SPACE IN WID BASEMENT LINE BELOW TOTAL SET-BACK - 1 = 89.02 SQ.MT. -- C 2.00 C' LAYOUT/PLOT AS PER REGULATION NO.27 +0.30 SET - BACK - 2 (D) TENEMENT STATEMENT LIFT LOBBY ENTRANCE LOBBY C i) PROPOSED BUILT UP AREA (13 ABOVE) 1.50 C = 0.50 X 40.93 X 1.54 X 1 NO. = 31.52 SQ.MT. -- ED 4.99 X 4.16 6.63M X 11.44M East FRD 1.50 ii) LESS DEDUCTION OF NON-RESIDENTIAL AREA (SHOP ETC) 31.05 UP 5% AMENITY TOTAL SET-BACK - 2 = 31.52 SQ.MT. SHOP 2 -- West M.S Step RS 14.70M X 6.40M 9.96M X 6.12M PLOT AREA CALCULATION SET - BACK 0.45 B.U.A 69.93 SQ.M SCALE 1:500 iii) AREA AVAILABLE FOR TENEMENTS [(I) MINUS (ii)] -- .P. 1.50 1.50 TOTAL SET-BACK - (1 + 2 ) = 120.54 SQ.MT. 19.73 +0.30 iv) TENEMENTS PERMISSIBLE (DENSITY OF TENEMENTS / SET -- HECTARE) F.D RO LIFT (v) TOTAL NUMBER OF TENEMENTS PROPOSED ON THE PLOT 2.71 -- CK 2MX2.4M FIRE PANEL (E) PARKING STATEMENT E.D - BA NORTH Plot boundary i) PARKING REQUIRED BY REGULATIONS FOR- AD 146 NOS TOILET FRD CAR,SCOOTER/MOTOR CYCLE, OUTSIDERS (VISITORS) 0.91 3.02 FRD 1.37X 1.45 ii) COVERED GARAGE PERMISSIBLE -- EAST 1.75 VOID 1.60 DN UP iii) COVERED GARAGE PROPOSED CAR SCOOTER/ MOTOR 2.50 1.50 -- 1.50 CYCLE OUTSIDER (VISITORS) BUILDING LINE ABOVE PROPOSED BLDG. 1.50 2 BASEMENTS + GR. FLR. + 1ST AND 2ND SHOP 3 FRD FLOOR + 3RD & 4TH PARKING + 5TH TO iv) TOTAL PARKING PROVIDED 155 NOS UP 16.35M X 6.50M 15TH ( PART )FLOOR DESCRIPTION OF PROPOSAL & PROPERTY RS 3.00 (F) TRANSPORT VEHICLES PARKING 5.93 PUMP RM. / CTS NO. 4/2 PANEL RM. SUBSTATION (i) SPACE FOR TRANSPORT VEHICLES PARKING REQUIRED BY 1.50 +0.30 SOCIETY OFFICE 1 NO 4.65M X 3.89M 3.68M X 6.51M 8.00M X 5.00M REGULATION PROPOSED BUILDING ON PROPERTY BEARING (ii) SPACE FOR TRANSPORT VEHICLES PARKING SPACE C.T.S. NO - 4/2 OF PROPERTY , AT VILLAGE - MOHILI, TOILET TOILET 4.50 1 NO 3.83 2.50 PROVIDED TAL - KURLA ON SAKIVIHAR ROAD . KURLA ( W ) . 1.20X 1.50 1.30X WEST Plot boundary 1.85 3.35 1.70 1.68 1.68 FRD FRD 2.00 3.51 5.22 SOUTH G NOTES NAME OF OWNER 3.00 2.50 1.34 3.83 BOUNDARY OF THE PLOT BOUNDED THICK BLACK 6 5 4 PROPOSED WORK SHOWN RED FILLED IN JATIN 1 2 3 Digitally signed by JATIN VALJIBHAI B' 38.74 BLOCK PLAN. RECREATION AREA SHOWN GREEN WASH DAISARIA 4.66 LOS MIYAWAKI PATTERN PLANTATION A' 4.60 SITE U/R SCALE 1:500 DN: c=IN, o=Personal, cn=JATIN VALJIBHAI 4.72 AREA UNDER SETBACK SHOWN DOTTED BROWN 5.69 DAISARIA, 3.16 2.63 LOS AREA ON MOTHER EARTH VALJIBHAI serialNumber=84da8ed12e5762ccafcf6810 3.15 DRAINAGE SHOWN RED e6fe126f2b1cb330c278889dfda20b3c9372 REQUIRED R.G.2- 62.82 SQ.MT. PLOT BOUNDARY 1.92 PROPOSED R.G.2- 63.43 SQ.MT. 1.71 AREA UNDER PROPOSED ROAD SHOW BROWN WASH eebd, postalCode=400077, 2.5.4.20=966773efe18ed8542fc60ab4b35c DAISARIA 67 4 A STRUCTURES TO BE DEMOLISHED SHOW DOTTED YELLOW b3ede4a5b4488173ca767e43f14ffd90b601 DO2.1 DIMENSIONS OF BALCONIES ARE OUTSIDE DIMENSIONS , st=Maharashtra R 700 Date: 2021.03.26 14:59:49 +05'30' MAROL 70 1 M/S. SKYBLU DEVELOPERS GROUND FLOOR PLAN 1 4B 5/2 CERTIFICATE OF AREA SIGN.NAME & ADDRESS OF ARCHITECT DPU2.1 ADJ. 45 4A .7 0M S-STN. 2 ML23 4/2 CERTIFIED THAT I HAVE SURVEYED THE PLOT UNDER REFERENCE ON 10.08.2018 CTS NO. 513 South 45 .70 M Digitally signed AND THAT THE DIMENSION OF SIDES ETC. OF THE PLOT STATED ON THE PLAN ARE MANOJ by MANOJ DPU5.2 5/4 A S S O C I A T E S 4/ 1 4/3B A c 45 M 4/3 56 4 27 AS MEASURED ON SITE AND THE AREA SO WORKED OUT 1519.00 SQ.MT. AND TALLIES 72 . 16 45 ARCHITECTURE I URBAN DESIGN I PROJECT MANAGEMENT I INTERIORS VALJIBHAI VALJIBHAI .7 B DPU2.1 0M 4/3 R.C.C. COPING Web :- www.daisaria.com E-mail :- admin@daisaria.com WITH THE AREA STATED IN THE DOCUMENT OF OWNERSHIP / T.P. SCHEME RECORD DAISARIA 3 72 801, SKYLINE EPITOME, KIROL ROAD, 1.50 DAISARIA Date: 72 5/5 0.23 THK. BRICK WORK 2021.03.26 2 72 4/5 5/1 NEAR JOLLY GYMKHANA, VIDYAVIHAR (WEST), 5 45 MUMBAI - 400086 .7 0M SAKINAKA G.LVL. G.LVL. 18:07:51 +05'30' TEL :- 022 - 61110504 MANOJ Digitally signed by M.V. DAISARIA 21 .3 5M MANOJ VALJIBHAI 72 6 VALJIBHAI DAISARIA NORTH LINE REMARKS JOB NO: 849 SCALE: AS SHOWN SECTION THROUGH Date: 2021.03.26 LOCATION PLAN. DAISARIA 18:11:41 +05'30' DRG. NO: 01 DRAWN BY: Sonali SCALE 1:4000 COMPOUND WALL AMENDED SIGNATURE OF ARCHITECT GROUND FLOOR PLAN scale = 1: 100 MANOJ V.DAISARIA DATE: 26.03.2021 CHK. BY: SANGAM SCALE 1:100 ( CA / 82 / 7254 ) \\Server\daisaria\02_Projects\849 - BATRA PROPERTIES ( SAKINAKA )\02_BMC\Option 3\03 Concession\28-01-2021_G+15PT PDF DRAFT CORRECTIONS | Batra Niwas _G+15 PART _Full FSI _26-03-2021 02/05 METER RM. AREA CALCULATION 3.95 PARKING STATEMENT 1 3.95 X 6.80 X 1 NO = 26.86 SQ.MT. TRIPPLE STACK STACK PARKING TOTAL METER RM. AREA = 26.86 SQ.MT. PARKING TOTAL NOS FLOOR BIG CAR SMALL CAR BIG CAR SMALL CAR OF PARKING B A 2ND - 1x2=2 7X3 =21 8X3 =24 47 BASEMENT 6.80 B A 1ST BASEMENT 7X2 =14 10X2 =20 - - 34 GROUND FLR - - 2x3=6 - 6 34.74 34.72 0.45 3RD FLR 11X2 =22 6X2 =12 - - CURTAIN WALL 34 0.45 S.S. 0.45 S.S. (PARKING) 0.45 S.S. 0.45 S.S. 4.55 0.45 0.45 0.45 4TH FLR 11X2 =22 6X2 =12 - - STACK PARKING STACK PARKING 1.60 3.00 1.60 STACK PARKING STACK PARKING 2.50 34 1.50 3.02 (PARKING) 6.20 1.60 3.00 1.60 3.35 6.20 TOTAL 58 46 27 24 155 17 18 1.50 DN 0.35 23 24 3.35 16 19 AREA LINE DIAGRAM PARKING AREA STATEMENT (GROUND TO 2ND & 5TH TO 15TH-PART) 1.50 SPACE FOR E BOV UP STACK PARKING STACK PARKING 22 25 CAR LIFT CAR LIFT OF METER RM. METER 6.58 29 30 S PARKING SPACE FOR EVERY 37.50 SQ.MT OF FLOOR AREA UPTO 1500 SQ.MT 1.68 15 20 FRD 15 16 6.18 21 3.30 X 6.50M 3.30 X 6.50M SCALE 1:100 17 UP 24 =1500 / 37.50 = 40.00 NOS. INE A 20 S S 21 26 28 31 STACK PARKING FRD CAR LIFT CAR LIFT 6.50 ING L U.G.TANK 22 23 3.30 X 6.50M 3.30 X 6.50M 1 PARKING FOR 75.00 SQ.MT EXCEEDING 1500 SQ.MT LIFT 18 19 (8222.90 - 1500.00)= 6722.90/75 = 89.63 NOS. PIT + STACK PARKING B B 2MX2.4M 27 32 S S LIFT LIFT D BUIL 14 13 S STACK PARKING REQUIRED PARKING = 129.63 SAY 130 NOS S S B B 2MX2.4M 2MX2.4M PIT + STACK PARKING 10% VISITORS PARKING = 12.96 SAY 13 NOS 11.43 2.21 PIT + STACK PARKING STACK PARKING STACK PARKING 2.21 AMENITY PARKING = 3 NOS C 1.50 SMOKE CHECK LOBBY C' TOTAL REQUIRED PARKING = 146 NOS 6.20 14 13 S FRD C C' TOTAL PARKING PROPOSED = 155 NOS. Y1 12 11 S STACK PARKING 4.16 6.00M WIDE DRIVEWAY 6.00M WIDE DRIVEWAY STACK PARKING DRIVEWAY 1 PROFORMA - B 19.90 6.24 4.7 6.12 5.20 M WIDE DRIVEWAY 6.00M WIDE DRIVEWAY 5.22 6.00M WIDE DRIVEWAY 6.12 CONTENTS OF SHEET 9 10 S SPACE FOR SERVICES TUBE AXIAL FAN 7.15 FOR EXHAUST AIR 6.24 AT BASEMENT LEVEL STACK PARKING BASEMENT FLOOR PLAN (1ST AND 2ND) F.D LIFT PODIUM FLOOR PLAN (1ST AND 2ND) 1.50 S.S. 13.72 F.D E.D 0.45 0.45 2MX2.3M PARKING STATEMENT REQUIRED AND PROPOSED E.D PIT + STACK PARKING PIT + STACK PARKING 13.64 FRD SMOKE PIT + STACK PARKING FRD CHECK 1.60 FRD 1.05 STACK PARKING STAMP OF APPROVAL OF PLANS FRD LOBBY STACK PARKING STACK PARKING STACK PARKING UP S S PIT + STACK PARKING B B B B B 1.45 VOID 1.60 1.40 DN UP THIS CANCELS APPROVALS TO THE PREVIOUS PLANS S S B B 10 9 B B B B B B B 4 3 45 44 39 38 33 0.91 SANCTIONED UNDER NO.CHE/ES/5513/L/337/NEW STACK PARKING STACK PARKING METER ROOM U.G.TANK 3.00 6.20 6.35 11 8 3.65 X 6.50 3 2 33 32 29 28 25 DATED 04-02-2020 STACK PARKING STACK PARKING STACK PARKING STACK PARKING STACK PARKING 5 46 43 40 37 34 7 6 STACK PARKING STACK PARKING 2 3.00 6.20 6.35 7.85 12 7 4 34 27 26 6 47 42 41 36 35 8 5 1 31 30 1 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS 1.50 OFFICE LETTER NO: CHE/ES/5513/L/337/NEW 3.35 SERV 1.50 Bajirao 1.68 1.68 TOILET Digitally signed by 1.20X 4.50 1.48 1.68 3.35 1.68 Bajirao Lahu Patil 10.42 Lahu Patil Date: 2021.03.31 8.29 1.61 OPEN TO SKY VENTILATION 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 11:38:52 +05'30' S.S. S.S. CURTAIN WALL S.S. 3.83 S.S. EXECUTIVE ENGINEER BLDG. PROP - II 22.34 41.05 A' 7.83 1.80 5.52 2.85 3.50 1.05 1.65 5.31 3.15 7.58 SHINDE Digitally signed by SHINDE SACHIN BALAKRISHNA DN: c=IN, o=Personal, B' 4.50 SACHIN Yatish 2.5.4.20=7b59065f4fa84deb22428 B' A' 46faa1c66969bde5390f6fb05b0ea Digitally signed by Yatish Shirishchandra Randeria 3.16 DN: c=IN, o=Personal, 03bda45f4cd62e, 3.54 postalCode=400701, Shirishcha 2.5.4.20=467be74326f300aba080753 ca05f41e4bf1e83372f9ea23472545b BALAKRIS 4747cd8c81, postalCode=400050, st=MAHARASHTRA, 2ND BASEMENT FLOOR PLAN T1 1.65 serialNumber=a86ecc52f6867d25a 63b85a857ff60210a6a60137f0aa3 ndra st=Maharashtra, serialNumber=2d42aad0dac27f094c 507a3cc1b035ee9669670b59d142df 98c8f6cc611aef0f, cn=Yatish Randeria HNA 069cb6a4ec5ac04c39, cn=SHINDE Shirishchandra Randeria SCALE 1:100 1.35 SACHIN BALAKRISHNA Date: 2021.03.30 16:03:39 +05'30' Date: 2021.03.30 12:09:25 +05'30' AREA LINE DIAGRAM OF SERVANT TOILETS SCALE 1:100 S.E. (B.P.) L/W A.E. (B.P.) L & N SERVANT TOILET AREA CALCULATION BIG PARKING. = 22 NOS 4TH FLOOR (PARKING) PODIUM T1 1.35 X 1.65 X 1 NO = 2.23 SQ.MT. SMALL PARKING. = 12 NOS SCALE 1:100 TOTAL SERVANT TOILET AREA = 2.23 SQ.MT. Y1 TOTAL PROP. PARKING = 34 NOS. TOTAL SERVANT TOILETS PROPOSED AT MID LANDING LEVEL= 6 NOS. STAMP OF DATE OF RECEIPT OF PLANS 6.00 6.30 B B A A 34.72 0.45 S.S. CURTAIN WALL 0.45 0.45 S.S. 0.45 S.S. 0.45 S.S. 4.55 34.74 0.45 0.45 0.45 4.55 3.02 2.50 3.00 1.60 3.00 1.60 6.20 1.52 3.00 1.50 1.50 DN 1.50 DN 3.35 6.20 3.35 SPACE FOR VE ABO 0.35 METER S 1.68 15 16 6.18 21 MH MH 13 16 17 20 UP 24 1.50 CAR LIFT CAR LIFT 6.50 LINE 17 UP STACK PARKING 20 CAR LIFT CAR LIFT FRD 14 15 6.58 22 23 3.30 X 6.50M 3.30 X 6.50M FRD 18 19 DING 21 23 3.30 X 6.50M 3.30 X 6.50M 18 19 S S I L LIFT LIFT U S S B 14 13 S STACK PARKING MH MH LIFT 22 24 B B 2MX2.4M 2MX2.4M STACK PARKING B B 11.43 2MX2.4M STACK PARKING S S STACK PARKING 2.21 STACK PARKING 2.21 4.50 STACK PARKING C C' C 1.50 SMOKE CHECK LOBBY C' 6.20 12 11 S 12 11 S FRD 4.16 14.07 STACK PARKING DRIVEWAY 1 4.7 STACK PARKING 6.00M WIDE DRIVEWAY 6.12 6.00M WIDE DRIVEWAY 6.00M WIDE DRIVEWAY 6.00M WIDE DRIVEWAY 19.90 6.24 S 6.12 9 10 7.15 9 10 4.77 6.24 STACK PARKING S F.D STACK PARKING TUBE AXIAL FAN LIFT DESCRIPTION OF PROPOSAL & PROPERTY 1.50 FOR EXHAUST AIR S.S. 2MX2.3M 0.45 0.45 AT BASEMENT LEVEL E.D PROPOSED BUILDING ON PROPERTY BEARING 13.64 C.T.S. NO - 4/2 OF PROPERTY , AT VILLAGE - MOHILI, 13.72 F.D E.D FRD 1.05 STACK PARKING STACK PARKING STACK PARKING STACK PARKING TAL - KURLA ON SAKIVIHAR ROAD . KURLA ( W ) . STACK PARKING STACK PARKING 1.45 VOID 1.60 FRD DN UP FRD SMOKE STACK PARKING CHECK 1.60 LOBBY DN UP B B B B B B B B B B 0.91 S S STACK PARKING B B D.G SET MH MH B B 1.40 NAME OF OWNER 1.05 3 2 33 32 29 28 25 7 6 S S 7 6 3.00 33 32 29 28 25 6.20 6.35 3.00 6.35 7.85 4 34 JATIN 5.93 8 5 1 31 30 27 26 Digitally signed by JATIN VALJIBHAI 8 5 DAISARIA 3 2 34 DN: c=IN, o=Personal, cn=JATIN VALJIBHAI 31 30 27 26 DAISARIA, VALJIBHAI serialNumber=84da8ed12e5762ccafcf6810 MH MH 4 1 SERV e6fe126f2b1cb330c278889dfda20b3c9372 TOILET 1.50 eebd, postalCode=400077, 1.20X 4.50 2.5.4.20=966773efe18ed8542fc60ab4b35cb 1.50 DAISARIA 3.35 1.48 1.68 1.68 3ede4a5b4488173ca767e43f14ffd90b601, 3.35 st=Maharashtra 1.68 1.68 4.50 Date: 2021.03.26 15:00:13 +05'30' 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 3.00 S.S. S.S. CURTAIN WALL S.S. 8.29 10.42 3.83 S.S. M/S. SKYBLU DEVELOPERS 1.69 1.61 OPEN TO SKY VENTILATION 7.83 1.80 5.52 2.85 3.50 1.05 1.65 5.31 3.15 7.58 SIGN.NAME & ADDRESS OF ARCHITECT 4.50 22.34 4.50 B' A' 4.80 A' 3.16 41.05 3.54 A S S O C I A T E S MANOJ Digitally signed by MANOJ VALJIBHAI ARCHITECTURE I URBAN DESIGN I PROJECT MANAGEMENT I INTERIORS B' VALJIBHAI DAISARIA Web :- www.daisaria.com E-mail :- admin@daisaria.com 801, SKYLINE EPITOME, KIROL ROAD, Date: 2021.03.26 BIG PARKING. = 22 NOS 3RD FLOOR (PARKING) PODIUM DAISARIA 18:12:45 +05'30' NEAR JOLLY GYMKHANA, VIDYAVIHAR (WEST), MUMBAI - 400086 TEL :- 022 - 61110504 1ST BASEMENT FLOOR PLAN SMALL PARKING. = 12 NOS SCALE 1:100 M.V. DAISARIA SCALE 1:100 = NORTH LINE REMARKS JOB NO: 849 SCALE: AS SHOWN TOTAL PROP. PARKING 34 NOS. DRG. NO: 02 DRAWN BY: Sonali AMENDED DATE: 26.03.2021 CHK. BY: SANGAM \\Server\daisaria\02_Projects\849 - BATRA PROPERTIES ( SAKINAKA )\02_BMC\Option 3\03 Concession\28-01-2021_G+15PT PDF DRAFT CORRECTIONS | Batra Niwas _G+15 PART _Full FSI _26-03-2021 BUILT UP AREA CALCULATION OF FIRST FLOOR 03/05 BUILT UP AREA CALCULATION OF SECOND FLOOR 14.85 6.20 0.45 4.89 7.28 A 0.53 A 38.74 0.90 X 19.73 X 1 NO = 764.34 SQ.MT. A 38.74 X 19.73 X 1 NO = 764.34 SQ.MT. ST3 X 0.10 X 2 NOS = 0.18 SQ.MT. ST5 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. 0.45 S.S. GLAZING 0.45 S.S. B 0.45 S.S. GLAZING 0.45 S.S. 38.74 TOTAL ADDITION = 764.52 SQ.MT. X 0.45 0.45 0.45 0.55 0.59 TOTAL ADDITION = 764.52 SQ.MT. X DEDUCTIONS DEDUCTIONS 1.60 3.00 1.60 6.20 4.78 1 ( 0.59 + 2.21 ) / 2 X 6.50 X 1 NO = 9.10 SQ.MT. TOILET TOILET TOILET 1.50X1.45 1.50X1.45 1.50 DN 1.50X1.45 0.53 -0.53 X 0.55 X 1 NO = -0.29 SQ.MT. 1 ( 0.59 + 2.21 ) / 2 X 6.50 X 1 NO = 9.10 SQ.MT. 6.20 0.55 -0.53 X 0.55 X 1 NO = -0.29 SQ.MT. 3.35 1 2 0.39 X 0.15 X 1 NO = 0.06 SQ.MT. 0.35 2 0.39 X 0.15 X 1 NO = 0.06 SQ.MT. ST1 3.65 3 20.34 X 4.78 X 0.50 X 1 NO = 48.61 SQ.MT. 3 20.34 X 4.78 X 0.50 X 1 NO = 48.61 SQ.MT. OFFICE 11 3 4 1.05 X 4.85 X 1 NO = 5.09 SQ.MT. 1.50 UP 4 1.05 X 4.85 X 1 NO = 5.09 SQ.MT. 7.83M X 6.23M CAR LIFT CAR LIFT 4a 1.00 X 1.65 X 1 NO = 1.65 SQ.MT. 54.24 SQ.MTS FRD 3.30MX6.65M 3.30MX6.65M 5.95 CL 6.65 6.50 5 0.91 X 1.45 X 1 NO = 1.32 SQ.MT. 4a 1.00 X 1.65 X 1 NO = 1.65 SQ.MT. 5 0.91 X 1.45 X 1 NO = 1.32 SQ.MT. 583.83 SQ.FT OFFICE 12 OFFICE 1 6 4.55 X 19.73 X 1 NO = 89.77 SQ.MT. FIRE 1.66 TOTAL DEDUCTION = 65.54 SQ.MT. Y1 6.57M X 8.42M 4.74MX 8.42M TOTAL DEDUCTION = 155.31 SQ.MT. Y1 LIFT LIFT 2.25 GROSS BUILT UP AREA [X - Y1] = 698.98 SQ.MT. X1 55.98 SQ.MTS C.A 41.63 SQ.M L1 2.71 STL1 GROSS BUILT UP AREA [X - Y1] = 609.21 SQ.MT. X1 2MX2.4M 2MX2.4M 602.56 SQ.FT 448.10 SQ.FT 1.66 2.21 1ST FLOOR STAIRCASE, LIFT, LOBBY AREA CALCULATION 2ND FLOOR STAIRCASE, LIFT, LOBBY AREA CALCULATION 4.54 7.13 0.39 1.50 1.50 ST1 6.20 X 3.65 X 1 NO = 22.63 SQ.MT. ST1 6.20 X 3.65 X 1 NO = 22.63 SQ.MT. C 4.81 C' 0.45 2 2.21 ST2 1.40 X 1.45 X 1 NO = 2.03 SQ.MT. ST2 1.40 X 1.45 X 1 NO = 2.03 SQ.MT. 0.15 ST3 2.25 X 1.60 X 1 NO = 3.60 SQ.MT. ST3 2.25 X 1.60 X 1 NO = 3.60 SQ.MT. 3.60 ST4 3.50 X 4.90 X 1 NO = 17.15 SQ.MT. ST4 3.50 X 4.90 X 1 NO = 17.15 SQ.MT. LIFT LOBBY LL1 3.60 4.99 X 4.16 ST5 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. ST5 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. FRD FRD FRD L1 4.54 X 2.71 X 1 NO = 12.30 SQ.MT. OFFICE 10 L1 4.54 X 2.71 X 1 NO = 12.30 SQ.MT. 5.68M X 6.39M FRD 1.24 0.42 0.56 FRD OFFICE 2 0.56 L2 2.31 X 2.86 X 1 NO = 6.61 SQ.MT. L2 2.31 X 2.86 X 1 NO = 6.61 SQ.MT. 20.34 1.80M WIDE PASSAGE 1.80M WIDE PASSAGE 19.73 19.73 20.34 4.81 38.59 SQ.MTS 105.97 Sq.mt STL1 1.66 X 2.25 X 1 NO = 3.74 SQ.MT. STL1 1.66 X 2.25 X 1 NO = 3.74 SQ.MT. 415.38 SQ.FT FRD FRD 1.50 1.50 FRD FRD LL2 STL2 2.03 X 2.25 X 1 NO = 4.57 SQ.MT. 1140.66 SQ.FT A STL2 2.03 X 2.25 X 1 NO = 4.57 SQ.MT. 2.03 3.00 LL1 4.81 X 3.60 X 1 NO = 17.32 SQ.MT. LL1 4.81 X 3.60 X 1 NO = 17.32 SQ.MT. F.D LIFT LL2 3.00 X 0.56 X 1 NO = 1.68 SQ.MT. LL2 3.00 X 0.56 X 1 NO = 1.68 SQ.MT. 0.35 0.45 TOILET 1.45X 2.25 L2 2.86 D1 LL3 3.15 X 0.42 X 0.50 X 1 NO = 0.66 SQ.MT. CL 7.13 X 6.65 X 1 NO = 47.41 SQ.MT. S.S. 2MX2.4M STL2 2.25 1.50 E.D LL4 3.41 X 0.42 X 0.50 X 1 NO = 0.72 SQ.MT. TOTAL STAIRCASE, LIFT, LOBBY AREA = 139.22 SQ.MT. Y2 1.75 LL5 0.51 X 0.07 X 0.50 X 1 NO = 0.02 SQ.MT. 2.03 2.31 DUCT AREA CALCULATION FRD CL 7.13 X 6.65 X 1 NO = 47.41 SQ.MT. 0.45 TOTAL STAIRCASE, LIFT, LOBBY AREA = 140.62 SQ.MT. Y2 D1 0.45 X 2.71 X 1 NOS = 1.22 SQ.MT. VOID 1.60 OFFICE 4 OFFICE 3 5 1.45 ST2 1.45 ST3 1.60 4a 1.65 DN UP TOTAL DUCT AREA = 1.22 SQ.MT. Y3 4.00M X 8.91M 4.15M X 8.91M 0.91 1.40 2.25 1.00 OFFICE 8 DUCT AREA CALCULATION C.A 36.13 SQ.M C.A 37.57 SQ.M 8.22M X 8.91M D1 0.45 X 2.71 X 1 NOS = 1.22 SQ.MT. NET BUILT UP AREA = 558.54 SQ.MT. X2 388.90 SQ.FT 404.40 SQ.FT TOTAL DUCT AREA = 1.22 SQ.MT. Y3 [X1-Y2-Y3] 67.22 SQ.MTS OFFICE 9 3.00 7.83M X 6.50M 723.55 SQ.FT 6.20 NET BUILT UP AREA = 467.37 SQ.MT. X2 56.78 SQ.MTS [X1 -Y2 - Y3] ST4 4.90 4 4.85 611.17 SQ.FT TOILET TOILET SERV TOILET TOILET 1.50 TOILET 1.20X 1.20X TOILET 1.30X 1.20X 1.50X1.45 1.85 1.20X 3.35 1.70 1.85 1.85 7.39 T1 1.65 PROFORMA - B 0.10 1.50 1.68 1.68 ST5 ST5 1.35 3.50 0.10 1.05 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 20.00 0.90 0.90 S.S. S.S. S.S. S.S. CONTENTS OF SHEET AREA LINE DIAGRAM OF 2ND FLOOR 38.74 17.69 SCALE 1:100 1ST & 2ND FLOOR PLAN ,BUA CALCULATION & DIAGRAM 2ND FLOOR PLAN A' BASEMENT AREA CALCULATION TYPICAL REFUGE FLOOR PLAN ,BUA DIAGRAM & CALCULATION 1 40.03 X 17.64 X 0.50 X 1 NO = 353.06 SQ.MT. SCALE 1:100 BASEMENT & PODIUM AREA DIAGRAM CALCULATION B' 34.72 2 40.03 X 17.26 X 0.50 X 1 NO = 345.46 SQ.MT. VENTILATION DUCT DIAGRAM & CALCULATIONS 3 22.34 X 1.61 X 1 NO = 35.97 SQ.MT. 4 (2.21+5.54) /2 X 13.31 X 1 NO = 51.58 SQ.MT. 38.74 0.59 TOTAL DEDUCTION = 786.07 SQ.MT. STAMP OF APPROVAL OF PLANS 4.55 4.78 THIS CANCELS APPROVALS TO THE PREVIOUS PLANS 0.53 0.55 1 SANCTIONED UNDER NO.CHE/ES/5513/L/337/NEW ST1 3.65 11.43 P1 13.38 P2 DATED 04-02-2020 3 6.20 CL 6.65 6.50 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS .26 2.21 OFFICE LETTER NO: CHE/ES/5513/L/337/NEW 2.25 STL1 17 2.71 2 Bajirao Digitally L1 0.55 signed by 40 13.23 34.17 .03 Bajirao Lahu Patil 7 1.66 P3 0.0 Lahu Patil Date: 2021.03.31 4 1 4.54 1 0.5 7.13 0.39 .64 11:40:32 +05'30' LL5 2.21 17 EXECUTIVE ENGINEER BLDG. PROP - II 6.80 6.35 6.35 13.31 2 P6 LL4 0.15 P5 P4 SHINDE 0.42 Digitally signed by SHINDE SACHIN BALAKRISHNA DN: c=IN, o=Personal, 3.41 LL1 3.60 2.5.4.20=7b59065f4fa84deb22428 Yatish SACHIN Digitally signed by Yatish 3.15 20.95 2.25 P7 Shirishchandra Randeria 12.17 46faa1c66969bde5390f6fb05b0ea DN: c=IN, o=Personal, 0.30 03bda45f4cd62e, Shirishcha 2.5.4.20=467be74326f300aba08075 3ca05f41e4bf1e83372f9ea2347254 postalCode=400701, 5b4747cd8c81, 0.55 BALAKRIS postalCode=400050, 3.19 st=MAHARASHTRA, AREA LINE DIAGRAM OF PARKING FLOOR serialNumber=a86ecc52f6867d25a ndra st=Maharashtra, serialNumber=2d42aad0dac27f094 c507a3cc1b035ee9669670b59d142 6 63b85a857ff60210a6a60137f0aa30 20.34 Randeria df98c8f6cc611aef0f, cn=Yatish 19.73 HNA LL3 4.81 69cb6a4ec5ac04c39, cn=SHINDE Shirishchandra Randeria SCALE 1:200 SACHIN BALAKRISHNA Date: 2021.03.30 16:03:52 +05'30' 0.42 LL2 0.56 SERVANT TOILET PROPOSED AT MID LANDING LEVEL OF PARKING FLOOR OF 2.20 SQ.MT. TAKEN FREE 5.54 Date: 2021.03.30 12:09:39 +05'30' A 1.61 3.00 PARKING FLOOR AREA CALCULATION 3 S.E. (B.P.) L/W A.E. (B.P.) L & N P1 0.55 X 11.43 X 1 NO = 6.29 SQ.MT. 2.71 22.34 L2 2.86 D1 6.35 STL2 2.25 P2 34.17 X 13.38 X 1 NO = 457.19 SQ.MT. VENTILATION DUCT AREA CALCULATION 1 P3 2.25 X 13.23 X 1 NO = 29.77 SQ.MT. 1 1.05 6.35 1 NO = 6.67 SQ.MT. AREA LINE DIAGRAM OF BASEMENT FLOOR 0.45 2.03 P4 12.17 X 6.35 X 1 NO = 77.28 SQ.MT. 2 22.34 1.69 1 NO = 37.75 SQ.MT. SCALE 1:200 2.31 1.49 P5 20.95 X 6.35 X 1 NO = 133.03 SQ.MT. 3 (1.49+1.79)/2 1.20 1 NO = 1.97 SQ.MT. 5 1.45 ST2 1.45 ST3 1.60 4a 1.65 P6 0.55 X 6.80 X 1 NO = 3.74 SQ.MT. TOTAL VENTILATION DUCT PROPOSED = 46.39 SQ.MT. 1.20 3 0.91 1.40 2.25 1.00 P7 (13.23 + 0.30 ) / 2 X 3.19 X 1 NO = 21.58 SQ.MT. 1.05 TOTAL VENTILATION DUCT REQUIRED 2.5% OF BASEMENT AREA = 786.07 X 2.5% = 19.65 SQ.MTS TOTAL PARKING FLOOR AREA = 728.88 SQ.MT. Y1 1.79 STAMP OF DATE OF RECEIPT OF PLANS 2 1.69 22.34 ST4 4.90 4 4.85 AREA LINE DIAGRAM OF VENTILATION CUTOUT SCALE 1:100 B 0.10 ST5 ST5 6.50 3.50 0.10 1.05 0.90 REFUGE AREA 0.90 19.50 SQ.MTS. AREA LINE DIAGRAM OF 1ST FLOOR 37.36 SCALE 1:100 A 16.20 6.50 14.66 0.45 0.45 At staircase mid-landing between 0.45 0.45 S.S. GLAZING S.S. 6th, 8th ,10th, 12th & 14th level. 0.45 S.S. GLAZING 0.15 S.S. 0.45 0.45 0.53 0.45 0.45 14.85 6.20 4.89 7.28 FRD 0.45 S.S. 0.45 S.S. B 0.45 S.S. 0.45 S.S. 1.50 TOILET TOILET 1.60 3.00 1.60 TOILET TOILET TOILET 0.45 0.45 0.45 0.55 1.50X1.45 1.50X 1.50 DN 1.50X1.45 1.20X 1.20X 1.45 6.20 1.85 1.85 ELEVATION FEATURE 3.35 TOILET 1.60 3.00 1.60 TOILET 0.35 IN ALUCOBOND 1.50X1.45 1.50 DN 6.20 1.50X1.45 3.35 OFFICE 11 1.50 UP 1.50 0.35 9.33M X 6.23M OFFICE 3 FRD OFFICE 1 OFFICE 2 ~6.90M X 6.35M 1.50 SHOP 1 1.50 UP OFFICE 12 1.66 4.00M X 8.42M 4.15M X 8.42M 0.60 6.24M X 10.15M CAR LIFT CAR LIFT 5.95 0.60 6.57M X 8.42M LIFT FRD 3.30MX6.65M 3.30MX6.65M LIFT 2.25 0.15 VOID 2MX2.4M 2MX2.4M 11.78 FIRE OFFICE 1 LIFT LIFT 1.66 8.42M X 4.74M 11.43 DESCRIPTION OF PROPOSAL & PROPERTY 2MX2.4M 2MX2.4M 1.50 1.50 2.21 C 4.81 C' PROPOSED BUILDING ON PROPERTY BEARING LIFT LOBBY C.T.S. NO - 4/2 OF PROPERTY , AT VILLAGE - MOHILI, C' 3.60 C FR D 6.20M X 4.16M TAL - KURLA ON SAKIVIHAR ROAD . KURLA ( W ) . OFFICE 10 FRD FRD FRD FRD FRD 1.50 FRD LIFT LOBBY 7.18M X 6.39M FRD 1.80M WIDE PASSAGE 1.24 0.42 0.56 1.80M WIDE PASSAGE FRD OFFICE 4 4.99 X 4.16 9.81 ~5.95M X 6.28M 1.50 FRD NAME OF OWNER 21.07 FRD FRD FRD 1.50 1.50 FRD FRD FRD SHOP 2 OFFICE 2 20.34 1.80M WIDE PASSAGE 2.03 19.73 9.17M X 6.40M 106.38 Sq.m F.D JATIN FRD FRD FRD Digitally signed by JATIN VALJIBHAI VOID 1145.07 Sq.ft TOILET LIFT 2.25 1.55 0.45 TOILET DAISARIA 1.50 0.45 1.45X 2MX2.3M 2.71 1.45X DN: c=IN, o=Personal, cn=JATIN VALJIBHAI DAISARIA, F.D 1.50 E.D S.S. VALJIBHAI S.S. 1.50 serialNumber=84da8ed12e5762ccafcf68 LIFT 1.75 10e6fe126f2b1cb330c278889dfda20b3c 2MX2.4M FRD 9372eebd, postalCode=400077, E.D 2.5.4.20=966773efe18ed8542fc60ab4b3 FRD DN 1.60 UP DAISARIA 5cb3ede4a5b4488173ca767e43f14ffd90 b601, st=Maharashtra Date: 2021.03.26 15:00:35 +05'30' 1.00 OFFICE 8 OFFICE 7 OFFICE 6 VOID 1.60 OFFICE 4 OFFICE 3 4.15M X 10.25M M/S. SKYBLU DEVELOPERS DN UP 0.15 8.22M X 10.25M 4.00M X 10.25M 8.91M X 4.15M 8.91M X 4.15M 1.50 OFFICE 9 3.00 SIGN.NAME & ADDRESS OF ARCHITECT 6.50 OFFICE 5 8.39 6.20 1.50 9.33M X 7.84M 8.15 SHOP 3 ~10.25M X 7.84M 6.50M X11.80M 3.00 6.20 6.50 MANOJ Digitally by MANOJ signed A S S O C I A T E S VOID TOILET SERV TOILET TOILET TOILET VALJIBH DAISARIA VALJIBHAI ARCHITECTURE I URBAN DESIGN I PROJECT MANAGEMENT I INTERIORS 1.50 TOILET TOILET 1.20X 1.20X AI 1.50X1.45 1.20X 1.20X 1.30X Web :- www.daisaria.com E-mail :- admin@daisaria.com 1.85 1.50 1.68 3.35 1.68 1.70 1.85 1.85 Date: 801, SKYLINE EPITOME, KIROL ROAD, TOILET TOILET TOILET 2021.03.26 NEAR JOLLY GYMKHANA, VIDYAVIHAR (WEST), DAISARIA 18:13:24 +05'30' MUMBAI - 400086 TOILET 1.50 1.50 1.20X 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 1.20X 1.30X 1.20X 4.55 1.85 3.35 1.70 1.85 0.15 TEL :- 022 - 61110504 1.68 1.68 1.85 S.S. S.S. S.S. S.S. M.V. DAISARIA 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 20.00 NORTH LINE REMARKS JOB NO: 849 SCALE: AS SHOWN S.S. S.S. S.S. S.S. 7.98 1.50 5.82 0.15 6.20 1.05 0.15 1.65 5.46 2.85 10.12 42.63 17.69 ELEVATION FEATURE B' 0.60 DRG. NO: 03 DRAWN BY: Sonali 1ST FLOOR PLAN 38.74 A' IN ALUCOBOND TYPICAL 6TH, 8TH,10TH, 12TH & 14TH - MID LANDING REFUGE PLAN AMENDED DATE: 26.03.2021 B' CHK. BY: SANGAM \\Server\daisaria\02_Projects\849 - BATRA PROPERTIES ( SAKINAKA )\02_BMC\Option 3\03 Concession\28-01-2021_G+15PT PDF DRAFT CORRECTIONS | Batra Niwas _G+15 PART _Full FSI _26-03-2021 37.37 16.20 6.50 14.66 04/05 1.60 3.00 1.60 OFFICE CARPET AREA 1.50 6.20 DN BUILT UP AREA CALCULATION FRD BUILT UP AREA CALCULATION STATEMENT TYPICAL FLOOR ( 5TH-14TH) CARPET AREA OF 3.35 15TH FLOOR PART FLOOR A 42.63 X 21.07 X 1 NO = 898.21 SQ.MT. 1.70 A 42.63 X 21.07 X 1 NO = 898.21 SQ.MT. OFFICE (SQ.M) TOTAL ADDITION = 898.21 SQ.MT. X TOTAL ADDITION = 898.21 SQ.MT. X GROUND 290.98 DEDUCTIONS DEDUCTIONS 1ST 422.28 1 0.50 X 21.72 X 5.11 X 1 NO = 55.49 SQ.MT. 1 0.50 X 21.72 X 5.11 X 1 NO = 55.49 SQ.MT. 2 ( 0.82 + 1.19 ) / 2 X 1.50 X 1 NO = 1.51 SQ.MT. TERRACE BELOW 2ND 494.11 2 ( 0.82 + 1.19 ) / 2 X 1.50 X 1 NO = 1.51 SQ.MT. LIFT MACHINE 3 2.85 X 1.34 X 1 NO = 3.82 SQ.MT. 3.23 ON 15TH FLOOR 3RD 0.00 11.78 3 2.85 X 1.34 X 1 NO = 3.82 SQ.MT. ROOM 4 1.05 X 4.85 X 1 NO = 4.85 SQ.MT. 11.43 4 1.05 X 4.85 X 1 NO = 4.85 SQ.MT. 4TH 0.00 4a 1.00 X 1.65 X 1 NO = 1.65 SQ.MT. 4a 1.00 X 1.65 X 1 NO = 1.65 SQ.MT. 4.39 5TH 644.11 5 6.20 X 1.34 X 1 NO = 8.31 SQ.MT. 5 6.20 X 1.34 X 1 NO = 8.31 SQ.MT. ST4 -0.90 X 0.10 X 2 NOS = -0.18 SQ.MT. 6TH 644.11 ST4 -0.90 X 0.10 X 2 NOS = -0.18 SQ.MT. 6 2.70 X 1.34 X 1 NO = 3.62 SQ.MT. 6 2.70 X 1.34 X 1 NO = 3.62 SQ.MT. 7TH 644.11 7 1.50 X 1.34 X 1 NO = 2.01 SQ.MT. 7 1.50 X 1.34 X 1 NO = 2.01 SQ.MT. 8TH 644.11 8 1.05 X 1.50 X 1 NO = 1.58 SQ.MT. 8 1.05 X 1.50 X 1 NO = 1.58 SQ.MT. 9TH 644.11 TOTAL DEDUCTION = 82.66 SQ.MT. Y1 T 8.31 X 8.57 X 1 NO = 71.22 SQ.MT. TOTAL BUILT UP AREA [X - Y1] = 815.55 SQ.MT. X1 10TH 644.11 TOTAL DEDUCTION = 153.88 SQ.MT. Y1 21.72 11TH 644.11 21.07 3.80 TOTAL BUILT UP AREA [X - Y1] = 744.33 SQ.MT. X1 STAIRCASE,LIFT,LOBBY AREA CALCULATION TERRACE OPEN TO SKY 12TH 644.11 ST1 6.20 X 3.65 X 1 NO = 22.63 SQ.MT. LIFT MACHINE TERRACE OPEN TO SKY 15TH FLOOR STAIRCASE,LIFT,LOBBY AREA CALCULATION 13TH 644.11 3.16 ST2 2.25 X 0.15 X 1 NO = 0.34 SQ.MT. ROOM 1.55 REFUGE AREA CALCULATION ST1 6.20 X 3.65 X 1 NO = 22.63 SQ.MT. 1.50 14TH 644.11 ST3 3.50 X 6.35 X 1 NO = 22.23 SQ.MT. D R1 6.50 X 3.00 X 1 NO = 19.50 SQ.MT. ST2 2.25 X 0.15 X 1 NO = 0.34 SQ.MT. 15TH(PART) 574.43 ST4 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. TOTAL REFUGE AREA = 19.50 SQ.MT. ST3 3.50 X 6.35 X 1 NO = 22.23 SQ.MT. L1 4.54 X 2.71 X 1 NO = 12.30 SQ.MT. ST4 0.90 X 0.10 X 2 NOS = 0.18 SQ.MT. TOTAL 8222.90 L2 2.31 X 2.86 X 1 NO = 6.61 SQ.MT. L1 4.54 X 2.71 X 1 NO = 12.30 SQ.MT. 6.50 STL1 1.66 X 2.25 X 1 NO = 3.74 SQ.MT. L2 2.31 X 2.86 X 1 NO = 6.61 SQ.MT. STL2 2.03 X 2.25 X 1 NO = 4.57 SQ.MT. STL1 1.66 X 2.25 X 1 NO = 3.74 SQ.MT. 3.00 R1 LL1 4.81 X 3.60 X 1 NO = 17.32 SQ.MT. STL2 2.03 X 2.25 X 1 NO = 4.57 SQ.MT. LL2 0.42 X 1.24 X 1 NO = 0.52 SQ.MT. LL1 4.81 X 3.60 X 1 NO = 17.32 SQ.MT. LL3 3.00 X 0.56 X 1 NO = 1.68 SQ.MT. 6.20 OVER HEAD WATER TANK LL2 0.42 X 1.24 X 1 NO = 0.52 SQ.MT. PROFORMA - B TOTAL STAIRCASE, LIFT, LOBBY AREA = 92.12 SQ.MT. Y2 8.15 8.39 LL3 3.00 X 0.56 X 1 NO = 1.68 SQ.MT. TOTAL STAIRCASE, LIFT, LOBBY AREA = 92.12 SQ.MT. Y2 DUCT AREA CALCULATION CONTENTS OF SHEET D1 0.45 X 2.71 X 1 NOS = 1.22 SQ.MT. DUCT AREA CALCULATION TOTAL DUCT AREA = 1.22 SQ.MT. Y4 TYPICAL FLOOR PLAN 5TH - 14TH, BUA DIAGRAM & CALCULATION D1 0.45 X 2.71 X 1 NOS = 1.22 SQ.MT. 4.55 TERRACE FLOOR PLAN TOTAL DUCT AREA = 1.22 SQ.MT. Y4 NET BUILT UP AREA = 722.21 SQ.MT. X2 15TH PART FLOOR PLAN BUA DIAGRAM & CALCULATION [X1 - Y2- Y3] D' NET BUILT UP AREA [X1 - Y2- Y3] = 650.99 SQ.MT. X2 7.98 1.50 5.82 8.90 5.46 2.85 10.13 STAMP OF APPROVAL OF PLANS 42.64 TERRACE FLOOR PLAN SCALE 1:200 42.63 42.63 THIS CANCELS APPROVALS TO THE PREVIOUS PLANS SANCTIONED UNDER NO.CHE/ES/5513/L/337/NEW 8.31 5.11 5.11 DATED 04-02-2020 ST1 3.65 ST1 3.65 1 1 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS 6.20 OFFICE LETTER NO: CHE/ES/5513/L/337/NEW 6.20 8.57 Bajirao Digitally signed by Bajirao Lahu Patil 2.25 T 2.71 STL1 2.25 L1 L1 2.71 STL1 Lahu Patil Date: 2021.03.31 11:41:24 +05'30' 1.66 1.66 EXECUTIVE ENGINEER BLDG. PROP - II 4.54 4.54 SHINDE Digitally signed by SHINDE SACHIN BALAKRISHNA DN: c=IN, o=Personal, Yatish Digitally signed by Yatish 2.5.4.20=7b59065f4fa84deb224284 Shirishchandra Randeria SACHIN DN: c=IN, o=Personal, 6faa1c66969bde5390f6fb05b0ea0 2.5.4.20=467be74326f300aba080 3bda45f4cd62e, Shirishch 753ca05f41e4bf1e83372f9ea2347 3.60 2545b4747cd8c81, LL1 postalCode=400701, postalCode=400050, 3.60 BALAKRIS andra st=Maharashtra, st=MAHARASHTRA, LL1 serialNumber=a86ecc52f6867d25a serialNumber=2d42aad0dac27f09 4c507a3cc1b035ee9669670b59d 142df98c8f6cc611aef0f, 63b85a857ff60210a6a60137f0aa30 Randeria cn=Yatish Shirishchandra HNA Randeria 69cb6a4ec5ac04c39, cn=SHINDE 1.24 Date: 2021.03.30 16:04:05 +05'30' LL2 SACHIN BALAKRISHNA 1.24 LL2 Date: 2021.03.30 12:09:52 +05'30' 4.81 0.56 4.81 0.56 S.E. (B.P.) L/W A.E. (B.P.) L & N 21.72 0.42 21.07 LL3 A 21.72 0.42 21.07 LL3 A 3.00 3.00 0.82 0.82 2.86 D1 2.71 2.25 2.71 L2 1.50 1.50 2.86 STL2 2 D1 8 L2 2.25 1.50 1.50 8 STL2 2 0.45 0.15 1.19 1.05 2.31 ST2 2.03 0.45 2.03 0.15 1.19 1.05 2.31 ST2 2.25 4a 1.65 2.25 4a 1.65 3.50 1.00 3.50 1.00 ST3 6.35 ST3 6.35 4 4.85 4 4.85 STAMP OF DATE OF RECEIPT OF PLANS ST4 0.10 0.10 ST4 0.10 3.50 1.05 2.85 ST4 ST4 0.90 0.90 3.50 0.10 1.05 2.85 1.34 1.34 1.34 1.34 7 6 0.90 0.90 1.34 3 1.34 1.34 1.34 5 7 6 5 3 1.50 2.70 6.20 1.50 2.70 6.20 AREA LINE DIAGRAM OF TYPICAL FLOOR PLAN ( 5TH-14TH FLOOR ) AREA LINE DIAGRAM OF 15TH FLOOR PLAN SCALE 1:100 SCALE 1:100 37.36 A 37.36 A 16.20 6.50 14.66 16.20 6.50 14.66 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45 S.S. GLAZING S.S. B 0.45 S.S. GLAZING 0.15 0.45 S.S. S.S. S.S. B 0.45 S.S. 0.15 0.45 S.S. 0.45 0.45 0.45 0.45 TOILET 1.60 3.00 1.60 TOILET TOILET TOILET TOILET 1.60 3.00 1.60 TOILET 1.50 TOILET 1.50 TOILET 1.50X1.45 1.50X 1.50 DN 1.50X1.45 1.20X 1.20X 1.50X1.45 1.50X 1.50 DN 1.20X 1.45 6.20 1.85 1.85 ELEVATION FEATURE 1.45 6.20 1.85 ELEVATION FEATURE 3.35 3.35 1.50 M HIGH PARAPET WALL 0.35 IN ALUCOBOND 0.35 IN ALUCOBOND OFFICE 11 1.50 OFFICE 11 1.50 UP UP 9.33M X 6.23M OFFICE 3 9.33M X 6.23M OFFICE 3 FRD OFFICE 1 OFFICE 2 ~6.90M X 6.35M FRD ~6.90M X 6.35M 1.66 4.00M X 8.42M 0.60 1.66 0.60 OFFICE 12 4.15M X 8.42M OFFICE 12 6.57M X 8.42M LIFT 6.57M X 8.42M LIFT LIFT 2.25 LIFT 2.25 0.15 0.15 DESCRIPTION OF PROPOSAL & PROPERTY 0.60 2MX2.4M 2MX2.4M 0.60 2MX2.4M 2MX2.4M 11.78 11.78 11.43 11.43 PART TERRACE OPEN TO SKY PROPOSED BUILDING ON PROPERTY BEARING 1.50 1.50 1.50 1.50 C.T.S. NO - 4/2 OF PROPERTY , AT VILLAGE - MOHILI, C 4.81 C' C 4.81 TAL - KURLA ON SAKIVIHAR ROAD . KURLA ( W ) . C' LIFT LOBBY LIFT LOBBY 3.60 3.60 6.20M X 4.16M 6.20M X 4.16M FRD FRD FRD FRD FRD FRD OFFICE 10 FRD FRD FRD OFFICE 10 NAME OF OWNER 7.18M X 6.39M FRD 1.80M WIDE PASSAGE 1.24 0.42 0.56 1.80M WIDE PASSAGE FRD OFFICE 4 7.18M X 6.39M FRD 1.80M WIDE PASSAGE 1.24 0.42 0.56 1.80M WIDE PASSAGE FRD OFFICE 4 9.81 ~5.95M X 6.28M 9.81 ~5.95M X 6.28M 21.07 21.07 FRD FRD 1.50 1.50 FRD FRD FRD FRD FRD 1.50 1.50 FRD FRD FRD JATIN Digitally signed by JATIN VALJIBHAI 2.03 2.03 DAISARIA DN: c=IN, o=Personal, cn=JATIN F.D F.D VALJIBHAI DAISARIA, LIFT LIFT VALJIBHAI TOILET 2.25 TOILET 2.25 1.55 1.55 0.45 TOILET 0.45 TOILET serialNumber=84da8ed12e5762ccafcf68 1.50 0.45 1.45X 2MX2.3M 2.71 1.45X 1.50 0.45 1.45X 2MX2.3M 2.71 1.45X 10e6fe126f2b1cb330c278889dfda20b3c9 S.S. 1.50 E.D 1.50 S.S. S.S. 1.50 E.D 1.50 S.S. 372eebd, postalCode=400077, 1.19 1.19 2.5.4.20=966773efe18ed8542fc60ab4b35 DAISARIA 1.75 1.75 cb3ede4a5b4488173ca767e43f14ffd90b6 FRD FRD 01, st=Maharashtra Date: 2021.03.26 15:00:50 +05'30' 1.60 1.60 DN UP DN UP OFFICE 6 OFFICE 5 M/S. SKYBLU DEVELOPERS OFFICE 8 OFFICE 7 OFFICE 8 OFFICE 7 0.15 4.00M X 10.25M 4.15M X 10.25M 0.15 4.00M X 10.25M 4.15M X 10.25M SIGN.NAME & ADDRESS OF ARCHITECT 8.22M X 10.25M 8.22M X 10.25M OFFICE 9 3.00 6.50 OFFICE 5 OFFICE 9 3.00 6.50 OFFICE 5 8.39 8.39 6.20 6.20 9.33M X 7.84M 9.33M X 7.84M Digitally signed 8.15 8.15 ~10.25M X 7.84M ~10.25M X 7.84M MANOJ by MANOJ A S S O C I A T E S VALJIBHAI VALJIBHAI DAISARIA ARCHITECTURE I URBAN DESIGN I PROJECT MANAGEMENT I INTERIORS Web :- www.daisaria.com E-mail :- admin@daisaria.com SERV SERV TOILET TOILET 1.20X TOILET 1.50 TOILET 1.30X TOILET 1.20X TOILET 1.20X TOILET TOILET 1.20X TOILET 1.50 TOILET 1.30X TOILET 1.20X TOILET 1.20X DAISARIA Date: 2021.03.26 801, SKYLINE EPITOME, KIROL ROAD, 1.50X1.45 1.20X 3.35 1.50X1.45 1.20X 3.35 18:14:06 +05'30' NEAR JOLLY GYMKHANA, VIDYAVIHAR (WEST), 1.85 1.50 1.68 1.68 1.70 1.85 1.85 1.85 1.50 1.68 1.68 1.70 1.85 1.85 MUMBAI - 400086 TEL :- 022 - 61110504 1.50 1.50 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.15 0.15 M.V. DAISARIA S.S. S.S. S.S. S.S. S.S. S.S. S.S. S.S. NORTH LINE REMARKS JOB NO: 849 SCALE: AS SHOWN 7.98 1.50 5.82 0.15 6.20 1.05 0.15 7.98 1.50 5.82 0.15 6.20 1.05 0.15 DRG. NO: 04 DRAWN BY: Sonali B' 42.63 1.65 5.46 2.85 A' 10.12 B' 42.63 1.65 5.46 2.85 A' 10.12 AMENDED ELEVATION FEATURE 0.60 0.60 IN ALUCOBOND TYPICAL FLOOR PLAN ( 5TH,7TH, 9TH ,11TH &13TH ) ELEVATION FEATURE 15TH FLOOR PLAN DATE: 26.03.2021 CHK. BY: SANGAM IN ALUCOBOND \\Server\daisaria\02_Projects\849 - BATRA PROPERTIES ( SAKINAKA )\02_BMC\Option 3\03 Concession\28-01-2021_G+15PT PDF DRAFT CORRECTIONS | Batra Niwas _G+15 PART _Full FSI _26-03-2021 05/05 1.50 1.50 1.50 0.15 1.50 TERRACE OPEN TO SKY TERRACE OPEN TO SKY 1.50 TERRACE OPEN TO SKY Terrace Lvl. Terrace Lvl. VOID VOID Terrace Lvl. S.S S.S Terrace Floor Lvl. 2.05 OVER HEAD WATER TANK 3.65 3.65 3.65 3.50 3.65 3.50 VOID 3.65 OFFICE NO. 10 PASSAGE OFFICE NO. 4 2.81 0.15 4.48 15th Floor Lvl. TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 59.60 ( Total bldg. ht. ) 15th Floor Lvl. 15th Floor Lvl. VOID VOID 15th flr S.S S.S 15th Floor Lvl. LOBBY CURTAIN WALL REFUGE 58.10 ( ht. gr lvl to terrace slab ) 3.65 3.65 3.65 3.50 3.65 3.50 VOID 3.35 OFFICE NO. 10 PASSAGE OFFICE NO. 4 3.65 TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 0.15 14th Floor Lvl. 14th Floor Lvl. 14th Floor Lvl. VOID VOID 14th flr S.S S.S 14th Floor Lvl. LOBBY SERV TOILET 3.65 3.65 3.65 s.s. 3.65 3.50 3.50 PART SECTION D-D' VOID SCALE 1:100 OFFICE NO. 10 PASSAGE OFFICE NO. 4 TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 0.15 13th Floor Lvl. 13th Floor Lvl. 13th Floor Lvl. VOID VOID PROFORMA - B S.S S.S SERV REFUGE TOILET CONTENTS OF SHEET 3.65 3.65 3.65 s.s. 3.65 3.50 3.50 VOID OFFICE NO. 10 PASSAGE OFFICE NO. 4 SECTION AA ,SECTION B-B, SECTION C-C' TOILET OFFICE 3 TOILET LIFT LOBBY OFFICE 8 0.15 12th Floor Lvl. OFFICE 5 12th Floor Lvl. 12th Floor Lvl. PART SECTION DD VOID VOID S.S S.S SERV TOILET STAMP OF APPROVAL OF PLANS 3.65 3.65 3.65 s.s. 3.65 3.50 3.50 VOID OFFICE NO. 10 PASSAGE OFFICE NO. 4 TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 0.15 THIS CANCELS APPROVALS TO THE PREVIOUS PLANS 11th Floor Lvl. 11th Floor Lvl. 11th Floor Lvl. VOID VOID SANCTIONED UNDER NO.CHE/ES/5513/L/337/NEW S.S S.S SERV DATED 04-02-2020 REFUGE TOILET 3.20 3.20 s.s. 3.20 3.05 3.05 3.20 APPROVED SUBJECT TO CONDITIONS MENTIONED IN THIS CURTAIN VOID OFFICE LETTER NO: CHE/ES/5513/L/337/NEW TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 OFFICE NO. 10 PASSAGE OFFICE NO. 4 0.15 10th Floor Lvl. 10th Floor Lvl. WALL 10th Floor Lvl. VOID VOID S.S S.S Bajirao Digitally signed by Bajirao Lahu Patil SERV TOILET Lahu Patil Date: 2021.03.31 11:42:27 +05'30' 3.20 3.20 3.20 s.s. 3.20 3.05 3.05 EXECUTIVE ENGINEER BLDG. PROP - II VOID SHINDE Digitally signed by SHINDE SACHIN TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 OFFICE NO. 10 PASSAGE OFFICE NO. 4 BALAKRISHNA 0.15 9th Floor Lvl. 9th Floor Lvl. 9th Floor Lvl. DN: c=IN, o=Personal, VOID VOID 2.5.4.20=7b59065f4fa84deb22428 Yatish SACHIN Digitally signed by Yatish Shirishchandra Randeria S.S S.S 46faa1c66969bde5390f6fb05b0ea DN: c=IN, o=Personal, Shirishc 2.5.4.20=467be74326f300aba0807 03bda45f4cd62e, 53ca05f41e4bf1e83372f9ea234725 postalCode=400701, 45b4747cd8c81, BALAKRIS SERV st=MAHARASHTRA, postalCode=400050, handra st=Maharashtra, REFUGE TOILET serialNumber=a86ecc52f6867d25a serialNumber=2d42aad0dac27f094 3.20 c507a3cc1b035ee9669670b59d14 3.20 3.20 3.05 63b85a857ff60210a6a60137f0aa30 2df98c8f6cc611aef0f, cn=Yatish s.s. HNA Randeria Shirishchandra Randeria 3.05 69cb6a4ec5ac04c39, cn=SHINDE Date: 2021.03.30 16:04:18 +05'30' SACHIN BALAKRISHNA 3.20 VOID Date: 2021.03.30 12:10:05 +05'30' 8th Floor Lvl. TOILET OFFICE 3 OFFICE 5 TOILET 8th Floor Lvl. LIFT LOBBY OFFICE 8 8th Floor Lvl. OFFICE NO. 10 0.15 PASSAGE OFFICE NO. 4 S.E. (B.P.) L/W A.E. (B.P.) L & N VOID VOID 59.60 S.S S.S 59.60 59.60 SERV 58.10 58.10 TOILET 58.10 3.20 3.20 3.20 s.s. 3.20 3.05 3.05 VOID 7th Floor Lvl. TOILET OFFICE 3 OFFICE 5 TOILET LIFT LOBBY OFFICE 8 OFFICE NO. 10 PASSAGE OFFICE NO. 4 7th Floor Lvl. 7th Floor Lvl. 0.15 VOID VOID 52.92 S.S S.S SERV REFUGE 3.35 TOILET 3.20 3.20 s.s. 3.20 3.05 3.20 CURTAIN VOID 6th Floor Lvl. TOILET OFFICE 3 OFFICE 5 TOILET WALL LIFT LOBBY OFFICE 8 OFFICE NO. 10 PASSAGE OFFICE NO. 4 6th Floor Lvl. 6th Floor Lvl. 0.15 VOID VOID S.S S.S 45.62 SERV 3.20 3.20 3.20 3.05 s.s. 3.20 3.20 VOID STAMP OF DATE OF RECEIPT OF PLANS 5th Floor Lvl. TOILET OFFICE 3 OFFICE 5 TOILET 5th Floor Lvl. LIFT LOBBY OFFICE 8 OFFICE NO. 10 PASSAGE OFFICE NO. 4 5th Floor Lvl. 0.15 s.s. VOID s.s. SERV 38.33 STACK CAR TOILET TOILET STACK CAR PARKING 4.20 4.20 4.20 s.s. 4.20 PARKING 4.05 4.05 CURTAIN WALL 4th Floor (Parking)Lvl. DRIVEWAY 4th Floor (Parking)Lvl. DRIVEWAY STACK PARKING 4th Floor (Parking)Lvl. DRIVEWAY DRIVEWAY 0.15 s.s. VOID 31.93 s.s. SERV STACK CAR STACK CAR TOILET PARKING s.s. PARKING 4.20 4.20 4.20 4.20 4.05 4.05 L L 25.52 I I 3rd Floor (Parking) Lvl. DRIVEWAY F DRIVEWAY F STACK PARKING DRIVEWAY DRIVEWAY DRIVEWAY 0.15 3rd Floor (Parking) Lvl. 3rd Floor (Parking) Lvl. T T s.s. Car Lift s.s. SERV S S TOILET H H 3.65 3.65 3.65 s.s. 3.65 3.50 A 3.50 A F F CURTAIN PASSAGE OFFICE NO. 4 TOI T T OFFICE 2 WALL LIFT LOBBY OFFICE 8 OFFICE NO. 10 0.15 2nd Floor Lvl. 2nd Floor Lvl. 2nd Floor Lvl. s.s. s.s. SERV TOILET VOID s.s. DESCRIPTION OF PROPOSAL & PROPERTY 3.65 3.65 3.65 3.65 3.50 3.50 CURTAIN WALL PROPOSED BUILDING ON PROPERTY BEARING OFFICE 2 TOI OFFICE 1st Floor Lvl. 1st Floor Lvl. LIFT LOBBY SHOW ROOM 1st Floor Lvl. SHOP 2 0.15 C.T.S. NO - 4/2 OF PROPERTY , AT VILLAGE - MOHILI, s.s. s.s. s.s. TAL - KURLA ON SAKIVIHAR ROAD . KURLA ( W ) . 8.30 4.35 4.35 4.35 4.35 4.20 NAME OF OWNER 4.20 4.35 1.00 VOID 0.30 Amenity PumpRoom 1.50 1.50 13.40M. JATIN Digitally signed by JATIN VALJIBHAI ENTRANCE LOBBY SHOP 2 ENTRANCE LOBBY AMENITY 1.50 SHOW ROOM 1.50 0.15 Plinth.Lvl. Plinth Lvl. TOILET Plinth. Lvl. WIDE DAISARIA GROUND LVL. 27.45m. 0.30 ROAD DN: c=IN, o=Personal, cn=JATIN VALJIBHAI Ground Lvl. Ground Lvl. Ground Lvl. Wide Road lvl DAISARIA, 1.60 VALJIBHAI Road Lvl serialNumber=84da8ed12e5762ccafcf6810 e6fe126f2b1cb330c278889dfda20b3c9372 eebd, postalCode=400077, 2.5.4.20=966773efe18ed8542fc60ab4b35cb 4.50 4.65 4.65 4.50 4.35 4.05 4.05 4.50 4.50 4.65 DAISARIA 3ede4a5b4488173ca767e43f14ffd90b601, st=Maharashtra Date: 2021.03.26 15:01:06 +05'30' 2.75 SMOKE STACK CAR M/S. SKYBLU DEVELOPERS Basement 1 Driveway CHECK PARKING PUMP ROOM BASEMENT 1 0.15 DRIVEWAY Basement 1 8.70 DRIVEWAY LOBBY Basement 1 SIGN.NAME & ADDRESS OF ARCHITECT 8.40 MANOJ Digitally A S S O C I A T E S signed by 4.35 4.35 4.20 4.35 4.20 4.20 4.35 MANOJ VALJIBHAI ARCHITECTURE I URBAN DESIGN I PROJECT MANAGEMENT I INTERIORS Car Lift 4.20 VALJIBHAI DAISARIA Web :- www.daisaria.com E-mail :- admin@daisaria.com 801, SKYLINE EPITOME, KIROL ROAD, Date: 2021.03.26 NEAR JOLLY GYMKHANA, VIDYAVIHAR (WEST), TRIPLE STACK SMOKE TRIPLE STACK 6.85 DAISARIA 18:14:37 +05'30' MUMBAI - 400086 Basement 2 Driveway PARKING Basement 2 DRIVEWAY CHECK LOBBY PARKING Basement 2 SPACE FOR SERVICES BASEMENT 2 TEL :- 022 - 61110504 M.V. DAISARIA JOB NO: 849 SCALE: AS SHOWN 1.65 NORTH LINE REMARKS Car Lift Pit 2.50 2.50 Section AA' SECTION B-B' SECTION : C-C' DRG. NO: 05 DRAWN BY: Sonali SCALE 1:100 AMENDED SCALE 1:100 SCALE 1:100 DATE: 26.03.2021 CHK. BY: SANGAM \\Server\daisaria\02_Projects\849 - BATRA PROPERTIES ( SAKINAKA )\02_BMC\Option 3\03 Concession\28-01-2021_G+15PT PDF DRAFT CORRECTIONS | Batra Niwas _G+15 PART _Full FSI _26-03-2021