Ref.No. CHE/WS/5048/K/E/337(NEW) Date : 08-09-2021 FORM-1 To, Nivara Infra Developers LLP, C.A. to Deepanjali CHS Ltd., 1-2, Ground floor, Neeta, “C” Wing, Tejpal Scheme Road No.5, Vile Parle (E), Mumbai 400 057. Sub : Certificate of Percentage of Completion of Construction Work of Proposed Building 1 known as “Deepanjali CHS Ltd.” of the Phase of the Project [Maha RERA Registration Number to be obtained] situated on the Plot bearing C.T.S. No.252/6 demarcated by its boundaries, Laxmi Krupa CHS Ltd. to the North, Internal Road to the South, Devangini CHS Ltd. to the East, Ketayu Mansion CHS Ltd. to the West, Village Vile Parle (East), Taluka Andheri, Mumbai Suburban District, PIN : 400 057, Plot area admeasuring 1875.50 sq. mts. being developed by Nivara Infra Developers LLP, C.A. to Deepanjali CHS Ltd. Sir, I, Shoaib Z. Shaikh of M/S. Arch Dimensions, undertaken assignment as Architect certifying Percentage of Completion of Construction work of the project, situated on Plot bearing C.T.S. No.252/6, Village Vile Parle (East), Taluka Andheri, Mumbai Suburban District, PIN : 400 057, Plot area admeasuring 1875.70 sq. mts. being developed by Nivara Infra Developers LLP, C.A. to Deepanjali CHS Ltd. Following technical professionals are appointed by Owner / Promoter:- (i) Shri Shoaib Z. Shaikh of M/S. Arch dimensions as Architect:- (ii) Shri Raosaheb D. MAGDUM as Structural Consultant (iii) Shri Zahiruddin M. Shaikh as Site Supervisor Based on Site Inspection, with respect to the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project for registration of [Maha RERA Registration Number to be obtained] is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A (DEEPANJALI C.H.S. LTD. Of M/S. NIVARA INFRA DEVELOPERS LLP C.A. TO DEEPANJALI C.H.S. LTD. Sr. No. Tasks / Activity Percentage of work done 1. Excavation 100% 2. Number of Basement(s) and Plinth Nil 3. Number of Podiums Nil 4. Stilt Floor Plinth completed on site ( i.e. 0.15 Mt. AGL) 5. 9 Number of Slabs of Super Structure Top of 8th floor (i.e. terrace slab ) 100% 6. Internal walls, Internal Plaster, Flooring 80% within Flats / Premises, Doors and Windows to each of the Flats / Premises 7. Sanitary fittings within the Flats / 60% Premises, Electrical fittings within the Flats / Premises 8. Staircases, Lifts wells and lobbies at 40% each floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external 50% plaster, elevation, completion of terraces with waterproofing of the Building / Wing 10. Installation of lifts, water pumps, Fire Nil Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to common areas, electro mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation Certificate TABLE B Internal & External Development Works in respect of the entire Registered Phase Sr. Common areas & Proposed Percentage Details No. Facilities, Amenities YES / NO. of Work done 1. Internal Roads & Existing Footpaths 2. Water Supply Existing 3. Sewerage (Chamber, Existing 60% lines, Septic Tank, STP) 4. Storm Water Drains Will be done 50% 5. Landscaping & Tree Will be done Nil Planting 6. Street Lighting Existing 7. Community Buildings N.A. 8. Treatment and disposal N.A. of sewage and sullage water 9. Solid Waste Management Will be done & Disposal 10. Water conservation, Rain Will be done Water harvesting 11. Energy Management Will be done 12. Fire protection and fire Will be done safety requirements 13. Electrical meter room, Will be done sub-station, receiving station 14. Others (Option to Add Will be done more) Thanking you, Yours faithfully, SHOAIB AHMAD Digitally signed by SHOAIB AHMAD ZIYAUDDIN SHAIKH ZIYAUDDIN SHAIKH Date: 2021.09.13 11:40:34 +05'30' Shoaib Z. Shaikh of M/S. Arch Dimensions (CA/12/54870)