+91 7738750063 2 parnavibassociates@gmail.com Shreerang Society Thane PBASSOCIATES Ar. Parnavi Banga Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 30/09/2023) To, Alag Property Constructions Pvt. Ltd., 6, Bps Plaza, Devidayal Road, Near Bus Depot, Mulund (West), Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction work as on 30/09/2023 of Alag Capital having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Sir, IWe PB Associates have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction work of Alag Capital the building having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Based on Site Inspection, with respect to Layoutleach of the Building Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA is as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 101 772A750nA3 +91 7738750063 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar 31ADIHS Table AA Building1A Sr.No TasklActivity Percentage oldv anoioeof Work Done (30/09/2023) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NAoata 3. Number of Plinth 60% 4 Number of Podium 20% 5 Stilt Floor 40% 6 Slabs of Super Structure o0% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8. Sanitary Fittings within the Flat/Premises.anut os 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water tanks. 0% The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall protection and allother requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 e parnavibassociates@gmail.com Shreerang Society Thane PBASSOCIATES Ar. Parnavi Bangar Table A Building 1B Sr.No Task/Activity Percentage of Work Done (30/09/2023) (1) (2) (3) 1 Excavation 100% 2 Number of Basement(s) NA 3. Number of Plinth odn 55% 4. Number of Podium 20% 5 Stilt Floor nlbo50% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8 Sanitary Fittings within the Flat/Premises. eew 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOG, finishing ta entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/VWing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 2 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. ParnaviBangar Table A Building 1C Sr.No Task/Activity Percentage of Work Done (30/09/2023) (1) (2) (3) 1 Excavation d 100% 2 Number of Basement(s) NA 3 Number of Plinth 45% 4. Number of Podium NA 5 Stilt Floor 100% 6 Slabs of Super Structure 55% 7. Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8 Sanitary Fittings within the Flat/Premises.et0% 9 Staircases,Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% Building/Wing. +91 7738750063 e parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/VWing,Compound Wallprotection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) for (Alag Capital) Sr. Common areas and Facilities, Proposed Percentage of No Work Done Details Amenities (Yes/No) (30/09/2023) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No NA 2. Water Supply Yes 0% From M.C.G.M. 3. |Sewerage (chamber, lines, Yes 0% From M.C.G.M. Septic Tank, STP) Yes 4. Storm Water Drains 0% As Per SWC NOC. 5. Yes Landscaping &Tree Planting As Per Tree NOC 6. Street Lighting No NA 7. Community Buildings No NA 8. |Treatment and disposal of No NA sewage and sullage water. Yes Solid Waste Management & 50% As Per SWC NOC Disposal +91 7738750063 e parnavibassociates@gmail.com s Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Yes 10. Water Conversation &Rain 0% Water Harvesting 11. Energy Management No NA Yes 12. Fire Protection and fire safety 0% As Per CFO NOC requirements Yes 13. Electrical metre room, 0% sub-station, receiving station. Shreerang Society Thane 7738750063 +91parnavibassociates@gmail.com Ltd. Pvt. Constructions by: Signature ofPromoter AsSOciPaBtesparnavibasocialesgmail.eon accepted Property and Agreed AlagDate: BangSoaParcrien4t8hry0aArev67ir0WeC-.a13sntT8g0h71a5,nN0eo.63 64) CA/2023/1551 ASSOCIATES PB Ar. Parnavi Bangar BANGAR PARNAVI AR. wai Faithfully, Yours - No (License