parnavibassociates@gmail.com Shreerang Society Thane ( PB ASSOCIATES Ar. Parnavi Bangar Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 30/09/2024) To, M/s. Alag Property Constructions Pvt. Ltd., 6, Bps Plaza, Devidayal Road, Near Bus Depot, Mulund (West), Mumbai- 400080 Subject: Certificate of Percentage of Completion of Construction work as on 30/09/2024 of Alag Capital having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Sir, IWe PB Associates have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction work of Alag Capital the building having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Based on Site Inspection, with respect to Layouteach of the Building Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA is as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A parnavibassociates@gmail.com Shreerang Society Thane ( PB ASSOCIATES Ar. Parnavi Bangar Building 1A Sr.No Task/Activity Percentage of Work Done (30/09/2024) (1) (2) (3) 1 Excavation 100% 2. Number of Basement(s) NA Number of Plinth 100% 4 Number of Podium 50% 5 Stilt Floor 100% 6 Slabs of Super Structure 0% 7. Internal walls, Internal Plaster Floorings, Doors and 0% Windows within Flat/Premises 8 Sanitary Fittings within the Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingMWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% BuildingWing, Compound Wall protection and allother requirements as may be required to complete project as per specification in agreement of sale. Any other activities. Table A parnavibassociates@gmail.coms Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Building 1B Sr.No Task/Activity Percentage of Work Done (30/09/2024) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 100% 4. Number of Podium 50% 5. Stilt Floor 100% 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster Floorings, Doors and 0% Windows within Flat/Premises 8. Sanitary Fittings within the Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level 0% 9. Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. Table A parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Building 1C Sr.No Task/Activity Percentage of Work Done (30/09/2024) (1) (2) (3) 1. Excavation 100% 2 Number of Basement(s) NA 3 Number of Plinth 100% 4 Number of Podium NA 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within FlatPremises 20% 8 Sanitary Fittings within the Flat/Premises. e 0% Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing oft h e 0 % BuildingWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOG, finishing to entrance lobby/s, 11. plinth protection, paving of areas apputenant to 0% BuildingWing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. TABLE-B Common Area (Internal and External Development Works) for parnavibassociates@gmail.com Shreerang Society Thane ( PBASSOCIATES Ar. Parnavi Bangar (Alag Capital) Sr. Common areas and Proposed Percentage of Detail No Work Done Facilities, Amenities (Yes/No) (30/09/2024) (1) (2) (3) (4) (5) 1. |Internal Roads & Footpaths No NA 2. Water Supply Yes 0% From M.C.G.M. 3. Sewerage (chamber, lines, Yes 0% From M.C.G.M. |Septic Tank, STP) 4. Storm NWater Drains Yes 0% As Per SWC NOCc. 5. Landscaping &Tree Planting Yes As Per Tree NOC 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment and disposal of No NA sewage and sullage water. Solid Waste Management & Yes 50% As Per SWC NOC Disposal Water Conversation & Rain Yes 10. 0% Water Harvesting 11. Energy Management No NA Fire Protection and fire Yes 12. 0% As Per CFO NOC safety requirements Electrical metre room, Yes 13. sub-station, receiving 0% station. Yours Faithfully,P BAssociates Agreed and Accepted by: Ar. Parnav B ia n g a r C-10 S1l. r e e r aS nogr i e t y Than W e es 4t0 0 6 0 1 parnavibassociatesgmail.con 7738750063 No. AR. PARNAVIBANGAR Signature of Promoter (License No - CA/2023/1 55164) Alag Property Constructions Pvt. Ltd. Date: