+91 7738750063 parnavibassociates@gmail.com Shreerang Society Thane G PB ASSOCIATES Ar. Parnavi Bangar Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 31/12/2024) To, Alag Property Constructions Pvt. Ltd., 6, Bps Plaza, Devidayal Road, Near Bus Depot, Mulund (West), Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction work as on 31/12/2024 of Alag Capital having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Sir, IWe PB Associates have undertaken assignment as Architects/Licensed Surveyor of certifying Percentage of Completion of Construction work of Alag Capital the building having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Based on Site Inspection, with respect to Layouteach of the Building Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under MahaRERA is as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. T7TJ0TJUUO parnavibassociates@gmail.com s Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Table A Building 1A Sr.No Task/Activity Percentage of Work Done (31/12/2024) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 100% 4. Number of Podium 60% 5. Stilt Floor 100% 6. Slabs of Super Structure 0% 7. Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8. Sanitary Fittings within the Flat/Premises. 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 e parnavibassociates@gmail.com Shreerang Society Thane G PB ASSCOCIATES Ar. Parnavi Bangar Table A Building 1B Sr.No Task/Activity Percentage of Work Done (31/12/2024) (1) (2) (3) 1 Excavation 100% 2 Number of Basement(s) NA 3 Number of Plinth 100% 4 Number of Podium 50% 5. Stilt Floor 100% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8 Sanitary Fittings within the Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/VWing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 2 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Table A Building 1C Sr.No Task/Activity Percentage of Work Done (31/12/2024) (1) (2) (3) 1 Excavation 100% 2 Number of Basement(s) NA 3 Number of Plinth 100% 4 Number of Podium NA 5. Stilt Floor 100% Slabs of Super Structure 100% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 30% 8 Sanitary Fittings within the Flat/Premises. 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% BuildingWing, Compound Wall protection and allother requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 2 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar TABLE-B Common Area (Internal and External Development Works) for (Alag Capital) Sr. Common areas and Proposed Percentage of Detail No Work Done Facilities, Amenities (Yes/No) (31/12/2024) (1) (2) (3) (4) (5) 1. Internal Roads &Footpaths No NA 2. Water Supply Yes 0% From M.C.G.M. 3. Sewerage (chambe, lines, Yes 0% From M.C.G.M. Septic Tank, STP) 4. Storm Water Drains Yes 0% |As Per SWC NOC. 5. Landscaping &Tree Planting Yes 0 As Per Tree NOC 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment and disposal of No NA sewage and sullage water. 9 Solid Waste Management & Yes 50% Disposal As Per SWC NOC |Water Conversation & Rain Yes 10. 0% Water Harvesting 11. Energy Management No NA 12. Fire Protection and fire Yes 0% As Per CFO NOC Jsafety requirements Electrical metre room, Yes 13. sub-station, receiving 0% station. +91 7738750063 e parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Yours Faithfully. Agreed and accepted by: PBAssociates Ar.ParnaviBangar C-101, Shreerang Soeiety ThaneWest400601 No.7738750063 parnavibassocintesDgmail.eon AR. PARNAVI BANGAR Signature of Promoter (License No - CA/2023/1551 64) Alag Property Constructions Pvt. Ltd. Date: