+91 7738750063 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar.Parnavi Bangar Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 30/06/2024) To, Alag Property Constructions Pvt. Ltd., 6, Bps Plaza, Devidayal Road, Near Bus Depot, Mulund (West), Mumbai - 400080 Subject: Certificate of Percentage of Completion of Construction work as on 30/06/2024 of Alag Capital having MahaRERA Registration Number: P51800020773 being developed byAlag Property Constructions Pvt. Ltd. Sir, bEeodeloololesoe IWe PB Associates have undertaken assignment as Architects/Licensed Surveyor of certiftying Percentage of Completion of Construction work of Alag Capital the building having MahaRERA Registration Number: P51800020773 being developed by Alag Property Constructions Pvt. Ltd. Based on Site Inspection, with respect to Layout/each of the Building Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA 0s as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Table A aAOI Building 1A Sr.No Task/Activity Percentage of Work Done (30/06/2024) (1) (2) (3) 100% 1. Excavation Number of Basement(s) NA 2. 3. Number of Plinth 90% Number of Podium 45% 4. 5. Stilt Floor 80% Slabs of Super Structure 0% 6. Internal walls, Internal Plaster Floorings, Doors and 7. Windows within Flat/Premises 0% 8 Sanitary Fittings within the Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingMWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant to 0% Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +9]7738750063 e parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar.Parnavi Bangar Table A Building 1B Sr.No Task/Activity Percentage of Work Done (30/06/2024) (1) (2) (3) 1 Excavation 100% 2 Number of Basement(s) NA 3 Number of Plinth 90% 4 Number of Podium 45% 5 Stilt Floor 90% 6 Slabs of Super Structure 0% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 0% 8. Sanitary Fittings within the Flat/Premises.shnirt 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level 0 Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingWing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditionso f e environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant topei 0% Building/VWing, Compound Wallprotection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +917738750063 e parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. ParnaviBangar Table A Building 1C Sr.No Task/Activity Percentage of Work Done (30/06/2024) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) NA 3. Number of Plinth 80% 4. Number of Podium NA 5 Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises n t e10% 8. Sanitary Fittings within the Flat/Premises. 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level 0% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 0% BuildingWing. Installation of lifts, water pumps, Fire Fighting Fitings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, finishing to entrance lobby/s, 11. plinth protection, paving of areas appurtenant t o n e 0% Building/Wing, Compound Wall protection and all other requirements as may be required to complete project as per specification in agreement of sale. Any other activities. +91 7738750063 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar TABLE-B Common Area (Internal and External Development Works) for (Alag Capital) Sr. Common areas and Proposed Percentage of Detail No Work Done Facilities, Amenities (Yes/No) (30/06/2024) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths No NA 2. Water Supply Yes 0% From M.C.G.M. 3 Sewerage (chamber, lines, Yes 0% From M.C.G.M. Septic Tank, STP) 4. Storm Water Drains Yes 0% As Per SWC NOC. 5. |Landscaping &Tree Planting Yes As Per Tree NOC 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment and disposal of No NA |sewage and sullage water. 9. Solid Waste Management & Yes 50% As Per SWC NOC Disposal Yes 10. Water Conversation & Rain 0% Water Harvesting 11. Energy Management No NA Yes 12. Fire Protection and fire 0% As Per CFO NOC safety requirements Electrical metre room, Yes 13. sub-station, receiving 0% station. +91 7738750063 2 parnavibassociates@gmail.com Shreerang Society Thane PB ASSOCIATES Ar. Parnavi Bangar Yours Faithfully, Agreed and accepted by: PBAssociates Ar.Parnavi Bangar C-101. Shreerang Soeiety Thane West 400601 No.7738750063 parnavibassociates@gmail.eon AR. PARNAVI BANGAR Signature of Promoter (License No - CA/2023/155164) Alag Property Constructions Pvt. Ltd. Date: