BHAGWAN SHIVRAM INGOLE Bhoomi Heights, "8" Wing, Flat No. 801, Plot No. I & 10, Sector 31, Kamothe, Navi Mumbai - 410209 Mob:9867070976 FORM.2 [sec Regulation 3] ENCINEER'S CERTIFI('ATE (To be submitted at the time of Registration ofOngoing project and for withdrarval of Money from Designated Accoutrt- project wise) Date:10.09.2019 To, Alag Property Constructions Pyt Ltd. Shop No. 6, BPS Plaza, Devidayal Road. Mulund (West), Mumbai- 400080. subjecti certificate of cost Incurred for Development of Kanta - surcndra co-op Hsg soc. Ltd. for construction of 3 buildings, situated on the Plot bearing crs No. 66u2 of village Nahur, at Hira Nagar, Goregaon - Mulund Link Road, Mulund (West), Mumbai _ 4000g0, admeasuring 4010.g0 sq, mtrs trea being developed by Alag Propert], Constructions pvt. Ltd., demarcated by ils boundaries (latitude .nd longitude of the end points) to the North r (19.161838) (72.945499), Norrh 2 (19.161839) (72.91s706), North 3 (19.161632) (72.945681), North 4 (r9.16rs78) (i2.g1si3\, North (19.161317) 5 (72.9162951, to rhe South I (19.t60964) (72.9,16093), South 2 (19.t6t297) (72.945.1t I ), to rhc Easr I (19.161315) (72.916295), Easr 2 (19.160962) (72.946098), ro the West I (l9.l6t-i09) (72.945406), West 2 (19.161425) (72.945423), west 3 (l9.r6l{73) (72.945453), Wes. 4 (r9.161882) (72.945499). Sir. I, Bhagwan shivram Ingole, have urdertaken assignment of certifying Estimated cost for the subject Real Estate Project registered under MahaRERA, being 3 buildings, situated on the plot bearing CTS No. 661/2 of Village Nahur. at Hira Nagar, Goregaon - Mulund Link Road, Mulund (West), Mumbai _ 4000g0, admeasuring 4010.80 sq. mtrs area being developed by Alag property Constructions p!,1. Ltd. , demarcated by its boundaries (latitude and longitude ofrhe end points) (19.161839) ('t2,94si06), Norrh 3 (19.161632) (i2.s4,6.t), to the ttoitt 1tS.tOtt:ty 172.945499), Notth 2 Nonh 4 (l9.l6ls7s) (72.94573), North 5 (19.161317) (72.946295), to the south 1 (1s.160964) Q2.9460q:), sou*r ) (rs.rorz97) (72.94541 l), to the East 1 (r9.t61315) (72.946295), East 2 (19.r60962) (72.9a60g8\, to *," w"rt r (19.161309) (72.945406), west 2 (19.16142s) (72.945423), Wesr 3 (19 .t6t473) (i2.945453), W".t e (rq.rortrZl f 72.g4i4gg\. u#-^ BHAGWAN SHIVRAM INGOLE Bhoomi Heights, "8" Wing, Flat No. 801, Plot No. I & 10, Sector 31, Kamothe, Navi Mumbai 410209 Mob: 9867070976 1. Following technical professionals are appointed by Owner / promoter a) Shri Sunil R. Deole as Architecti b) Shri Bhavin C. Shah as Structural Consultant; c) lws. C&c Building Consultancy p\.'t Ltd as l4Ep Consultant; d) Shd Suyash S. Belekar as Sire Supervisor we have estimated the cost of the completion to obtain occupation certificate/ completion certificate. ofthe civil, MEP and Allied works, ofthe Buirding(s) of the project. our estimated cost calculations are based on the Drawingvplans made availabre to us for the project under reference by the Developer and consultatrts and the schedule of items and quantity for the entire work as calculated by Suyash S. Belekar - Site supervisor appointed by Developer/Engineer, and the assumption ofthe cost of material. labour and other i[puts made by Developer, and the site inspection caried out by us. we estimate Total Estimated Cost of completion of the buirding(s) of the aforesaid project under rcference as Rs.50,00,00,000/- (Rupees Fifty Crores Only). The €stimated Total Cost of project is with reference to the Civil. MEP and arlied works required to be completed for obtaining occupation certificate / completion certificate for the building(s) ftom the MCGM being the planning Authority undcr whosejudsdiction the aforesaid project is being implemenred. .l The Estimated cost Incuned tirr date is calculated at Rs. 19,67,320/- (Rupees Nineteen Lakhs sixty Seven Thousand rhree Hundred rwenty only). The amount of Estimated cost Incuned is carcuraled on the base ofamount ofTotal Estimated Cost. 5 The Balance cost of completion of the civil, MEp and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate Aom MCGM (planning Authority) is estimated at Rs.49.80,32.680/- (Rupees Forty Nine Crores Eighty Lakhs Thirty T\vo Thousand Six Hundred Eighty Only). 6. I certiry that the cost of the civir, MEp and allied work for the aforesaid project as completed on the date ofthis cenificare is as given in Table A below: BHAGWAN S HIVRAM INGOLE Bhoomi Heights, '.8., Wing, Flar No. 801, Plot No. I & 10, Sector 31, Kamothe, Navi Mumbai 410209 - Mob:9867070976 Table A Project Called "Alag Capital" Sr. No I'nrticulars Amount Total Estimated Cost ofBuildingV Wings as on Date of Registration is Rs. 50,00,00.000/- Cost Incurred as on Date (Based on Estimated Cost) Rs. 19,67,320/- Work Done in Percentage (As Percentage ofEstimated Cost) o.39yo Balance Cosl to be Incurred 4 Rs. 49,80,32,6801 (Based on Estimated Cost) Cost incurred on Additional,Extra Items as on Date of Registration not included in the estimated Cost (Annexure A) N.A. Yours Failhfullv- 'Nl w Name & ffiature of Engineer BHAGWANI SHI VRAM INGOLE Bhoomi Heights, ..B', Wing, Flat No. 801, Plot No. I & 10, Sector 31, Kamothe, Navi Mumbai 410209 Mob:98670i09i6 Note I The scope of work is to complete entire Real Enate project as per drawings approved from time to time so as to oblain Occupation Certificate /Completion Cenihcate. 2. c) Quantity su*ey can be done by office of Engineer or can be done by an independent euantir Surveyor, whose certificate of quantity calculated can be relied upon by rhe fngin".r- fn iur.'o'd independent quantity surveyor being appointed by Deveroper, the name murt be merr'ioned at the prace marked f) and in case quantity are being calculated by office ofEngineer, the name ofthe person in the oftice of.Engineer, who is responsible for the quantity calcurateJ shourd be mentioned at the place marked (+). 3. The estimated cost hcludes all labor, materiar, equipment, and machinery required to carry out entirei rr,ork 4. As this is an estimated cost, any deviation in quantity required for deveropmenr of the Real estate project will result in amendment ofthe cost incurred_/to be incunid. 5. All components ofwork with specifications are indicative and not exhaustjve. I