346 Form ------------ in replying please quote No. 88 and date of this letter. Intimation of Disapproval under Section 346 of the Mumbai Municipal Corporation Act, as amended up to date. No. CHE/WS/2077/H/W/337(NEW) MEMORANDUM Municipal Office, Mumbai To, PTR UNIVERSAL (PARTNER) ROHIT RAJPAL (CA TO OWNER, MAHESHWAR SHIKHAR CHSL) M/S PTR UNIVERSAL 406 4TH FLOOR,LA MAGASIN, NEAR PODAR SCHOOL, SANTACRUZ(W) With reference to your Notice 337 (New) , letter No. 2197 dated. 7/4/2017 and the plans, Sections Specifications and description and further particulars and details of your buildings at Proposed Redevelopment of Residential building known as Maheshwar Shikhar CHSL on plot bearing CTS No.G/231F.P. NO.29, Corner of St. Andrews Road & Gujar Lane, Santacruz (West),Mumbai,, CTS NO.G/231 furnished to me under your letter, dated 7/4/2017. I have to inform you that, I cannot approve of the building or work proposed to be erected or executed, and I therefore hereby formally intimate to you, under Section 346 of the Mumbai Municipal Corporation Act as amended up to-date, my disapproval by reasons thereof :- A: CONDITIONS TO BE COMPILED WITH BEFORE STARTING THE WORK. 1 That the commencement certificate under section 44/69 (1)(a) of the M.R.T.P. Act will not be obtained before starting the proposed work. 2 That the compound wall is not constructed on all sides of the plot clear of the road widening line with foundation below level of bottom of road side drain without obstructing the flow of rain water from the adjoining holding to prove possession of holding as per D.C. Regulation No.38(27) before starting the work. 3 That the Registered Agreement with the existing tenant alongwith the list will not be submitted before C.C. 4 That the sanitary arrangement shall not be carried out as per Municipal specifications and drainage layout will not be submitted before C.C. 5 That the Registered Agreement with the existing tenant along with the list will not be submitted before C.C. 6 That the Indemnity Bond indemnifying the Corporation for damages, risks, accidents etc. and to the occupiers and an undertaking regarding no nuisance will not be submitted before C.C./starting the work. Page 1 of 12 No. CHE/WS/2077/H/W/337(NEW) work. 7 That the existing structure proposed to be demolished will not be demolished or necessary Phase Programme with agreement will not be submitted and got approved before C.C. 8 That the requirements of N.O.C. of (i) Reliance Energy /Tata Power, [ii] S.G. [iii] P.C.O., [iv] A.A. & C. [ H/West Ward], [v] S.P. [vi] S.W.D., [vii] H.E. will not be obtained and the requisitions if any will not be complied with before Commencement Certificate 9 That “All Dues Clearance Certificate” related to H.E.’s dept. from the concerned A.E.W.W. [H/West Ward] shall not be submitted before applying for C.C. 10 That the development charges as per M.R.T.P. (amendment) Act 1992 will not be paid. 11 That the registered undertaking in prescribed proforma agreeing to demolish the excess area if constructed beyond permissible FSI shall not be submitted before asking for C.C. 12 That the requisite premium as intimated will not be paid before applying for C.C. 13 That the registered undertaking shall not be submitted for payment of difference in premium paid and calculated as per revised land rates. 14 That the C.C. shall not be asked unless payment of advance for providing treatment at construction site to prevent epidemics like Dengue, Malaria, etc. is made to the Insecticide Officer of the concerned Ward Office and provision shall be made as and when required by the Insecticide Officer for inspection of water tanks by providing safe but stable ladder, etc. and requirements as communicated by the Insecticide Office shall not be complied with. 15 That the Janata Insurance Policy in the name of site or policy to cover the compensation claims arising out of workman's compensation Act 1923 will not be taken out before starting the work and also will not be renewed during the construction work. 16 That the soil investigation will not be done and report thereof will not be submitted with structural design. 17 That the phasewise programme for removal of the debris shall not be submitted and got approved. 18 That the registered undertaking for not misusing the part / pocket terraces / A.H.Us. and area claimed free of F.S.I. will not be submitted. 19 That the registered undertaking for water proofing of terrace and Nahani traps shall not be submitted. 20 That the owner/developer shall not display a board at site before starting the work giving the details such as name and address of the owner/developer, architect and structural engineer, approval no. and date of the layout and building proposal, date of issue of C.C., area of the plot, permissible built up area, built up area approved, number of floors etc. 21 That the design for Rain Water Harvesting System from Consultant as per Govt. notification under Sec.37[2] of MR&T.P. Act, 1966 under No.TPB-4307/396/CR-24/2007/UD-11 dt.6/6/2007 shall not be submitted. 22 That the authorized Pvt .Pest Control Agency to give anti malaria treatment shall not be appointed in consultation with P.C.O.[ H/West Ward ]. 23 That the debris removal deposit of Rs. 45,000/- or Rs. 2/- per sq.mtr. of the built up area, whichever is less will not be paid before further C.C. Page 2 of 12 No. CHE/WS/2077/H/W/337(NEW) 24 That the ‘Debris Management Plan’ shall not be got approved from Executive Engineer [Env.] and the conditions therein shall not be complied with. 25 That the N.O.C. from Collector – M.S.D. for excavation of land shall not be submitted. 26 That the labour welfare tax as per circular No. Dy.Ch.Eng/3663/BP (City) Dt. 30.9.2011 shall not be paid before asking for C.C. 27 The developer shall not submit the registered undertaking agreeing to comply with & follow all the rules, regulations, circulars, directives related to the safety of construction labors/workers, issued time to time by the department of building & other construction labours, Government of Maharashtra. 28 That the R.U.T. shall not be submitted by the developer stating that they will not take any objection in future for the development on adjoining plot with deficient open spaces and also condition will be incorporated about deficient open spaces of proposed bldg. in the sale agreement of flats. 29 That the Registered Undertaking stating that the conditions of E.E. (T & C) NOC shall not be complied with and to that effect the mechanized parking equipped with safety measures will be maintained permanently in safe condition to avoid any mishap and an indemnity bond indemnifying MCGM and its officers against any litigation, costs, damages, etc. arising out of failure of mechanized system /nuisance due to mechanized system to any person shall not be submitted. 30 That the RUT shall not be submitted by the developer to sell the tenements/flats on carpet area basis only and to abide by the provision of MOFA (Act) amended upto date and the I.B. indemnifying the MCGM and its employees from any legal complications arising due to MOFA, will be submitted. 31 That the R.U.T. shall not be submitted by the developer stating that fungible compensatory FSI for rehabilitation component shall not be used for sale component. 32 That the registered undertaking shall not be submitted for payment of difference for fungible, open space deficiency or any type of premium retrospectively as & when demanded by M.C.G.M. 33 That the RUT shall not be submitted stating that the difference of payment for additional 0.50% FSI shall be paid and calculated as per the revision of rates by the Government from time to time as per the condition No.5 mentioned in Notification and circular before requesting for C.C. 34 That the RUT shall not be submitted regarding any adverse clarification received from Government of Maharashtra in respect of condition No.7 of Govt. notification No.TPB-4308 /776/CR-127/2008/UD-11 dtd. 10.4.2008 and new Govt. notification dtd. 24.10.2011 i.e. regarding consent of society / occupants regarding utilization of 0.50 FSI on prorata basis. 35 That the letter from owner stating that they will accept the refund of additional 0.50% FSI premium paid, without claiming any interest thereon, if the development proposal is not approved / rejected by M.C.G.M. shall not be submitted. 36 That the demarcation of plot boundary carried out by C.S.L.R. and M.R. Plan to that effect shall not be submitted. 37 That all the structural members below the ground shall not be designed considering the effect of chlorinated water, sulphur water, seepage water, etc. and any other possible chemical effect and due care while constructing the same shall not be taken and completion certificate to that effect shall not be submitted from the Licensed Structural Engineer. 38 That the R.U.T. shall not be submitted by the owner/developer for maintaining the noise levels as per the norms of Pollution Control Board. 39 That the R.U.T. shall not be submitted for not misusing the additional parking proposed for full potential of F.S.I. and will count the same in FSI or will be handed over to M.C.G.M. free of cost, if the building is not constructed for full potential Page 3 of 12 No. CHE/WS/2077/H/W/337(NEW) potential of F.S.I. and will count the same in FSI or will be handed over to M.C.G.M. free of cost, if the building is not constructed for full potential 40 That the requisitions of clause 45 & 46 of DCR 91 shall not be complied with and records of quality of work, verification report, etc. shall not be maintained on site till completion of the entire work. 41 That the bore well shall not be constructed in consultation with H.E. 42 That the N.O.C. from E.E.[T&C] for parking layout in the basement / podium shall not be submitted. 43 That the work shall not be carried out between sunrise and sunset between 6.00 a.m to 10.00 p.m. only in accordance with Rule 54(3) of the Noise Pollution (Regulation & Control) Rules, 2000 and the provision of notification issued by Ministry of Environment and Forest department from time to time shall not be duly observed. 44 That the Board shall not be displayed showing details of proposed work, name of owner, developer, architect, R.C.C. consultant etc. 45 That the necessary deposit for hoarding or the flex of size m to m for the advertisement of proposal shall not be made by you. 46 That the dry and wet garbage shall not be separated and the wet garbage generated in the building shall not be treated separately on the same plot by the residents / occupants of the building in the jurisdiction of M.C.G.M.. The necessary condition in Sale Agreement to that effect shall not be incorporated by the Developer/Owner.” 47 That the copy of agreement either providing a permanent alternate accommodation in a newly constructed building or a settlement arrived at by and between the tenants and / or occupiers and the landlord in respect of the building under Section 354 of the M.M.C. Act is initiated is not submitted by the Owner/Developer before requesting for Plinth C.C. 48 That the revised C.F.O NOC shall not be submitted. B: FOR LABOUR CAMP / TEMPORARY SHED 1 That, the exact location of the Temporary Shed /Labour Camp at the premises situated on plot bearing C.T.S. No. G/231, F.P.No.29, Santacruz (West). Mumbai shall not be shown in the accompanying sketch of the proposed temporary shed/labour camp 2 That, the material for side and top covering used for the Temporary Shed/Labour Camp shall not be either tarpaulin of G.I.Sheets. 3 That this Temporary Shed /Labour Camp shall not be constructed in such a manner that the same can be easily removed after the expiry of the temporary permission. 4 That you shall do any sort to pucca or permanent construction of any nature on this temporary permission. 5 That the temporary shed shall not be constructed to the approved size and measurement and shall exceed the permitted area. 6 That you shall not pay the sum of Rs. 10,000/- ( in Words Rs.Ten Thousand Only)as a security deposit which may be forfeited in the extent of your failure to comply with any of the condition mentioned herein. 7 That you shall not pay the sum of Rs. 10,000/- ( in Words Rs.Ten Thousand Only) as deposit 8 That the permission shall not effective upto completion of the project. Page 4 of 12 No. CHE/WS/2077/H/W/337(NEW) 9 That you shall not intimate the Municipal authorities in writing immediately after the shed is removed by you on before the expiry date 10 That in case of your failure to remove the Temporary Shed /Labour Camp on or before the date of expiry, you will not allow Municipal authorities to remove the same at your risk and cost without notice and you will not allow the demolition charges to be recovered from the deposit paid for this purpose and the security deposit paid by you to be forfeited. 11 That you shall not pay fees at the rate of the Rs. /-per 10 Sq.Mts.area for the structure for the entire monsoon period or part thereof. 12 That you shall not pay the fees for the structure for the whole monsoon period or part thereof and so on. C: CONDITIONS TO BE COMPILED BEFORE FURTHER C.C 1 That the plinth/stilt height shall not be got checked by this office staff. 2 That the N.O.C. from A.A.&C. [H/West Ward] shall not be submitted. 3 That the Work Start Notice shall not be submitted. 4 That the plinth stability certificate from R.C.C. Consultant shall not be submitted. 5 All the payments as intimated by various departments of MCGM shall not be paid. 6 That the Material testing report shall not be submitted. 7 That the yearly progress report of the work will not be submitted by the Architect. 8 Civil Aviation NOC shall not be submitted before exceeding the height of building as mentioned in Table no. 13 of DCR 1991. 9 That the A.M.S.L. from GVK of the completed work upto plinth/stilt/podium level, as applicable, shall not be verified and submitted. 10 That the quality control for building work / for structural work / supervision of the work shall not be done and certificate to that effect shall not be submitted periodically in proforma. 11 That the amended remarks of concerned authorities/empanelled consultants for the approved plan, if differing from the plans submitted for remarks, shall not be submitted for :a) S.W.D, b) Parking, c) Roads, d) Sewerage, e) Water Works, f) Fire Fighting Provisions, g) Tree authority h), NOC from Electric Supply Company, i) Hydraulic Engineer, j) PCO. 12 That set back land free of compensation and free of any encumbrance shall not be handed over to and possession receipt shall not be submitted from Assistant Commissioner of the ward. 13 The reservations affecting land u/r shall not be handed over to MCGM. 14 That in the event setback and / or reservation is not handed over then at FCC, area equivalent to the area of Setback and / or reservation shall not be restricted till such area is handed over or as per circular issued from time to time. 15 That the separate P.R.C. in the name of M.C.G.M. for road set back/ D.P. Road / reservation in the layout shall not be submitted. D: GENERAL CONDITIONS TO BE COMPILED BEFORE O.C 1 That the low lying plot will not be filled up to a reduced level of at least 27.55 M Town Hall Datum or 0.15 m above adjoining road level whichever is higher with murum, earth, boulders etc. and will not be leveled, rolled, consolidated and sloped towards road side. Page 5 of 12 No. CHE/WS/2077/H/W/337(NEW) leveled, rolled, consolidated and sloped towards road side. 2 That Society Office permissible as per DCR before occupation for the building under reference shall not be constructed. 3 That Fitness Centre permissible as per DCR before occupation for the building under reference shall not be constructed.(if applicable) 4 That the dust bin will not be provided. 5 That 3.00 mt. wide paved pathway upto staircase will not be provided. 6 That the open spaces as per approval, parking spaces and terrace will not be kept open 7 That the name plate/board showing Plot No., Name of the Bldg. etc. will not be displayed at a prominent place. 8 That carriage entrance shall not be provided as per design of registered structural engineer and carriage entrance fee shall not be paid. 9 That terraces, sanitary blocks, nahanis in kitchen will not be made Water proof and same will not be provided by method of pounding and all sanitary connections will not be leak proof and smoke test will not be done in presence of licensed plumber . 10 That final N.O.C. from concerned authorities / empanelled consultants for a) S.W.D. , b) Parking , c) Roads, d) Sewerage, e) Water Works, f) CFO / Fire Fighting Provisions, g) Tree authority, h) Hydraulic Engineer, i) That the Lift Inspector’s Completion Certificate, shall not be submitted before occupation. 11 That Structural Engineer¿s laminated final Stability Certificate along with upto date License copy and R.C.C. design canvas plan shall not be submitted. 12 That the separate vertical drain pipe, soil pipe, with a separate gully trap, water main, O.H. Tank, etc. for Maternity Home/Nursing Home,user will not be provided and that drainage system or the residential part of the building will not be affected if applicable . 13 That Site Supervisor certificate for quality of work and completion of the work shall not be submitted in prescribed format. 14 That the water proofing certificate shall not be submitted. 15 That the N.O.C. from A.A. & C. [H/West Ward] shall not be submitted. 16 That the construction of road including S.W. Drain and footpath, providing central dividers, lane marking and providing street furniture and obtain completion certificate from E.E. [Roads]W.S. shall not be submitted before applying for occupation. 17 That the Energy Conservation Systems as stipulated vide circular under No.ChE/M&E/1063 dt.16/06/2008 shall not be complied with. 18 That the A.M.S.L. from GVK of completed work (top of building) shall not be verified and submitted. 19 That the betterment charges/ lucrative premium for town planning plots will not be paid in respective ward office and certificate/ receipt will not be submitted before O.C./B.C.C. 20 That the PRC of setback area name of MCGM shall not be submitted. ADDITIONAL CONDITIONS. 1 That the separate PR card for setback area in name of MCGM shall not be submitted before C.C. Page 6 of 12 No. CHE/WS/2077/H/W/337(NEW) ( ) That proper gutters and down pipes are not intended to be put to prevent water dropping from the leaves of the roof on the public street. ( ) That the drainage work generally is not intended to be executed in accordance with the Municipal requirements. Subject to your so modifying your intention as to obviate the before mentioned objections and meet by requirements, but not otherwise you will be at liberty to proceed with the said building or work at anytime before the day of but not so as to contrivance any of the provision of the said Act, as amended as aforesaid or any rule, regulations or bye-law made under that Act at the time In force. Your attention is drawn to the Special Instructions and Note accompanying this Intimation of Disapproval. Executive Engineer, Building Proposals, Zone, Wards. SPECIAL INSTRUCTIONS 1. THIS INTIMATION GIVES NO RIGHT TO BUILD UPON GROUND WHICH IS NOT YOUR PROPERTY. 2. Under Section 68 of the Bombay Municipal Corporation Act, as amended, the Municipal Commissioner for Greater Mumbai has empowered the City Engineer to exercise, perform and discharge the powers, duties and functions conferred and imposed upon and vested in the Commissioner by Section 346 of the said Act. 3. Under Byelaw, No. 8 of the Commissioner has fixed the following levels :- "Every person who shall erect as new domestic building shall cause the same to be built so that every part of the plinth shall be- a) Not less than, 2 feet (60 cms.) above the center of the adjoining street at the nearest point at which the drain from such building can be connected with the sewer than existing or thereafter to be- laid in such street b) Not less than 2 feet (60 cms.) Above every portion of the ground within 5 feet (160 cms.)-of such building. c) Not less than 92 ft. ([!TownHall]) above Town Hall Datum. 4. Your attention is invited to the provision of Section 152 of the Act whereby the person liable to pay property taxes is required to give notice of erection of a new building or occupation of building which has been vacant, to the Commissioner, within fifteen days of the completion or of the occupation whichever first occurs. Thus compliance with this provision is punishable under Section 471 of the Act irrespective of the fact that the valuation of the premises will be liable to be revised under Section 167 of the Act, from the earliest possible date in the current year in which the completion on occupation is detected by the Assessor and Collector's Department. 5. Your attention if further drawn to the provision of Section 353-A about the necessary of submitting occupation certificate with a view to enable the Municipal Commissioner for Greater Mumbai to inspect your premises and to grant a permission before occupation and to leavy penalty for non-compliance under Section 471 if necessary. 6. Proposed date of commencement of work should be communicated as per requirements of Section 347 (1) (aa) of the Bombay Municipal Corporation Act. 7. One more copy of the block plan should be submitted for the Collector, Mumbai Suburbs District. 8. Necessary permission for Non-agricultural use of the land shall be obtained from the Collector Mumbai Suburban District before the work is started. The Non-agricultural assessment shall be paid at the site that may be fixed by the Collector, Page 7 of 12 No. CHE/WS/2077/H/W/337(NEW) under the Land Revenue Code and Rules there under. Attention is drawn to the notes Accompanying this Intimation of Disapproval. Page 8 of 12 No. CHE/WS/2077/H/W/337(NEW) No. EB/CE/ /BS /A/ NOTES 1) The work should not be started unless objections are complied with 2) A certified set of latest approved plans shall be displayed on site at the time of commencement the work and during the progress of the construction work. 3) Temporary permission on payment of deposit should be obtained any shed to house and store for construction purpose, Residence of workmen shall not be allowed on site. The temporary structures for storing constructional material shall be demolished before submission of building completion certificate and certificate signed by Architect submitted along with the building completion certificate. 4) Temporary sanitary accommodation on full flushing system with necessary drainage arrangement should be provided on site workers, before starting the work. 5) Water connection for constructional purpose will not be given until the hoarding is constructed and application made to the Ward Officer with the required deposit for the construction of carriage entrance, over the road side drain. 6) The owners shall intimate the Hydraulic Engineer or his representative in Wards atleast 15 days prior to the date of which the proposed construction work is taken in hand that the water existing in the compound will be utilised for their construction works and they will not use any Municipal Water for construction purposes. Failing this, it will be presume that Municipal tap water has been consumed on the construction works and bills preferred against them accordingly. 7) The hoarding or screen wall for supporting the depots of building materials shall be constructed before starting any work even though no materials may be expected to be stabled in front of the property. The scaffoldings, bricks metal, sand preps debris, etc. should not be deposited over footpaths or public street by the owner/ architect /their contractors, etc without obtaining prior permission from the Ward Officer of the area. 8) The work should not be started unless the manner in obviating all the objection is approved by this department. 9) No work should be started unless the structural design is approved. 10) The work above plinth should not be started before the same is shown to this office Sub-Engineer concerned and acknowledgement obtained from him regarding correctness of the open spaces & dimension. 11) The application for sewer street connections, if necessary, should be made simultaneously with commencement of the work as the Municipal Corporation will require time to consider alternative site to avoid the excavation of the road an footpath. Page 9 of 12 No. CHE/WS/2077/H/W/337(NEW) 12) All the terms and condition of the approved layout /sub-division under No. of should be adhered to and complied with. 13) No Building /Drainage Completion Certificate will be accepted non water connection granted (except for the construction purpose) unless road is constructed to the satisfaction of the Municipal Commissioner as per the provision of Section 345 of the Bombay Municipal Corporation Act and as per the terms and conditions for sanction to the layout. 14) Recreation ground or amenity open space should be developed before submission of Building Completion Certificate. 15) The access road to the full width shall be constructed in water bound macadam before commencing work and should be complete to the satisfaction of Municipal Commissioner including asphalting lighting and drainage before submission of the Building Completion Certificate. 16) Flow of water through adjoining holding or culvert, if any should be maintained unobstructed. 17) The surrounding open spaces around the building should be consolidated in Concrete having broke glass pieces at the rate of 12.5 cubic meters per 10 sq. meters below payment. 18) The compound wall or fencing should be constructed clear of the road widening line with foundation below level of bottom of road side drain without obstructing flow of rain water from adjoining holding before starting the work to prove the owner’s holding. 19) No work should be started unless the existing structures proposed to be demolished are demolished. 20) The Intimation of Disapproval is given exclusively for the purpose of enabling you to proceeds further with the arrangements of obtaining No Objection Certificate from the Housing Commissioner under Section 13 (h) (H) of the Rent Act and in the event f your proceeding with the work either without an intimation about commencing the work under Section 347(1) (aa) or your starting the work without removing the structures proposed to be removed the act shall be taken as a severe breach of the conditions under which this Intimation of Disapproval is issued and the sanctioned will be revoked and the commencement certificate granted under Section 45 of the Maharashtra Regional and Town Planning Act 1966, (12 of the Town Planning Act), will be with drawn. 21) If it is proposed to demolish the existing structures be negotiations with the tenant, under the circumstances, the work as per approved plans should not be taken up in hand unless the City Engineer is satisfied with the following:- i. Specific plans in respect of evicting or rehousing the existing tenants on hour stating their number and the areas in occupation of each. ii. Specifically signed agreement between you and the existing tenants that they are willing to avail or the alternative accommodation in the proposed structure at standard rent. iii. Plans showing the phased programme of constructions has to be duly approved by this office before starting the work so as not to contravene at any stage of construction, the Development control Rules regarding open spaces, light and ventilation of existing structure. Page 10 of 12 No. CHE/WS/2077/H/W/337(NEW) 22) In case of extension to existing building, blocking of existing windows of rooms deriving light and its from other sides should be done first starting the work. 23) In case of additional floor no work should be start or during monsoon which will same arise water leakage and consequent nuisance to the tenants staying on the floor below. 24) The bottom of the over head storage work above the finished level of the terrace shall not be less than 1.20 Mt.and not more than 1.80 mt. 25) The work should not be started above first floor level unless the No Objection Certificate from the Civil Aviation Authorities, where necessary is obtained. 26) It is to be understood that the foundations must be excavated down to hard soil. 27) The positions of the nahanis and other appurtenances in the building should be so arranged as not to necessitate the laying of drains inside the building. 28) The water arrangement nut be carried out in strict accordance with the Municipal requirements. 29) No new well, tank, pond, cistern or fountain shall be dug or constructed without the previous permission in writing of the Municipal Commissioner for Greater Mumbai, as required in Section 381-A of the Municipal Corporation Act. 30) All gully traps and open channel drains shall be provided with right fitting mosquito proof made of wrought iron plates or hinges. The manholes of all cisterns shall be covered with a properly fitting mosquito proof hinged cast iron cap over in one piece, with locking arrangement provided with a bolt and huge screwed on highly serving the purpose of lock and the warning pipes of the rabbet pretested with screw or dome shape pieces (like a garden mari rose) with copper pipes with perfections each not exceeding1.5 mm in diameter. The cistern shall be made easily, safely and permanently accessible be providing a firmly fixed iron ladder, the upper ends of the ladder should be earmarked and extended 40 cms above the top where they are to be fixed as its lower ends in cement concrete blocks. 31) No broken bottles should be fixed over boundary walls. This prohibition refers only to broken bottles to not to the use of plane glass for coping over compound wall. 32) a Louvres should be provided as required by Bye0law No. 5 (b) b Lintels or Arches should be provided over Door and Windows opening c The drains should be laid as require under Section 234-1(a) d The inspection chamber should be plastered inside and outside. 33) If the proposed additional is intended to be carried out on old foundations and structures, you will do so as your own risk. Page 11 of 12 No. CHE/WS/2077/H/W/337(NEW) Executive Engineer, Building Proposals Zones ……….…………….. wards. CHE/WS/2077/H/W/337(NEW) Copy To :- 1. Ghanshyam Shivlal Mistry 204, Rose Residency, Near Mamaji Medical, Dixit Road Extn. Off. Shraddhanand Road, Vile Parle (East) 2. Asst. Commissioner H/W Ward. 3. A.E.W.W. H/W Ward, 4. Dy.A & C. Western Suburb I 5. Chief Officer, M.B.R. & R. Board H/W Ward . 6. Designated Officer, Asstt. Engg. (B. & F.) H/W Ward , 7. The Collector of Mumbai % DSUnknown q 1G 1g 0.1 0 0 0.1 9 0 cm 0 J 0 j 4 M []0 d 1i 0g 313 292 m 313 404 325 453 432 529 c 478 561 504 597 504 645 c 504 736 440 760 391 760 c 286 760 271 681 265 626 c 265 625 l 100 625 l 100 828 253 898 381 898 c 451 898 679 878 679 650 c 679 555 628 499 538 435 c 488 399 467 376 467 292 c 313 292 l h 308 214 170 -164 re f 0.44 G 1.2 w 1 1 0.4 rg 287 318 m 287 430 299 479 406 555 c 451 587 478 623 478 671 c 478 762 414 786 365 786 c 260 786 245 707 239 652 c 239 651 l 74 651 l 74 854 227 924 355 924 c 425 924 653 904 653 676 c 653 581 602 525 512 461 c 462 425 441 402 441 318 c 287 318 l h 282 240 170 -164 re B Q Name : ASHOK SHAMBHAJIRAO WAKADE Designation : Executive Engineer Organization : MUNICIPAL CORPORATION OF GREATER MUMBAI Date : 21-Nov-2017 18: 39:57 Page 12 of 12