ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of money from the Designated Account) To, Date:-04.07.2025 SD Corporation Private Limited 70, Nagindas Master Road, Fort, Mumbai - 400023 Subject: Certificate of Percentage of Completion of Construction Work of Building No. 5 SIENNAA Wing E for Construction of 1 building [MahaRERA Registration Number P51800019677] situated on the Plot situated on the Plot bearing CTS No. 840 A/1 demarcated by its boundaries (latitude and longitude of the end points) ______ to the North ______ to the South ______ to the East ______ to the West of Division Konkan Village Poisar Taluka Borivali District Mumbai PIN 400101 admeasuring 15030.00 sq. mtrs. area being developed by SD Corporation Private Limited. Sir, I, Prashant Mayekar, have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of Building No. 5 SIENNAA Wing E, situated on the plot bearing CTS No. 840 A/1 of Division Konkan Village Poisar Taluka Borivali District Mumbai PIN 400101 admeasuring 15030.00 sq. mtrs. area being developed by SD Corporation Private Limited. 1. Following technical professionals are appointed by Owner / Promoter: i. Shri Prashant Mayekar as Architect ii. M/s JW Consultants LLP as Structural Consultant iii. M/s Electromech Consultancy Pvt. Ltd. as MEP Consultant iv. Shri. Aaba Borse as Site Supervisor Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project as registered vide number P51800019677under MahaRERA is as per table A herein below. The percentage of work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Building No. 5 SIENNAA Wing E Sr. No. Tasks / Activity Percentage of work done 1. Excavation 100% 2. One Number of Basements and One number Plinth: 100% 3. 05 Number of Podiums 100% 4. Zero Stilt Floor 100% 5. *23 of Slabs of Super Structure - 100% 6. Internal walls, Internal Plaster, Flooring within Flats / Premises, Doors and Windows to each of the Flat / 58% Premises 7. Sanitary Fittings within the Flat / Premises, Electrical 0% Fittings within the Flat / Premises 8. Staircases, Lift wells and Lobbies at each Floor Level connecting Staircases and Lifts, Overhead and 100% Underground Water Tanks 9. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building 58% / Wing 10. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, mechanical equipment, Compliance to conditions of environment / CRZ NOC, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate Table B Internal & External Development Works in Respect of the entire Registered Phase Sr. No. Common Areas and Proposed Percentage Details Facilities, Amenities(Yes/No) of work done 1. Internal Roads & Footpaths Yes 0% - 2. Water Supply Yes 0% - 3. Sewerage (Chamber, Lines, Yes 60% STP completed Septic Tank, STP) 4. Storm Water Drains Yes 10% WIP 5. Landscaping & Tree Planting Yes 0% - 6. Street Lighting Yes 0% - 7. Community Buildings No 0% - 8. Treatment & Disposal of Yes 75% Installed & sewage and Sludge water commissioned .Connection not yet done . 9. Solid Waste management and Yes 0% - disposal 10. Water conservation, Rain Yes 0% - water harvesting 11. Energy management Yes 0% Energy efficient light to be used in common areas. 12. Fire protection and fire safety Yes 5% - requirements 13. Electrical meter room, sub- Yes 0% - station, receiving station 14. Others (Option to add more) N/A N/A N/A Yours faithfully PRASHANT MAYEKAR (License No. CA/2010/47731) (Work Done as on Dt.30.06.2025)