YOGITA BHANDARKAR (B. ARCH.) M0. NO. -9t67r5AOS4 Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTI FICATE To, The Arihant Superstructures Ltd. 2 5th fl oor, Arihant Aura, Plot no, 73/'1,, TTC Industrial Area, Turbhe, Navi Mumbai 400705 Subject: Certificate of Percentage of Completion of consfruction Work of Arihant Avanti being developed by Arihant Superstructures Ltd, Sir/Ma'am, I/We Ms, Yogita Bhandarkar have undertaken assignment as Architect / Licensed Surveyor of Certiffing Percentage of Completion of Construction work of Arihant Avanti, Being developed by Arihant Superstructures Ltd. Based on Site Inspection, with respect to Layout each of the Buildin g / Wing of the aforesaid Real Estate Project. I certifli that as on the date of this Certificate, the Percentage of Work done for each of the building /Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B 1303, Haridarshan chs. Plot no.77 & l-B sector 9 Ulwe Navi Mumbai 470206 TABLE - A Layout / Building / Wing Number - BEttA (To be prepared separately for each layout / Building / WinCof the project) Sr. No Tasks / Activity Percentage of Actual work Done (As on date of the Certificate ) ., BELLA,, 1_. Excavation o.oo% 2. Plinth o.oo% 3. Stilt floor 0.oo% 4. Slabs of Super Structure 0.oo% 5. Internalwalls, Internal Plaster, Flooring, Doors and windows o.oo% within Flats/Premises. 6. Sanitary Fittings within the Flat/Premises o.oo% 7. Staircase Lifts Wells and Lobbies at each Floor level Overhead 0.00% and Underground Water Tanks 8. External Plumbing and external plaster, elevation, completion of o.oo% Terraces with waterproofing of the Building/ Wing 9. Installation of Lifts, water pumps, Fire Fighting Fittings and 0.00% Equipment as per CFO NOC, Electricalfittings, mechanical equipment, compliances to conditions of environm ent / CRZ NOC, finishing to entrance lobby's plinth protection paving of areas appurtenant to building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. 10. Overall Percentage of completion of the work done for the 0.00% entire building TABLE - B Common Areas (lnternal & External Development Works) in respect of the Registered Phase /Projecl Number Sr. Common areas and facilities Proposed Percentage of Deta ils No (Yes / No) Actualwork Done (As on date of the Certificate) 1. lnternal Roads & Footpaths Yes 0.o0% CC with tremix 2. Parking Yes o.oo% WNS 3. Water Supply Yes o.oo% G.l. Water Line network 4. Sewerage ( Chamber, Lines, Septic Yes o.o0% STP treated Tank, STP) 5. Storm Water Drains Yes 0.00% WNS (Work not Started) 6. Landscaping & Tree Planting Yes o.oo% WNS 7. Street Lighting Yes o.oo% WNS 8. Community Buildings Yes o.oo% WNS 9. Treatment and disposal of Sewage Yes o.oo% WNS and sullage water. 10. Solid Waste management & Yes O.OOo/o WNS Disposal 71_. Water Conservation / Rain Water Yes 0.00% WNS harvesting 12. Energy Management Yes o.oo% WNS 13. Fire protection and fire safety Yes o.oo% WNS requirements L4. Electrical meter room, substation Yes o.oo% WNS receiving station 1_5. Others (Option to Add More) This certificate is issued on request of M/s, Arihant Superstructures Ltd, For RERA registration. Yours Faithfully, (cA/2008/41.7s0) Agreed and Accepted by: Date:09/05/2024