FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) Date: 05/04/2026 To, M/s. SAGAR ENTERPRISES, Survey No. 4/1/A/3, Village- Kolivali, Kalyan-Dombivali (M Corp.), Kalyan, Thane, 421301 Quality Assurance Certificate ( Certificate No. 02 for the Year Ending 31st March 2025 ) Subject: Certificate for quality of materials used and quality of Construction and workmanship of the work of ANANT SAGAR – BUILDING” E” having MahaRERA Registration Number – P51700077392 being developed by SAGAR ENTERPRISES. Sir, I Mr. SUBHASH M. SONAWANE, have undertaken an assignment of supervision of this real estate project. Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been No conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 Whether Structural Engineer has been appointed for Yes Name: Majid Dhokle the project? License No: STATE/R/2025/APL/16670 Cont. : +91-8097972668 E-mail : dhokleandassociates@gmail.com 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at the site properly and endorsed by the Engineer–in- Charge? 4 Whether testing facilities to check quality of No material is available at site? Page 1 of 3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, especially in case of multistoried construction? 6 Has suitable cognizance been taken on demarcated No flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm Yes to relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and construction Yes products are being done from accredited labs also? If yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes Natural Well (ii) Has water been tested and approved by Yes Water Filter is installed on site. Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes wiring/connections/lift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanship and quality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as per relevant Code of Practice? 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? If yes, provide details 5 Whether safety precautions are undertaken Yes during construction activities for all type of workers? Page 2 of 3 4. Miscellaneous Sr. No. Parameters Yes/No Remarks 1 Whether third party quality inspection is being No carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken No for the soil? 3 Whether fire-fighting arrangements has been No undertaken under supervision of fire 4 consultant? Whether proper signages have been installed on No site/completed building as per requirement? 5 Whether precautions are undertaken to avoid No air pollution during construction? Please specify. 6 Whether records of all test reports/results have been Yes properly kept in the prescribed formats and whether the same are available at site for viewing by allottees and to be handed over to the association of allottees? 7 Whether all relevant records including Yes sanctioned building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? 8 Any innovative/cost effective/green technology No has been used for improving quality/energy efficiency? Please specify. Yours Faithfully Signature of Engineer (Site Supervisor) Mr. Subhash M. Sonavane License No.(if any) : ( Under Engineer : Mr. Majid Dhokle ) Agreed and accepted by Signature of Promoter Name: SAGAR ENTERPRISES Date : 05/04/2026 Date: 05/04/2026 Page 3 of 3