FORM I {See Regulation No. ~ Date:- 0 I/ 102024. To, Mis. Sagar Enterprise , 01, Apna Ghar Society, Behind St. Thomas School, Karnik Road, Kalyan W. 42130 I. Sub:- Certificate of percentage of completion of construction work of Building E - Anant Sagar (Maha RERA Registration Number - P51700077392) situated on the plot bearing S. No. 4, H. No. lA/3, (Plot B) Viii:- Kolivali, Taluka:- Kalyan, District:- Thane, Pin- 42130 I, being developed by Mis. SAGAR ENTERPRISE. Sir, I, Shobhana Deshpande, Proprietor, CREATIONS, have undertaken assignment as an Architect of certifying of percentage of completion of construction work of Building E - Anant Sagar (Maha RERA Registration Number - P51700077392) situated on the plot bearing S. No. 4, H. No. I A/3, (Plot 8) Viii:- Kolivali, Ta Iuka:- Kalyan, District:- Thane, Pin- 42 I30 I, being developed by Mis. SAGAR ENTERPRISE. Based on Site Inspection , with respect to each of the Building- E of the aforesaid Real Estate Project, I certify that as on 30/09/2024, the Percentage of work done for each of the Wing of the Real Estate Project as registered vide number PSl 700077392 under Maha RERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table 8. A/ 104, 105,106, Everest Towers , Santoshi Mata Road, Kalyan (w.) 421301. Contact: 0251-23131 40, 8828877927 E-mail : designteam @creations .org.in Table-A Bldg. E: - Sr. No. Tasks/ Activity Percentage of work done 100% - I. Excavation 2. 0 Number of Basement (s) and Plinth 100% 3. Number of podiums Not Proposed 4. Stilt Floor 50% 5. 8 number of slabs of super structure th 75'% 6 slab is completed. 6. Internal walls, Internal Plaster ' 0% Flooring within Flats/ Premises Doors and Windows to each of the Flat/Premises 7. Sanitary Fittings within the Flat/Premises 0% Electrical Fittings within the Flat/Premises 8. Staircase, Lifts Wells and Lobbies at each 0% Floor level connecting Staircase and Lifts, Overhead and Underground Water Tanks 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing 10. Installation of lifts, water pumps, Fire Fittings and Equipment as per CFO NOC, Electrical · fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ 0% NOC, Finishing to entrance lobby/s, plinth protection, pavmg of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate. Note: - The work percentage mentioned above is as per the number of floors sanctioned vide letter no. \%;;;;~::iSl..' /KD/2021-22/69/427, Dated- 24/02/2023 . A/ 104,105,106, Everest Towers , Santos hi Mata Road, Kalyan (w.) 421301 . Contact: 0251-2313140, 882887792 7 E- mail : designteam@creations.org .in Internal & External Development WTabl~ · 8 f th entire Registered Phase orks 1n Respect o e Common areas and Facilities, Sr. No. Proposed Percentage of Amenities Details (Yes/No) work done 1. Internal Roads & Footpaths No 0% -- 2. Water Supply Water Supply provided by Yes 0% KDMC 3. Sewerage (Chamber, lines, Yes 0% -- Septic Tank, STP) 4. Storm Water Drains -- Yes 0% 5. Landscaping & Tree Planting -- Yes 0% 6. Street Lighting -- No 0% 7. Community Buildings -- -- No 8. Treatment and disposal of -- -- Yes sewage and sullage water 9. Solid Waste management & Yes -- -- Disposal 10. Water conservation Rain water 0% Yes harvesting 0% Roof Top Photovoltaic 11. Energy management Yes (RTPV) System proposed 12. Fire protection and fire safety Yes 0% -- requirements 13. Electrical meter room, Yes 0% -- Transformer Ar.Shobhana Deshpande (Reg.No. 7 Agreed & Accepted by Name : Mr. Moiz Zojwalla. Date:- 01/10/2024. A/ 104, 105,106, Everest Towers, Santoshi Mata Road , Kalyan(w.) 421301 . Contact:0251-2313140 , 882887 7927 E- mail : designteam@creations.org .in