Vijay Pandey And Associates Architects Interior Designers Valuers Mail Id-vijaypandeyandassociates@gmail.com Annexure AFORM 1[see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: -30/09/2025. To Om Builders & Developers Through Mr.Dinesh Sonawane & Other’s Kalyan. Subject: Certificate of Percentage of Completion of Construction Work of ‘Swami DattakrupaCo.Op.HSG.SOC.LTD’ having Maha RERA R e g i s t r a t i o n N u m b e r ( P 5 1 7 0 0 0 7 7 3 6 8 ) situated on the Plot bearing Survey No.110/1/A/1/B/3, plot no.2 & S.No. 110/1/A/1/B/16, plot no.3, Village:Chikanghar, Tal.Kalyan, Dis.Thane b e i n g d e v e l o p e d b y [Promoter's Name] P.O.A: - Mr.Dinesh Sonawane & Other’s Kalyan. for Om Builders & Developers Sir, I, Vijay Pandey have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of ‘Swami DattakrupaCo.Op.HSG.SOC.LTD’ having MahaRERA Registration Number P 5 1 7 0 0 0 7 7 3 6 8 , being developed by Promoter’s Name] P.O.A: - Mr.Dinesh Sonawane & Other’s Kalyan.for Om Builders & Developers Based on Site Inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A (_____________) Layout / Building /Wing (to be prepared separately for each Layout /Building /Wing of the Project) Sr. Tasks / Activity Percentage of Actual No. Work. Done (2) ( I) (As on date of the Certificate) (3) 100% 1. Excavation N.A 2. 0 Number Basements (if any) N.A 3. 0Number Podiums (if any) 100% 4. 1Number Plinth 40% 5. Stilt Floor Office: 303, Raj-Kamal Tower, Above Kotak Mahindra Bank, Santoshi Mata Road, Kalyan (W) – 421301. Mob – 9370480016 / Tel.No.- 0251-2204441 VIJAY PANDEY & ASSOCIATES 2 r.‘ 100% 6. 8 Number Slabs of Super Structure 7. 80% Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises 50% 8. Sanitary Fittings within the Flat/Premises 9. 80% Staircases, lifts Wells and lobbies at each Floor level Overhead and Underground Water Tanks 10. 50% External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 11. Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to 0% conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase / Project Number Common areas and Facilities Proposed Sr. No. Percentage of (Yes / No) Actual Work Done Details (2) (As on date of the (1) (3) Certificate) (5) (4) No 0% N.A 1. Internal Roads & Footpaths Yes 0% 2. Water Supply 3. Sewerage (Chamber, Yes 0% lines, Septic Tank, STP). Yes 0% 4. Storm Water Drains Yes 0% 5. Landscaping & Tree Planting No 0% N.A 6. Street Lighting No 0% N.A 7. Community Buildings 8. No 0% N.A Treatment and disposal of sewage and sullage water. Office: 303, Raj-Kamal Tower, Above Kotak Mahindra Bank, Santoshi Mata Road, Kalyan (W) – 421301. Mob – 9370480016 / Tel.No.- 0251-2204441 VIJAY PANDEY & ASSOCIATES 3 9. Solid Waste No 0% N.A management & Disposal 10. Water conservation / Yes Rain water harvesting 0% Yes 0% 11. Energy management 12. No 0% N.A Fire protection and lire safety requirements 13. Yes 0% Electrical meter room, sub-station, receiving station. 14. Others (Option to Add more). Vijay Pratap Ramashray Pandey Yours Faithfully, Digitally signed by Vijay Pratap Ramashray Pandey DN: c=IN, o=Personal, postalCode=400610, l=Thane, st=Maharashtra, street=Neelkanth woods 2304 A wing Patlipada, Thane, Maharashtra India- 400610- Mulla baug, title=9811, 2.5.4.20=e80c386030d06199c75ec7407c071354ac6aa43d47c23548172fda5a77378a2d, serialNumber=22228df6bb41e7c385cf5c27e23ac8df7889fb8ffcdfe586c0ef52e66aed38cd, email=vijaypandeyandassociates@gmail.com, cn=Vijay Pratap Ramashray Pandey Date: 2025.11.13 19:52:59 +05'30' Name (VIJAY PANDEY) of Architect (Registration No.CA/96/20081) Agreed and Accepted by: Signature of Promoter Name: Mr.Dinesh Sonawane for Om Builders & Developers Date: -30/09/2025. Office: 303, Raj-Kamal Tower, Above Kotak Mahindra Bank, Santoshi Mata Road, Kalyan (W) – 421301. Mob – 9370480016 / Tel.No.- 0251-2204441