FORM - 1 ARCHITECT’S CERTIFICATE Date: 12th July 2025 To, Lodha Developers Limited (Formerly Known as Macrotech Developers Limited) 412-4, 17G Vardhman Chamber, Cawasji Patel Road, Horniman Circle, Fort. Mumbai – 400001 Subject: Certificate of Percentage of Completion of Construction Work of “Hanging Garden Palava“ having MahaRERA registration number “P51700077356” being developed by Lodha Developers Limited (Formerly Known as Macrotech Developers Limited) Sir, We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of the Hanging Garden Palava having MahaRERA registration number “P51700077356” being developed by Lodha Developers Limited (Formerly Known as Macrotech Developers Limited) Based on site inspection, with respect to Layout/ each of the Building/ Wing of the aforesaid Real Estate Project. We certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the real estate project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Digitally signed by VINI VILAS DESAI VINI DN: cn=VINI VILAS DESAI c=IN o=Personal VILAS Reason: I am the author of this document Location: DESAI Date: 2025-07-15 23:06+05:30 TABLE-A Wing B Sr. Tasks / Activity Percentage of No. work done as on 30th June 2025 1 Excavation 100% 2 0 number of Basements (S) and Plinth 70% 3 0 number of podiums - 4 Stilt Floor - 5 37 number of Slabs of Super Structure 0% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0% Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0% Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 0% and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 0% per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate Digitally signed by VINI VILAS VINI VILAS DESAI DN: cn=VINI VILAS DESAI c=IN o=Personal DESAI Reason: I am the author of this document Location: Date: 2025-07-15 23:06+05:30 2 Table B - Common Areas & Amenities (Project level) Percentage of work Sr. No. Common areas and Facilities, Amenities done as on 30th June 2025 1 Internal Roads & Foothpath 0% 2 Water Supply 0% 3 Sewarage (Chamber, lines, Septic Tank, STP) 0% 4 Storm Water Drains 0% 5 Landscaping & Tree Planting 0% 6 Street Lighting 0% 7 Community Buildings 0% 8 Treatment and disposal of sewage and sullage water 0% 9 Solid Waste management & disposal 0% 10 Water conservation, Rain water 0% 11 Energy management 0% 12 Fire protection and fire safety requirements 0% 13 Electrical meter room, sub-station receiving station 0% 14 Aggregate area of recreational Open Space 0% 15 Open Parking 0% 16 Closed Parking 0% 17 Others (Option to Add more) - Your Faithfully For Vilas Desai & Associates Digitally signed by VINI VILAS DESAI VINI VILAS DN: cn=VINI VILAS DESAI c=IN o=Personal DESAI Reason: I am the author of this document Location: Date: 2025-07-15 23:06+05:30 Architect Vini Vilas Desai Reg. No. CA/2008/43203 3