ARCHITECT RAHUL SHRIKHANDE & ASSOCIATES CA/2015/72591 M.Arch (Sustainable Architecture) +91 9999 843 833 GRIHA Trainer and Evaluator shrikhande11@gmail.com Annexure A FORM 1 ARCHITECT CERTIFICATE Date :- 09-07-2026 Ref No. :- Cert/038/2026-27 Period – April 2026 to June 2026 To, M/s.ATHARVA INFRASTRUCTURES Mr.Subhash B Ghorpade & Mr Rohan G. Patil Add. Plot No.100 Sadgurukrupa Bungalow, Vithal Rukhmini CHS Vadawli Section, Ambernath East 421501 Subject: Certificate of Percentage of Completion of Construction Work of Swanand Vedika at Survey No. 206, Hissa No. 5 & Survey No 206, Hissa No, 1 / 2 at Village Badlapur West 421503 having MahaRERA Registration Number P51700077350 (Only Applicable after project Registration) being developed by M/s. Atharva Infrastructures Sir, I/We Ar Rahul Shrikhande have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Swanand Vedika at Survey No. 206, Hissa No. 5 & Survey No .206, Hissa No 1 / 27 at Village Badlapur East 421503 having MahaRERA Registra- tion Number P51700077350 Only Applicable after project Registration) being developed by M/s. M/s. Atharva Infrastructures. Based on Site Inspection, with respect to› Layout / each o f the Building Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for e ach of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein be1ow. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B Digitally signed by RAHUL RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE Date: 2026.07.09 SHRIKHANDE 15:46:29 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 TABLE – A Building 1 + Ground + 7 Layout / B uilding / Wing Number (to be prepared separately for each Layout / Building /Wing of the Project) Sr. Tasks / Activity Percentage of Actual Work No. Done (2) (1) (As on dale of the Certificate) (3) 1 Excavation 100% 2 Basements ( if any) No NA N .3. Podiums (if any) No NA 4. Plinth Yes 100 % 5. Stilt Floor PART 100 % 6. Eight S labs of Super Structure 100 % 7. Internal walls, Internal Plaster, Floorings, Door s and windows within 98 % 98 % 8. Sanitary Fittings within the Flat/Premises 9. Staircase’s. Lifts Wells and I.obbies at each Floor level Overhead and Un- derground Water Tanks 98 % 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing, 98% 1.1. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as NA per CFO NOC", Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifi- cations in agreement of Sale. Any other activities. Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE Date: 2026.07.09 SHRIKHANDE 15:46:43 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 TABLE – A Building 2 - Ground + 7 Layout / Building / Wing Number (to be prepared separately for each Layout / Building /Wing of the Project Sr. Tasks / Activity Percentage of Actual Work No. Done (2) (1) (As on dale of the Certificate) (3) 1 Excavation 0% 2 Basements ( if any) No NA N .3. Podiums (if any) No NA 4. Plinth Yes 0% 5. Stilt Floor PART 0% 6. ______ S labs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Door s and windows within 0% 0% 8. Sanitary Fittings within the Flat/Premises 9. Staircase’s. Lifts Wells and I.obbies at each Floor level Overhead and Un- derground Water Tanks 0% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing, 0% 1.1. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as NA per CFO NOC", Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifi- cations in agreement of Sale. Any other activities. Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE SHRIKHANDE Date: 2026.07.09 15:46:57 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 TABLE – A Building 3 - Ground + 7 Layout / Building / Wing Number (to be prepared separately for each Layout / Building /Wing of the Project Sr. Tasks / Activity Percentage of Actual Work No. Done (2) (1) (As on dale of the Certificate) (3) 1 Excavation 0% 2 Basements ( if any) No NA N .3. Podiums (if any) No NA 4. Plinth Yes 0% 5. Stilt Floor PART 0% 6. ______S labs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Door s and windows within 0% 0% 8. Sanitary Fittings within the Flat/Premises 9. Staircase’s. Lifts Wells and I.obbies at each Floor level Overhead and Un- derground Water Tanks 0% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing, 0% 1.1. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as NA per CFO NOC", Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifi- cations in agreement of Sale. Any other activities. Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE SHRIKHANDE Date: 2026.07.09 15:47:07 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 TABLE – A Building 4 - Ground + 7 Layout / Building / Wing Number (to be prepared separately for each Layout / Building /Wing of the Project Sr. Tasks / Activity Percentage of Actual Work No. Done (2) (1) (As on dale of the Certificate) (3) 1 Excavation 0% 2 Basements ( if any) No NA N .3. Podiums (if any) No NA 4. Plinth Yes 0% 5. Stilt Floor PART 0% 6. _____ S labs of Super Structure 0% 7. Internal walls, Internal Plaster, Floorings, Door s and windows within 0% 0% 8. Sanitary Fittings within the Flat/Premises 9. Staircase’s. Lifts Wells and I.obbies at each Floor level Overhead and Un- derground Water Tanks 0% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing, 0% 1.1. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as NA per CFO NOC", Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifi- cations in agreement of Sale. Any other activities. Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE Date: 2026.07.09 SHRIKHANDE 15:47:16 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 TABLE – A Building 5 ( A Wing & B Wing ) Stilt + 6 Layout / Building / Wing Number (to be prepared separately for each Layout / Building /Wing of the Project Sr. Tasks / Activity Percentage of Actual Work No. Done (2) (1) (As on dale of the Certificate) (3) 1 Excavation 100% 2 Basements ( if any) No NA N .3. Podiums (if any) No NA 4. Plinth Yes 100 % 5. Stilt Floor Yes 100 % 6. Three S labs of Super Structure 50 % 7. Internal walls, Internal Plaster, Floorings, Door s and windows within 10 % 0% 8. Sanitary Fittings within the Flat/Premises 9. Staircase’s. Lifts Wells and I.obbies at each Floor level Overhead and Un- derground Water Tanks 0% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building Wing, 0% 1.1. Installation of Lifts. water pumps, Fire Fighting Fittings and Equipment as NA per CFO NOC", Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifi- cations in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase / Project Number Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE SHRIKHANDE Date: 2026.07.09 15:47:36 +05'30' 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503 Sr. No. Common area’s and Facilities (2) Proposed Percentage of Ac- Details (Yes, /No ) tual Work Done (As on date of the (1) Certificated) (3) (4) (5) 1. Internal Roads & Footpaths No Nil NA Yes Nil 0% 2. Water Supply 3. Sewerage (Chamber lines, Septic Tank, STP). NA Nil NA 4. Storm Water Drains Yes Nil 0% 5. NA NA 0% Landscaping & Tree Planting 6. Street Lighting No 0% NA 7. Community Buildings NA NA NA 8. Treatment and disposal sewage and No NA NA sullage water. No NA NA 9. Solid Waste management & Disposal NA 0% NA IO. Water conservation / Rain water harvesting No 0% 0% 11. Energy management NA NA 0% 12. Fire protection and Fire safety requirements Yes 0% NA 13 Electrical meter room, sub-station, Receiving station - NA 14. Others (Option to Add more). Yours Faithfully, Digitally signed RAHUL by RAHUL CHANDRAKA CHANDRAKANT NT SHRIKHANDE Date: 2026.07.09 SHRIKHANDE 15:47:45 +05'30' Ar. Rahul Shrikhande M.Arch Sustainable Architecture (CA/2015/72591 Agreed & Accepted by : Signature of Promoter Name Date 201, SHREEYASH APARTMENT, NEAR AMBIKA HOTEL, BADLAPUR EAST, THANE 421503