Signature Not Verified Digitally signed by Somnath Shantaram Kekan Date: 2026.03.31 15:30:03 IST Reason: Approved Drawing Plan Designation : Assistant Director Town Planning Location: Navi Mumbai Municipal Corporation Project Code : NMMCC-23-104771 Application Number : RNMMCC202500515 Proposal Number : 1588814 Certificate Number : NMMCC/RB/2026/APL/00157 7RZQ3ODQQHU 'DWH -XQLRU(QJLQHHU 'DWHReserved for Stamps of Approval plan STAMP OF APPROVAL 07/11 6.166 4.901 2.200 3.400 5.600 0.349 6.201 0.450 BUILT UP AREA CALCULATION R1 FOR 6TH FLOOR JIMMY PARK D-02 AREA NAME LENGTH WIDTH Area(Sq.M) 0.650 1.100 BLOCK 6.050 5.250 28.841 1.250 BLOCK AREA TOTAL =28.841Sq.M TOTAL Deduction =0.000Sq.M 0.450 0.350 3.200 Net BuiltUp Area =28.841 Sq.M BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK R1 D-02 3.650 BUILT UP AREA CALCULATION MP 6.000 MT. WIDE RA 6.000 3.065 3.065 FOR 6TH FLOOR JIMMY PARK H PO DI UM AREA NAME LENGTH WIDTH Area(Sq.M) DN TO 5T BLOCK 3.650 3.065 11.187 SLOPE 1:8 BLOCK AREA TOTAL =11.187Sq.M TOTAL Deduction =0.000Sq.M 3.650 Net BuiltUp Area =11.187 Sq.M BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK 01 6.150 3.5500.150 7.040 06 ELEVATION ELEVATION 2.200 2.700 0.450 4.900 FEATURE 6.000 FEATURE 0.250 BUILT UP AREA CALCULATION 2.050 FOR 6TH FLOOR JIMMY PARK AREA NAME LENGTH WIDTH Area(Sq.M) 0.750 DN 0.750 BLOCK 5.350 3.950 20.323 0.450 BLOCK AREA TOTAL =20.323Sq.M ELEVATION ELEVATION A TOTAL Deduction =0.000Sq.M 0.050 0.250 Net BuiltUp Area =20.323 Sq.M PODIUM P- LINE AREA = 710.154 SQ.MT. 3.650 PROJECTION PROJECTION STACK BUILDING LINE PARKING CP 23 24 ABOVE BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK Lvl. + 21.450 Mts. 3 0.32 0.90 M HIGH 72 PARAPET WALL 1.500 RAMP 1.600 1.550 0.3 STACK 0 0.9 CP 21 22 0.96 SLOPE 1:10 89 PARKING 1.990 0.393 4.470 1.990 0.326 1.550 4.090 1.800 0.895 0.900 2.740 2.740 2.490 2.490 3.340 CUT OUT IN 23 72 0.3 1.500 M HIGH 1.500 M HIGH SLAB CUT OUT IN 1.500 1.600 0.3 60 1.550 0.9 89 0.150 1.650 SLAB 1.350 0.9 D4 1.990 0.393 1.990 0.326 D11 1.550 2.550 D3 PARAPET WALL PARAPET WALL STACK CP 19 20 D12 1.345 0.895 2.580 D1 2.550 PARKING 0.900 4.130 0.649 2.740 2.740 1.800 2.490 2.490 1.550 2.700.700 E.D. D5 D6 D9 2.000 1.900 S3 S3 D10 D13 0.450 S-301 LIFT-1 FD 1.80 S-301 D2 2.200 3.400 3.650 2.150 M. 2.580 X 2.000 X 1.90 0.150 1.350 DUCT 4.550 1.345 0.450 1.800 WIDE LOBBY 2.580 STACK CP 17 18 2.580 1.800 2.550 BUILT UP AREA CALCULATION ELEVATION ELEVATION 0.250 0.349 FOR 6TH FLOOR JIMMY PARK F.D. 1.900 PARKING 2.000 2.000 1.900 Area(Sq.M) 0.651 AREA NAME LENGTH WIDTH 1.565 LIFT-2 FD D14 FEATURE FEATURE 1.80 D7 BLOCK 11.942 10.850 92.890 2.580 x 2.000 3.650 BLOCK AREA TOTAL =92.890Sq.M X 1.90 1.5000.2501.500 D1 0.250 0.450 TOTAL Deduction =0.000Sq.M Lvl. + 21.750 Mts. 4.550 10.700 1.500 Net BuiltUp Area =92.890 Sq.M 6.00 MT. WIDE DRIVEWAY W1 D15 2.580 1.800 FIRE STAIRCASE 2.500 5.070 BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK 1.900 2.300 2.000 STACK D14 2.300 FIRE LIFT CP 15 16 D7 W3a 2.880 PARKING 2.000 2.500 x 2.300 1.565 1.50 M. 5.000 5.800 2.500 5.070 1.150 Proforma I : Area Statement SPACE FOR SWIMMING 1. Area of plot (Minimum area of a, b, c to be 1.690 UP DN FIRE LOBBY CUT OUT IN 2659.780 1.500 WIDE LOBBY 2.300 2.880 considered) 3.040 POOL 6.050 1.650 2.680 SLAB D8 D16 FRD x1.630 FRD (a) As per ownership document (7/12, CTS extract) 2659.780 STACK 0.100 (b) as per TILR or City Survey measurement sheet 2659.780 1.000 1.500 PARKING CP 13 14 (c) as per Demarcated drawing area 2659.783 5.070 1.370 0.900 0.250 DN FRD 5.000 1.600 LESS - 8.150 2.Area not in possession W1 1.500 0.000 1.650 0.900 M. HIGH 0.950 PARAPET WALL D17 3. Area Proposed for development ( out of 1-2 ) 2659.780 1.190 W3a 0.450 4.900 4.Deductions for - 1.990 1.500 S2 BUILT UP AREA CALCULATION (a) Proposed D.P./ D.P. Road widening Area / S2 UP STACK 5.070 FOR 6TH FLOOR JIMMY PARK 0.000 1.370 S-301 B Service Road / Highway widening S-301 CP 11 12 0.650 2.480 D18 0.050 AREA NAME LENGTH WIDTH Area(Sq.M) 1.100 1.500 2.000 1.500 PARKING (b) Any D.P. Reservation area 0.000 P- LINE AREA = 148.973 SQ.MT. 1.250 BLOCK 10.290 7.300 47.996 BLOCK AREA TOTAL =47.996Sq.M (c) Green Belt 0.000 BUILDING LINE 2.290 0.350 TOTAL Deduction =0.000Sq.M 3.200 1.190 Net BuiltUp Area =47.996 Sq.M Total (a+b+c) 0.000 ABOVE D20 1.990 AREA COVERED D1 5.Balance area of plot (3-4) 2659.780 TAKEN IN FSI D19 BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK D4 4.470 6. Amenity Space 0.000 2.480 ELEVATION SLOPE CP 09 10 ELEVATION (Applicable if (1) > 20000 sqmt - S2 (Required -(a) Upto 20000 sqmt - Nil - FEATURE S2 FEATURE 2.290 1.800 S-301 W8 S-301 (b) Above 20000 sqmt - (a) + 5% of Total area 0.000 1.150 3.650 7. Net Plot Area (5-6 ) 2659.780 4.470 8. Recreational Open Space - ELEVATION ELEVATION 4.320 STACK 6.079 (a) If area (5) is more than 4000 sqmt - 10 % of 1.690 D2 CRECHE CP 07 08 0.000 1.540 N.T. V1 PARKING (5) is required. PROJECTION PROJECTION TAKEN 1.800 SANITARY BLOCK 4.020 X 5.740 Proposed___ 3.065 IN FSI V1 FSI-13 0.000 3.350 X 2.765 1.150 3.650 (b) If area is less than 4000 sqmt -Check - - 7.200 V1 5.970 i) If it is full number like 1,2,125,419,etc. As per 7.12 0.900 1.000 1.350 SANITARY 4.320 abstract or City Survey Number - No Recreational - TOILET 7.230 2.550 1.690 BLOCK FOR 1.540 0.85 STACK open space is required 05 06 FSI-11 PARKING CP SERVANTS 1.500 X 7.300 x 1.500 X 2.100 FSI-14 ii) If it is subdivision like 1/2 ,2/5 , 125/1 419/1 3.065 2.400 - 1.500 M HIGH 1.500 M HIGH 3.45 1.20 M. WIDE PASSAGE FSI-12 3.650 etc.then recreational open space is required. D3 4.901 LiftWell21 Void20 4.550 D2 D3 W9 5.700 7.200 5.970 (A) 10 % Subject to minimum 200 sqmt 0.000 0.900 1.000 1.350 0.700 D2 10.749 3.400 Proposed ______________ 0.000 2.100 FSI-10 PARAPET WALL PARAPET WALL D1 D2 Void19 2.550 LiftWell20 (B) Exemption to leave open space subject to - 4.750 3.700 D2 10.599 1.600 X FSI-15 availing basic F.S.I of 75 % 03 01 7.300 2.520 3.400 1.824 FSI-9 1.650 2.880 (C) Exemption to leave open space subject to 5.235 FITNESS CENTRE 4.901 2.700 2.700 W9 DRIVERS 04 02 LiftWell19 payment of 10 % land value of land at (7) as per - 4.600 X 7.200 INDOOR GAMES 5.700 0.070 0.700 ROOM 10.749 annual statement of rate. D3 FSI-8 FSI-16 4.250 SOCIETY OFFICE WITH LOUNGE(SEMI OPEN) CP CP Architect/ Licensed Engineer/ Supervisor name and signature 3.400 X 5.050 10.600 X 4.650 3.00 X 4.65 STACK STACK 1.070 0.650 1.550 TOILET 4.750 3.700 10.599 Registration No. of Architect/ License no. of Licensed Engineer/ 10.000 PARKING PARKING Supervisor: CA/1993/16484 3.400 3.950 5.250 1.500 X 2.676 0.070 2.700 2.700 3.350 x 1.100 FSI-20 Name Of : Owner Jimmy Park 1 CHS Ltd 0.650 2.200 2.200 FSI-17 5.220 W5 W5 W3 FSI-3 5.000 3.150 3.650 4.250 0.650 CHAJJA SD2 W3 NATURAL TERRACE TAKEN IN FSI 0.650 SD2 V1 FSI-7 7.215 Postal Address : Flat No. B-305, 3rd Floor, Cottage Land N.T. TAKEN IN FSI 6.150 CHSL,Plot No. 16A,Navi 0.450 0.450 6.224 N.T. TAKEN IN FSI W3 W3 3.950 10.000 5.250 Mumbai,Thane,Maharashtra-400706 0.650 1.550 4.090 1.800 0.750 0.750 3.200 3.650 10.700 3.200 0.300 BUILT UP AREA CALCULATION Phone No.:9773397739 0.650 OP2 FSI-21 2.200 2.200 OP2 0.350 0.350 0.150 0.150 FOR 6TH FLOOR JIMMY PARK 0.450 3.150 FSI-2 FSI-18 3.650 AREA NAME LENGTH WIDTH Area(Sq.M) DESCRIPTION OF PROJECT : 2.6501.150 3.650 0.025 BLOCK 20.890 11.700 148.973 0.650 0.650 Type of Proposal : Mixed 3.065 ELEVATION ELEVATION BLOCK AREA TOTAL =148.973Sq.M ELEVATION FEATURE FEATURE ELEVATION FSI-5 FSI-22 Void20 - - 3.420 BUILDING ON CTS. NO./SURVEY NO.-- 0.450 0.450 0.450 0.450 FEATURE FEATURE FSI-4 FSI-1 FSI-19 FSI-23 0.350 3.550 Void19 - - 3.420 0.350 LiftWell21 - - 5.160 1.000 3.200 3.650 10.700 3.200 1.600 LiftWell20 - - 5.160 SITE ADDRESS : FSI-24 6.150 6.150 FSI-6 0.900 0.700 ELEVATION 1.500 M HIGH 1.500 M HIGH ELEVATION LiftWell19 - - 5.750 PLOT NO-182 D,SECTOR 17. NERUL, NAVI MUMBAI. MAHARASHTRA TOTAL Deduction =22.910Sq.M PROJECTION PARAPET WALL PARAPET WALL PROJECTION 4.130 Net BuiltUp Area =126.063 Sq.M 2.600 Name Of Architect : HITEN JAGDISHCHANDER SETHI BUILT-UP AREA CALCULATION 6TH FLOOR JIMMY PARK 6TH PODIUM FLOOR AREA DIAGRAM LOGO ADDRESS OF OFFICE OFFICE - Scale - 1:100 HITEN SETHI ARCHITECTS ARCHITECTS | PLANNERS | INTERIOR ARCHITECTURE | PROJECT MANAGEMENT Plot no.9, Ground Floor, Yayati CHS, HEAD OFFICE: Ground Floor, Yayati CHS, Plot no. 9, Sector - 58 A, Palm Beach Road, Nerul, Navi Mumbai, Maharashtra, India - 400 706 T: +91-22-2752 5300 | F: +91-22-2787 2166 Signature Sector 58A, Palm Not Beach VerifiedRd, Nerul, Navi 9HULILHGE\DSSOLFDQW Email: info@hitensethi.com | admin@hitensethi.com | Web site:www.hitensethi.com Mumbai, Maharashtra 400706 Digitally signed by HITEN JAGDISHCHANDER SETHI Date: 2026.03.31 13:11:32 IST Reason: Technical Person DSC Location: Navi Mumbai Municipal Corporation OWNERS SIGN - TECHNICAL PERSON SIGN Project Code : NMMCC-23-104771 Application Number : RNMMCC202500515 Proposal Number : 1588814 6th FLOOR PODIUM PLAN CAR PARKING = 24 NOS. SCALE - DATE: 04/03/26 Scale - 1:100 SCOOTER PARKING = 06 NOS. JOB NO - NMMCC-23-104771 CHECK BY - Kuldeep.N SUBMISSION DRAWING