Professional Qualification : Manoj Sharma B.E.(crvrL), MrE, Frv Chartered Engineer I Structural Engineer Panel Valuer For Many Nationalized & Private Sector Bank Managing Partner Mob : 9833198383 1UA8927255 Registered Valuer Under Wealth Tax Act, Companies Act, Black Money Act. Section - 132 Annexure- B FORM.2 INDEPENDTNT CHARTERED ENGINEER'S CERTIFICATE Date: - 3l-Mar-2025 To, SACVIRREALTORS LLP, Plot No. i82 - D, Sector 17, Nerul, Navi Mumbai -400706. - Subject: Certificate of Cost Incurred for Development of Continental Signafure being developed by Sacvir Realtgrs LLP. Havins MahaRERA Registration number P51700077334 situated on the olot no 182-D. sector-l7, Nerul, Navi Mumbai, Maharashtra" admeasuring about 2659.78 sq.mt of area being developed by SACVIR REALTORS LLP 1. I Manoj Kumar Sharma Chartered Engineer have tmdertaken assigament of certifying estimated Cost for C_ontinental Sigriature being developed by Sacvir Realtors LLP. 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartrnents and proportionate completion of internal & external works of the Foject as per specifications mentioned in agreement of sale. Our estimated cost calculation is based on the drawings/plans made available to us for the proJect under reference by the DeveloperlConsultant. The Schedule of items and quantity required for tle entire work as calculated by me who was appointed by Develcperl Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertairlconfrm the above aralysis given to us. J- We estimaie Total Estimated Cost of completion of the aforesaid project under reference at Rs. 44.88.52.360i- (Total of Table A and B) at the time of Regisffation. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apa$ments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale and for the purposes of obtaining occupation certificate/completion certificate for the building(s/ Wings(s)l Layoutl Plotted Development from the NMMC being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost incurred till date is calculated at Rs. 9J&47.5191 (Total of Table A & B). The amount of Estimated Cost Incurred is calculated on the basis of input materials/services used and unit cost of these items. 5. The Balance Cost of Completion of the Civil, MEP and Allied works for completion of the apartrnents and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs. 35,18.04.840/- (Total of Table A&B). 6. I certifr that the cost of the Civil, MEP and allied work for the apartment and proportionate internal & external works, as per specification mentioned in agreernent for sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A & B Below: Building called Continental Signature (to be prepared sepmately for each BuildingAVing/ Layout/Plotted Development of the Real Estate Project) TABLE A Sr. No. Particulars Amount On Rs.) I Total Estimated Cost of the Buildingi Y/ing1 43,88,52J60t- Layout/Plotted Development as on date of Registration is 2 Cost incurred as on date of certificate 9,6547,519/- 3 Work done in Percentage (as Percentage of the 22,080/" Estimated cost) 4 Balance Cost to be Incurred**(Based on Estimated 34,23,A4,8411- cost) 5 Cost incurred on AdditionaV Extra Items not Nil included in the Estimated Cost (Table-C) TABLE B Sr. No. Particulars Amount (In Rs.) I Total Estimated Cost of the Intemal and 1100100,0001- External pevelopment Works including amenities and Facilities in the layout as on date of Registration 2 Cost incurred as on dale of certificate 5,00,000/- 3 Work done in Percentage (as Percentage of the 5o/" estimated cost) 4 Balance cost to be Incurred ** (Based on 95,00,000/- Estimated CosQ 5 Cost incurred on AdditionaV Extra Items not Nit included in the Estimated Cost (Table-C) Yours Faithfully Manoj Kumar Sharma Name of Chartered Engineer Signature of Chartered Engineer Note: 1. The scope of work to complete the entire real estate project as per drawings approved from time to time to obtain Occupation certificatei Completion Certificate, based on current rules and regulations 2. The estimated cost includes all labour, material, equiprnent and machinery required to carry out entire work based on available information made available to independent Chartered Engineer. As this is an estimated cost, any deviation in quantity required for development of the Reai Estate project will result in amendment of the cost incurred /to be incurred. 4. All components of work wilh specification are indicative and not exhaustive. Notes: t. These estimate / cost to complete is based on taxation prior to GST impact. Based on the revised taxation, overall cost for the project may vary and shall be provided in due course upon revisions with individual vender ccntractors 2. Above cost excludes all soft costs such as approval costs, developer's overhead, land and associated costs, consultant's cost, prqiect finance cost, marketing & sales, administrative expenses, general development cost overhead and developer's contingency/ project contingency. Escalation considered in above estimate is as per developer's assumptions. Total common area cost is bifurcated as per plot area given by Developer. Annexure - A List of Extra I Additional Items executed with cost Not Applicable currently Dated- 31-Mx-25