JITN PAITL B E C I\,/ IL A.12, PANCHRATNA APA RTIV E NT. S.V.P. ROAD, BORIVALI (W), Mumbai-92 [,lobite: 9223351976. Annexure-B FORM -2 EN6INEER'S CERTIFICATE To, M/s. Aristone Builders, Shop No. 747, f42,1't Floor, Bldg. No.3, Vasudev Sky High, Kanakia Road, Mira Road (East), Thane - 401 107 Subject: Certificate of Cost lncurred for Development of ,,THE HYDE pARK- Bldg. No. 1 & 3,, applied for MahaRERA Registration Number being developed by M/s. Aristone Builders. Sir, "l Mr. JITEN PATEL have undertaken assignment of certifying Estimated Cost for ,,THE HYDE PARK- Bldg. No. 1& 3" applied for MahaRERA Registration Number being developed by M/s. Aristone Builders. 2. we have estimated the cost of civil, MEp, and Allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in a8reement of Sale. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by Developer Engineer, and the assumption of the cost of material, Labour and other inputs made by developer, and the site inspection carried out by us to ascertain/ confirm the above analysis given to us. 3. We estimate total Estimated Cost of completion of the aforesaid project under reference as Rs. us cR/- (Total of rable A and B).The estimated rotal cost of project is with reference to the civil, MEP and allied works required for completion of the apartments and for the purpose of obtaining occupation certificate/ completion certificate for the bu ilding(s)/wing(s)/ Layout/Plotted Development from the MBMC (i.e: Mira Bhayander Municipal corporation) being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost Incurred till date is calculated at Rs. NIL/- (Total of Table A and B).The amount of Estimated Cost lncurred is calculated on the base of input materials/ services used and unit cost of these items. 5. The Balance cost of completion of the civil, MEp and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale of the project is estimated at Rs. 17S CR /-. 5. I certify that the Cost of the Civil, MEp and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below JITN PAITL B _E _C lv lt_ A.1 2, PANCHRATNA APARTi/ENT, svP RoAD tt""*tJ,,:1);rl;1J,1,t: rABLEA Building /wlNG/ Layout Plotted Development building bearing Number or called ,THE HYDE PARK- Bldg. No. 1" Sr. No. Pa rticu lars Amounts 1 Total Estimated cost of the Building/Wing/ Layout/ plotted Rs. 145 CR Development as on date of Registration is 2 Cost incurred as on date of certificate NIL 3 Work done in Percentage (as Percentage of the estimated cost) 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 145 CR 5 Cost lncurred on Additional /Extra ltems as on TDR not included Rs. 30 CR in the Estimated Cost (Annexur!-A) as on date TABLE A Building /wlNG/ layout Plotted Development building bearing Number or called ..THE HYDE PARK- Bldg. No. 3" Sr. No. Pa rt icu la rs Amounts 1 Total Estimated cost of the Building/Wing/ Layout/ plotted Rs. 20.50 CR Development as on date of Registration is 2 Cost incurred as on date of certificate NIL Work done in Percentage (as percentage of the estimated cost) 0% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs. 20.50 CR 5 Cost lncurred on Additional /Extra ltems as on TDR not included Rs. 10 CR in the Estimated Cost (Annexure-A) as on date TABTE B lnternal & External Development Works in respect of the Registered phase Sr. No. Particu lars Amounts 1 Iotal Estimated cost of the lnternal and External Development Works including amenities and Facilities in the layout as on date Rs. 9.50 CR of Registration is 2 Cost incurred as on date of certificate Rs. NIL /- Work done in Percentage (as percentage of the estimated cost) 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.9.50 CR 5 Cost lncurred on Additional /Extra ltems not included in the NIL Estimated Cost (Table-C) JIIEN PATTL B E c l\,/ lt_ A.1 2, PANCHBATNA APARTMENT. Yours Fa ithfully S.V.P. BOAD, BOBtVALt (W). Mumbai-92 .JITEN Mobite: 9223351976. SATISHEHAI PATEL Signature of Engineer JITEN. S. I?ATEL ucENC9 N0. P/390/SSI l I Date:08-0{-2026 Agreed and Accepted by: M/s. Aristone Builders, Signature of Promoter / Director Date: 08-01 -2025' Place: MUMBAI Note:- 1. The scope of work is to comprete registered Rear Estate project as per drawings approved from time to time and as per specifications mentioned in agreement of sare. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor whose certificate of quantity calculated can be relied upon by the Engineer. ln case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the prace marked (*) and in case quantity are being calculated should be mentioned at the place marked (*). 3. (**) Balance cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actuar cost incurred (2) due to deviation in quantity required escalation of cost / etc. As this is an estimated cost any deviation in quantity required for development of the Rear Estate project wirr resurt in amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations / qualifications exampre any deviations in input material used from specifications in agreement of sale. TABLE C List of Extra / Additional / Deleted ltems considered in Cost (Which were not parts of the original Estimated of Total Cost) Sr. No List of Extra / Additional / Deleted ltems Amount (Rs) 1 NIL NIL 2 NIL NIL