Ar. Nilesh Mahangade B.Arch Architect |Interior Designer |GRIHA Ar. Pranjali Mahangade M.Arch - Digital Architecture ARCHSIGNO info@archsignoarchitects.co.in GRIHAconsultant ARC HITE CTS +91 73 0404 7878 IMPRovING UNIMPROvED Annexure A FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) 30-09-2025 DATE - 22-09-2025 01-07-2025 (Period: 01-07-2025 ToTo 30-09-2025 22-09-2025) To, M/s PNR GROUP DEVELOPERS Shri Nilesh Bapurao Kadam Room No. 505, D1 Wing, Ushakiran Residency, Kharvai naka, Badlapur East - 421503. Subject: Certificate of Percentage of Completion of construction work of Om Sumukh Darshan Co-op. Hsg. Soc. Having MahaRERA Registration Number P51700077321 being developed by M/sPNR Group Developers Sir, , Mr. Nilesh V. Mahangade have undertaken assignment as Architect of certifying Percentage of Completion of construction work of Om Sumukh Darshan Co-op. Hsg. Soc. Having MahaRERA Registration Number PS1700077321 being developed by M/s PNR Group Developers. Based on Site Inspection, with respect to Layout/ each of the Buildings /Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate,the Percentage of Work done for each of the Buildings / Wing of the Real Estate Project under MahaRERA is as per Table Aherein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. www.archsignoarchitects.co.in Ar. Nilesh Mahangade B.Arch Architect| Interior Designer | GRIHA Ar. Pranjali Mahangade M.Arch- Digital Architecture ARCHSIGNO info@archsignoarchitects.co.in GRIHA consultant +9173 0404 7878 AR CHITECTS IMPROVING UNIMPROVED Table -A Percentage of Actual Work Done Sr. No. Task/Activity (As on date of the (1) (2) Certificate) (3) 1 Excavation 100% 2 Zero number of Basement N.A. 3 One number of Podiums N.A. 6 mn Plinth Stilt/ ground Floor 6 number of Slabs of Super Structure (All SLAB COMPLETED) 100% 100% 100% Internal walls 100% Internal Plaster 100% 7 Flooring within the flats/premises 100% Doors and Windows to each flat/premises 100% Sanitary Fittings within the Flat/Premises 100% Staircases (RCC Work) 100% Lift Wells (RCC Work) and Lobbies at each Floor level 100% Overhead Water Tank 100% Underground Water Tanks 100% External plumbing 100% External plaster 100% 10 Elevation 100% Completion of terraces with waterproofing of the Building Wing. 100% Installation of lifts 90% Water pumps 100% Fire Fighting Fittings and Equipment's as per CFO NOC N.A. Electrical fittings 100% Mechanical equipment N.A. Compliance to conditions of environment/ CRZ NOC N.A. 11 Finishing to entrance lobby's 100% Plinth protection 100% Paving of areas appurtenant to Building / Wing 90% Compound Wall and all other requirements as may be required to complete project as per specification in agreement of sale, Any 90% other activities www.archsignoarchitects.co.in Ar. Nilesh Mahangade B.Arch Architect | Interior Designer |GRIHA Ar. Pranjali Mahangade M.Arch - Digital Architecture GRIHAconsultant ARCHSIGNO info@archsignoarchitects.co.in AR CHIT ECTS +9173 0404 7878 IMPROVING UNIM PROVED Table B Common Areas (Internal &External Development Works) in Respect of the Entire Registered Phase Percentage of Actual SNo Common Areas and Facilities Proposed Work done Details (1) (2) (Yes/No) (Ason date of the (5) (3) certificate) (4) Internal Roads & Footpaths No 0% N.A. MJP get connection 2 Water Supply Yes 0% after O.C 3 Sewerage (chambe, lines, Septic Tank, STP) Yes 100% Work Complete 4 Strom Water Drains No 0% N.A. Landscaping &Tree Planting No 0% N.A. 6 Street Lighting Yes 100% Provided by KBMC 7 Community Buildings No 0% N.A. 8 Treatment and disposal of No 0% N.A. sewage and sullage water Solid Waste management & No 0% N.A. Disposal 10 Water conservation, No Rain Water harvesting 0% Rainwater harvesting Work not yet started 11 Energy management No 0% N.A. 12 Fire protection and fire safety No 0% N.A. requirements 13 Electrical meter room, sub Yes 0% Meter room provided station, receiving station Work not yet started Aggregate area of 14 No 0% N.A. recreational open space 15 Open parking No 0% N.A. Specify if any further facility is 16 provided (other than above No 0% N.A. mentioned) Yours Faithfully Agreed and Accepted by: AR. NILESH V. MAHANGADEVA Name: MR. NILESH BAPURAO KADAM. CA/2017/89343 Date: - www.archsignoarchitects.co.in