Chetan J. Trivedi B.E. Civil, M.Tech-structures (COEP) Chartered Engineer, AMIE, AMISSE D DESCON Kaustubh R.Shingte ENGLNEEk5 B.E. Civil, M.Tech-structures (COEP) Chartered Engineer, AMIE, AMISSE FORM-2 ENGINEER'S CERTIFICATE of Ongoing Project and for withdrawal of (To be submitted at the time of Registration Building/Wing wise) Money from Designated Account - Date: 22 November 2025 To, Shri. Vilas Anand Patil & Smt. Hemlata Vilas Patil SHAHBAZ - BELAPUR, NAVIMUMBAI building, for SUNCITY PRIDE Subject:Certificate of Cost incurred for development of situated on the C.T.S. NO. - 161, construction work (Maha RERA Registration Number) SHAHBAZ BELAPUR, TAL. THANE, DIST.-THANE, KILLE GAOTHAN, N. M Being developed by M/S. SUNCITY PRIDE. Ref. Maha RERA Registration Number P51700077303 Sir, 1. I, Kaustubh Shingte for Descon Engineershave undertaken assignment of certifying Estimated Cost for M/S. SUNCITY PRIDE having Maha RERA Registration Number P51700077303 (Only Applicable after project Registration) being developed M/S. SUNCITY PRIDE. 2. We have estimated the cost of the Civil, MEP and Allied works required for completion external work of the of the apartments and proportionate completion of internal & estimated cost project as per specification mentioned in agreement of sale. Our calculations are based on the drawings/plans made available to us for the project under reference by the developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Descon Engineers, Quantity Surveyor appointed by Developer / Engineer. The assumption of cost of material, labour and other inputs made by developer; and the site inspection carried out by us to ascertain /confirm the above analysis given to us. ADDRESS: S-04D, HAWARE CENTURION MALL, Nr. SEAWOODS, DARAWE STATION (E), NAVI MUMBAI- 400706. Email: desconengineersl @gmail.comMob.: +91 7387624664, +91 8097707342 Chetan J. Trivedi B.E. Civil, M.Tech-structures (COEP) Chartered Engineer, AMIE,AMISSE Kaustubh R. Shingte DESCON B.E.Civil, M.Tech-structures (COEP) ENGINEERS Chartered Engineer, AMIE, AMISSE DESIGING YoUR CONSTRUCTION ..2. 3. We estimate Total Estimated Cost of completion of the M/S. SUNCITY PRIDE building of the aforesaid project under reference as Rs. 2,70,00,000/- (Total of Table A&B). The estimated total cost of project is with reference to the Civil, MEP &allied works required to be completed for the purpose of obtaining Occupation Certificate/ Completion Certificate for the building(s) from The Town Planning Officer, Bldg. Permission Dept, Raigad Bhavan, C.B.D. Belapur, Navi Mumbai, being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated cost Incurred tilldate is calculated at Rs. 1,49,50,000 /- (Total of Table A & B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance Cost of Completion of civil, MEP &Alied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from The Town Planning Officer, Bldg. Permission Dept, Raigad Bhavan, C.B.D. Belapur, Navi Mumbai, is estimated at Rs. 1,20,50,000/- (Total of Table A&B). 6. Icertify that the cost of the Civil, MEP &Allied work for the aforesaid Project as completed on the date of this certificate is as given in Table- A and Table - Bbelow TABLE A M/S. SUNCITY PRIDE building Project. Sr. Particulars Amounts No Total Estimated cost of the building/wing 1 as on date of Registration is Rs. 2,30,00,000/ Cost3 incurred as on 22 November 2025 2 Rs. 1,49,50,000/ (based on the Estimated cost) Work done in Percentage 3 65% (as Percentage of the estimated cost) Balance Cost to be Incurred 4 Rs. 80,50,000/ (Based on Estimated Cost) Cost Incurred on Additional /Extra Items 5 as on 22 November 2025 not included in Nil the Estimated Cost (Annexure A) ADDRESS: O ENG S-04D, HAWARE CENTURION MALL, Nr. SEAWOODS, DARAWE STATION (E), NAVI MUMBAI- 400706. Email: desconengineers l @gmail.comMob.:+91 7387624664, +91 8097707342 Chetan J. Trivedi B.E. Civil, M.Tech-structures (COEP) Chartered Engineer, AMIE, AMISSE Kaustubh R.Shingte DESCON B.E. Civil, M.Tech-structures (COEP) NGINEERS Chartered Engineer, AMIE, AMISSE OESIGANG rOUR CONSTRUCTION ..3.. TABLE B. Sr. Amounts Particulars No Total Estimated cost of the Internal and External the 40,00,000 / 1 Development Works including amenities and Facilities in layout as on date of Registration is Cost incurred as on 22 November 2025 0/ 2 (based on the Estimated cost) Work done in Percentage 0.0% (as Percentage of the estimated cost) 3 Balance Cost to be Incurred 40,00,000/ 4 (Based on Estimated Cost) Items Cost Incurred on Additional /Extra Nil included in 5 as on 22 November 2025 not the Estimated Cost (Annexure A) Your's Faithfully, For, Descon EngineerON EN Mr.Kaustubh Shingte M.Tech. Structures (COEP License No. :-NMMC/TPO/SE325 ADDRESS: SEAWOODS, CENTURION MALL, Nr. S-04D, HAWARE MUMBAI- 400706. NAVI 8097707342 DARA WE STATION (E),(@gmail.com Mob.: +91 7387624664, +9 1 Email: desconengineers I Chetan J. Trivedi B.E. Civil, M.Tech-structures (COEP) Chartered Engineer, AMIE, AMISSE Kaustubh R. Shingte DESCON B.E. Civil, M.Tech-structures (COEP) ENGINEERS Chartered Engineer, AMIE, AMISSE DESIGNING YOUR CONSTRUCTION .4.. Note 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned at the place marked 2. () Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (") 3. () Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost () and Actual Cost incurred (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of thc Real Estate Project will result in amendment of the cost incurred / to be incurred. 4. All components of work with specifications are indicative and non-exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional/ Deleted items considered in Cost (Which were not parts of the original Estimate of Total Cost) Sr. Amount No List of Extra/Additional / Deleted items (InRs) 1 2 3 ADDRESS: S-04D, HAWARE CENTURION MALL, Nr. SEAWOODS, DARA WESTATION (E), NAVIMUMBAI- 400706. Email: desconengineersl@gmail.com Mob.: +91 7387624664, +918097707342