ATELIER ARCH|TECT & ASSoCIATES Date:12/07/2025. FORM 1. ARCHITECT'S CERTIFICATE. To. SHRI. VILAS A. PATIL &OTHER 1, THROUGH ITS DEVELOPMENT RIGHTS AND P.O. A. HOLDER M/S. SUNCITY PRIDE, THROUGHITS AUTHORIZED PARTNER, SHRI. SATISH A. THAKUR &OTHER - 1. CIS NO: 161,SECTOR - 32,BELAPUR, N, M. SUBJ.. CERTIFICATE OF PERCENTAGE OF COMPLETION OF CONSTRUCTION WORK OF 1 NO. (CONSISTING STANDALONE BUILDING) OF RESIDENTIAL BUILDING AS "SUNCITY PRIDE"- APARTMENT - THE PROJECT MAHARERA REGISTRATION # P51ZO0077303. SITUATED ON THE CTS NO, - 162 TO THE NORTH, CTS NO. -143TO THE SOUTH, CTS NO: 160 TO THE WEST &6.0 M WIDE ROAD TO THE EAST, OF DIVISION -, PLOT BEARING CTS NO.- 161,KILLE GAOTHAN, SHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA (FSI - 1.5), TO BE DEVELOPED BY M/S. SUNCITY PRIDE. SIR/MADAM, I, SHRI. ANIL H. SAKARIA (JAIN), OF M/S. ATELIER ARCHITECT & ASSOCIATES, HAVE UNDERTAKEN ASSIGNMENT AS AN "ARCHITECT" OF CERTIFYING PERCENTAGE OF CONSTRUCTION WORK OF BUILDING OF THE PROJECT, SITUATED ON THE PLOT BEARING CTS NO. - 161, KILLE GAOTHAN SHAHBAZ, BELAPUR, N, M., ADMEASURING 438.50 S. M. PLOT AREA BEING DEVELOPED BY M/S. SUNCITY PRIDE. BASED ON SITE INSPECTION, WITH RESPECT TO EACH OFTHE BUILDING OF THE AFORESAID REAL ESTATE PROJECT, ICERTIFY THAT AS ON THE DATE OF THIS CERTIFICATE, THE PERCENTAGE OF WORK DONE FOR EACHOF THE BUILDING OF THE REAL ESTATE PROJECT AS REGISTERED VIDE NUMBER (PROPOSED) WORK EXECUTED UNDER MAHARERA IS AS PER TABLE A HEREIN BELOW. THE PERCENTAGE OF THE WITH RESPECT TO EACH OF THE ACTIVITY OF THE ENTIRE PHASE IS DETAILED IN TABLE B. P.T.O... Ar. ANIL H. SAKARIA (JAIN) (Architect) CA/ 2004 | 32813 9 Trimurti Apt. Own. Association, NL-6/17/0:4, Sec - 15, Nerul, N.M. 400706. atelierarchitect.a@gmail.com 98193761 05 | 9322664188 - 2 - TABLE -A. SINGLE BUILDING /SINGLE WING NUMBER: - STAND - ALONE BUILDING. (TO BE PREPARED SEPARATELY FOR EACH BUILDING /WING OF THE PROJECT). SR. NO. TASKS /ACTIVITY. PERCENTAGE OF WORK DONE. 1. EXCAVATION: 75.00% 2. 000.00% NO/NUMBER OF BASEMENT(S) AND PLINTH: 3. NO/NUMBER OF PODIUMS: NOT PROPOSED. 4. RCC WORK PARTLY STILT/GROUND FLOOR: 75.00% 5. NUMBER OF RCC SLABS LEVELS OF SUPER STRUCTURE: 80.00% (HABITABLE FLOORS) 6. INTERNAL WALLS, INTERNAL PLASTER, FLOORINGS WITHINFLATS/PREMISES, DOORS AND WINDOWS TO EACH OF THE FLAT/PREMISES: 60.00% 7. SANITARY FITTINGS WITHIN THE FLAT/PREMISES, ELECTRICAL FITTINGS WITHIN THE FLAT/PREMISES: 000.00% 8 STAIRCASES, LIFTS WELLS AND LOBBIES AT EACH FLOOR LEVEL CONNECTING STAIRCASES AND LIFTS, OVERHEAD AND UNDERGROUND WATER TANKS: 000.00% 9 THE EXTERNAL PLUMBING ANDEXTERNAL PLASTER, ELEVATION, COMPLETION OF TERRACES WITH WATERPROOFING OF THE BUILDING/WING: 000.00% 10. INSTALLATION OF LIFTS, WATER PUMPS, FIREFIGHTING FITTINGS AND EQUIPMENT AS PER CFO NOC, ELECTRICAL FITTINGS TO COMMON AREAS, ELECTRO, MECHANICAL EQUIPMENT, COMPLIANCE TO CONDITIONS OFENVIRONMENT/CRZ NOC, FINISHING TOENTRANCE LOBBY/S, PLINTH PROTECTION, PAVING OF AREAS APPURTENANT TO BUILD0NG/WING, COMPOUND WALL AND ALL OTHER REQUIREMENTS AS MAY BE REQUIRED TO OBTAIN OCCUPATION/ COMPLETIONCERTIFICATE: 000.00% ALANH H SAKARIA(JAIN) (Architect) P.T.O... CAI 2004 /32813 TABLE - B. INTERNAL &EXTERNAL DEVELOPMENTWORKS IN RESPECIOF THEENTIRE REGISTERED PHAS. SR, # COMMON AREAS AND FACILITIES, PROPOSED PROPOSED DETAILS. AMENITIES YES/NO. DONE. 1 INTERNAL ROADS & FOOT PATHS NOT NO. APPLICABLE. WATER SUPPLY YES NO. SHALL BE CONNECTED AFTER OBTAINING O.C. 3 SEWERAGE(CHAMBER, LINES,SEPIC YES NO. WILL BE EXECUTED TANK, STP) WHILE OBTAINING THE O.C. 4 STORM WATER DRAINS YES NO. WILL BE EXECUTED WHILE OBTAINING THE O.C. 5. LANDSCAPING &TREE PLANTING YES NO. ONLY 6.0 TREES SHALL BE PLANTED. 6 STREET LIGHTING NO. NOT APPLICABLE 7 COMMUNITY BUILDINGS NO. NO. 8 TREATMENT AND DISPOSAL OF NO. NO. SEWAGE AND SULLAGE WATER 14 9 SOLID WASTE MANAGEMENT & NO. NOT DISPOSAL APPLICABLE 10. WATER CONSERVATION, RAIN WATER YES NO. HARVESTING 11. ENERGY MANAGEMENT NO. NO. 12. FIRE PROTECTION AND FIRE SAFETY NO. NO NOT APPLICABLE. REQUIREMENTS 13. ELECTRICAL METER ROOM, SUB YES NO. STATION, RECEIVING STATION 14. OTHERS OPTION TO ADD MORE) NIL - NIL - THANKING YOU, YOURS FAITHFULLY, Ar. ANILH. SAKARI (JAIN) AR. ANIL H. SAKARIA (JAIN). (Architect) (ARCHITECT.) CA/2004/32813 CA/2004/32813. FOR, SHRI. VILAS A. PATIL & OTHER 1 THROUGHITSDEVELOPMENT RIGHTS AND P. O. A. HOLDER, M/S. SUNCITY PRIDE, THROUGH ITS AUTHORIZED PARTNER/S SHRI. SATISH A. THAKUR& OTHER.