ATELIER ARCHITECT AASsocIATES Date: 19/10/2024. FORM 1. ARCHITECT'S CERTIFICATE. To, SHRI. VILAS A. PATIL &OTHER 1, THROUGH ITS DEVELOPMENT RIGHTS AND P. O. A. HOLDER, M/S. SUNCITY PRIDE, THROUGH ITS AUTHORIZED PARTNER/S, SHRI. SATISH A. THAKUR &OTHER-1. CTS NO: 161,SECTOR - 32, BELAPUR, N. M. SUBJ.: CERTIFICATE OF PERCENTAGE OF COMPLETION OF CONSTRUCTION WORK OF 1 NO. (CONSISTING STAND ALONE BUILDING) OF RESIDENTIAL BUILDING AS "SUNCITY PRIDE" -APARTMENT - THE PROJECT MAHARERA REGISTRATION # P51700077303, SITUATED ON THE CTS NO. - 162 TO THE NORTH, CISNO.- 143 TO THESOUTH, CTSNO: 160TO THE WEST &6.0 MWIDE ROAD TO THE EAST, OF DIVISION -, PLOT BEARING CISNO,- 161, KILLE GAOTHAN, SHAHBAZBELAPUR, N.M. ADMEASURING 438.50 S. M. AREA (FSI- 1.5), TO BE DEVELOPED BY M/S. SUNCITY PRIDE. SIR/MADAM, I. SHRI. ANIL H. SAKARIA (JAIN), OF M/S. ATELIER ARCHITECT & ASSOCIATES, HAVE UNDERTAKEN ASSIGNMENT AS AN "ARCHITECT" OF CERTIFYING PERCENTAGE OF CONSTRUCTION WORK OF BUILDING OF THE PROJECT, SITUATED ON THE PLOT BEARING CTS NO. - 161, KILLE GAOTHAN SHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA BEING DEVELOPED BY M/S.SUNCITY PRIDE. BASED ONSITE INSPECTION,WITH RESPECTTO EACHOF THE BUILDING OFTHEAFORESAID REAL ESTATE PROJECT, ICERTIFY THAT AS ON THE DATE OF THIS CERTIFICATE, THE PERCENTAGE OF WORK DONE FOR EACH OFTHE BUILDING OF THE REAL ESTATE PROJECT AS REGISTERED VIDE NUMBER (PROPOSED) UNDER MAHARERA IS AS PER TABLE A HEREIN BELOW, THE PERCENTAGE OF THE WORK EXECUTED WITH RESPECT TO EACH OF THE ACTIVITY OF THE ENTIRE PHASE IS DETAILED IN TABLE B. P.T.O... Ar. ANIL H. SAY CAI 2004 1 J - 2 TABLE - A. STANDALONE BUILDING. SINGLE BUILDING/SINGLE WING NUMBER: - BUILDING /WING OF THE PROJECT). (TO BE PREPARED SEPARATELY FOR EACH PERCENTAGE OF WORK SR. NO. TASKS /ACTIVITY. DONE. 75.00% 1. EXCAVATION: 000.00% 2. NO/NUMBER OF BASEMENT(S) AND PLINTH: NOT PROPOSED. 3. NO/NUMBER OF PODIUMS: 75.00% 4. RCC WORK PARTLY STILT/GROUND FLOOR:STRUCTURE: 35.00% SUPER 5. NUMBER OF RCC SLABS LEVELS OF PLASTER, FLOORINGS 6. INTERNAL WALLS, INTERNAL WITHIN FLATS/PREMISES, DOORS AND WINDOWS 10.00% TOEACH OF THE FLAT/PREMISES: FLAT/PREMISES, 7. SANITARY FITTINGS WITHIN THE FLAT/PREMISES: 000.00% ELECTRICAL FITTINGS WITHIN THE LOBBIES AT EACH 8. STAIRCASES, LIFTS WELLS AND STAIRCASES AND LIFTS, FLOOR LEVEL CONNECTING 000.00% OVERHEAD AND UNDERGROUND WATER TANKS: EXTERNAL PLASTER, 9. THE EXTERNAL PLUMBING AND ELEVATION, COMPLETION OF TERRACES WITH WATERPROOFING OF THE BUILDING/WING: 000.00% FIREFIGHTING FITTINGS 10. INSTALLATION OF LIFTS, WATER PUMPS, FITTINGS AND EQUIPMENT AS PER CFO NOC, ELECTRICAL TOCOMMON AREAS, ELECTRO, MECHANICAL EQUIPMENT, COMPLIANCE TO CONDITIONS OF ENVIRONMENT/CRZ NOC, FINISHING TO ENTRANCELOBBY/S, PLINTH PROTECTION, PAVING OF AREAS APPURTENANT TO BUILDING/WING, COMPOUND WALL AND ALL OTHER REQUIREMENTS AS MAY BE REQUIRED TO OBTAIN OCCUPATION/ COMPLETION CERTIFICATE: 000.00% P.T.O.. Ar. ANILH SAKARIA(JAIN) (Architect) CA/ 2004/32813 3 TABLE - B. INTERNAL & EXTERNAL DEVELOPMENT WORKS IN RESPECT OFTHE ENTIRE REGISTERED PHASE. PROPOSED PROPOSED DETAILS. SR, # COMMON AREAS AND FACILITIES, AMENITIES YES/NO. DONE. INTERNAL ROADS & FOOT PATHS NO. NOT 1. APPLICABLE. NO. SHALL BE 2. WATER SUPPLY YES CONNECTED AFTER OBTAINING O.C. WILL BE EXECUTED 3 SEWERAGE (CHAMBER, LINES, SEPTIC YES NO. WHILE OBTAINING TANK, STP) THE O.C. NO. WILL BE EXECUTED 4 STORM WATER DRAINS YES WHILE OBTAINING THE O.C. 5. LANDSCAPING& TREE PLANTING YES NO. ONLY 6.0TREES SHALL BE PLANTED. 6 STREET LIGHTING NO. NOT APPLICABLE 7 COMMUNITY BUILDINGS NO. NO. 8 TREATMENT AND DISPOSAL OF NO. NO. SEWAGE AND SULLAGE WATER 14 9 SOLID WASTE MANAGEMENT & NO. NOT DISPOSAL APPLICABLE 10. WATERCONSERVATION, RAIN WATER YES NO. HARVESTING 11. ENERGY MANAGEMENT NO. NO. 12. FIRE PROTECTION ANDFIRE SAFETY NO. NO NOT APPLICABLE. REQUIREMENTS 13. ELECTRICAL METER ROOM, SUB YES NO. STATION, RECEIVING STATION |4 OTHERS OPTION TO ADD MORE) NIL NIL - THANKING YOU, YOURS FAITHFULLY, Ar-ANILH SAKARIA(JAIN) AR. ANIL H. SAKARIA (JAIN). (Architect) (ARCHITECI). CA/2004/32813. CAI 2004 /32813 NAME: FOR, SHRI. VILAS A. PATIL & OTHER 1 THROUGHIIS DEVELOPMENT RIGHTS AND P.O. A. HOLDER, M/S.SUNCITY PRIDE, THROUGH ITS AUTHORIZED PARTNER/S, SHRI. SATISH A. THAKKUR & OTHER. DATE: 19/10/2024. ATELIER ARCH|TECT &ASsocIATES Date: 10/01/2025. FORM 1. ARCHITECT'S CERTIFICATE. To. SHRI, VILAS A. PATIL & OTHER 1, THROUGH ITS DEVELOPMENT RIGHTS AND P. O. A. HOLDER, M/S. sUNCITY PRIDE, THROUGH ITS AUTHORIZED PARTNER, SHRI. SATISH A. THAKUR8& OTHER-1. CTS NO: 161, SECTOR - 32, BELAPUR, N. M. SUBJ.: CERTIFICATE OF PERCENTAGE OF COMPLETION OF CONSTRUCTION WORK OF 1 No. (CONSISTING STAND ALONE BUILDING) OF RESIDENTIAL BUILDING AS "SUNCITY PRIDE" - APARTMENT - THE PROJECT MAHARERA REGISTRATION # P51700077303, SITUATED ON THE CTS No.- 162 TOTHE NORTH, CTS NO. - 143 TO THE SOUTH, CTS NO: 160 TO THE WEST &. 6.0 MWIDE ROAD TO THE EAST, OF DIVISION-, PLOT BEARING CTS NO.- 161, KILLE GAOTHAN, SHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA (FSI - 1.5), TO BE DEVELOPED BY M/S. SUNCITY PRIDE. SIR/MADAM, I, SHRI. ANIL H. SAKARIA (JAIN), OF M/S. ATELIER ARCHITECT & ASSOCIATES, HAVE UNDERTAKEN ASSIGNMENT AS AN "ARCHITECT" OF CERTIFYINGPERCENTAGE OF CONSTRUCTION WORK OF BUILDING OF THE PROJECT, SITUATED ON THE PLOT BEARING CTS NO. - 161, KILLE GAOTHAN SHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA BEING DEVELOPED BY M/S.SUNCITY PRIDE. BASED ONSITE INSPECTION, WITH RESPECTTO EACH OFTHE BUILDING OF THE AFORESAID REAL ESTATE PROJECT, ICERTIFY THAT AS ON THE DATE OF THIS CERTIFICATE, THE PERCENTAGE OF WORK DONE FOREACH OFTHE BUILDING OF THE REAL ESTATE PROJECT AS REGISTERED VIDE NUMBER (PROPOSED) UNDER MAHARERA IS AS PER TABLE A HEREIN BELOW, THE PERCENTAGE OF THE WORK EXECUTFD WITHRESPECT TO EACH OFTHE ACTIVITY OF THE ENTIRE PHASE IS DETAILED IN TABLE B. P.T.O... ArANL H.SAKARIA (JAIN) (Architect) CAI2004 /32813 9Trimurti Apt. Own. ASsociation, NL-6/17/0:4, Sec - 15, Nerul, N.M, 400706. atelierarchitect.a @gmail.com 9819376105 | 93226641 88 2 TABLE -A. BUILDING. SINGLE BUILDING /SINGLE WING NUMBER: - STAND- ALONE THE PROJECT). (TO BE PREPARED SEPARATELY FOR EACH BUILDING /WING OF PERCENTAGE OF WORK SR. NO. TASKS /ACTIVITY. DONE. 1. EXCAVATION: 75.00% 2. NO/NUMBER OF BASEMENT(S) AND PLINTH: 000.00% 3. NOJNUMBER OF PODIUMS: 000.00% 4. RCOC WORK PARTLY STILT/GROUND FLOOR: 75.00% 5. NUMBER OF RCC SLABS LEVELS OF SUPER STRUCTURE: 45.00% 6. INTERNAL WALLS, INTERNAL PLASTER, FLOORINGS WITHIN FLATS/PREMISES, DOORS AND WINDOWS TO EACH OF THE FLAT/PREMISES: 20.00% 7. SANITARY FITTINGS WITHIN THE FLAT/PREMISES, ELECTRICAL FITTINGS WITHIN THE FLAT/PREMISES: 000.00% STAIRCASES, LIFTS WELLSAND LOBBIES AT EACH FLOOR LEVEL CONNECTING STAIRCASES AND LIFTS, 8. OVERHEAD AND UNDERGROUNDWATER TANKS: 000.00% 9. THE EXTERNAL PLUMBING AND EXTERNAL PLASTER, ELEVATION, COMPLETION OF TERRACES WITH WATERPROOFING OF THE BUILDING/WING: 000.00% 10. INSTALLATIONOF LIFTS, WATER PUMPS, FIREFIGHTING FITTINGS AND EQUIPMENT AS PER CFONOC, ELECTRICAL FITTINGS TO COMMON AREAS, ELECTRO, MECHANICAL EQUIPMENT, COMPLIANCE TO CONDITIONS OF ENVIRONMENT/CRZ NOC, FINISHING TO ENTRANCE LOBBY/S, PLINTH PROTECTION, PAVING OFAREAS APPURTENANT TO BUILDING/WING, COMPOUND WALL AND ALL OTHER REQUIREMENTS AS MAY BE REQUIRED TO OBTAIN OCCUPATION/ COMPLETION CERTIFICATE: 000.00% Ar. ANIL H AKARIA(JAIN) TArhitect) CÁI2004 /32813 P.T.O... 3 TABLE - B. INTERNAL &EXTERNAL DEVELOPMENT WORKS IN RESPECT OF THE ENTIRE REGISTERED PHASE. SR, # COMMON AREAS AND FACILITIES, PROPOSED PROPOSED DETAILS. AMENITIES YES/NO. DONE. INTERNAL ROADS & FOOT PATHS NO. NOT APPLICABLE. 2 WATER SUPPLY YES NO. SHALL BE CONNECTED AFTER OBTAINING O.C. 3 SEWERAGE (CHAMBER, LINES, SEPTIC YES NO. WILL BE EXECUTED TANK, STP) WHILE OBTAINING THE O.C. STORM WATER DRAINS YES NO. WILL BE EXECUTED WHILE OBTAINING THE O.C. 5 LANDSCAPING & TREE PLANTING YES NO. ONLY 6.0 TREES SHALL BE PLANTED. STREET LIGHTING NO. NOT APPLICABLE 7 COMMUNITY BUILDINGS NO. NO. 8 TREATMENT AND DISPOSAL OF NO. NO. SEWAGE AND SULLAGE WATER 14 9 SOLID WASTE MANAGEMENT & NO. NOT DISPOSAL APPLICABLE 10. WATER CONSERVATION, RAIN WATER YES NO. HARVESTING 11. ENERGY MANAGEMENT NO. NO. 12. FIRE PROTECTION AND FIRE SAFETY NO. NO NOT APPLICABLE. REQUIREMENTS 13. ELECTRICAL METER ROOM, SUB YES NO. STATION, RECEIVING STATION 14. OTHERS OPTION TO ADD MORE) NIL NIL - THANKING YOU, YOURS FÁITHFULLY, Ar A RIA(JAIN) AR. ANIL H. SAKARIA (JAIN). itect) (ARCHITICI) Ci cu04732813 CA/2004/(2813. FOR, SHRI. VILAS A. PATIL & OTHER-1 THROUGHIS DEVELOPMENTRIGHTS AND P.O.A. HOLDER M/S.SUNCITY PRIDE, TuDOUGHIS AUTHORIZED ARINER/S, SHRI. SATISH A. THAKUR &OTHER. DATE: 10/01/2025. NOIIon, NL-6/17/0:4, Sec- 15, Nerul, N.M. 400706. atelierarchitect.a@gmail.com 9819376105 | 9322664188 Actelierarchitect.a@gmail.com 9819376105 | Y3220o4100 ATELIER ARCHITECT & ASSOcIATE$ Date: 08/04/2025. FORM1. ARCHITECT'S CERTIFICATE. To, SHRI. VILAS A. PATIL &OTHER 1, THROUGH ITS DEVELOPMENT RIGHTS AND P.O.A. HOLDER M/S. SUNCITY PRIDE, THROUGH ITS AUTHORIZED PARTNER, SHRI, SATISH A. THAKUR & OTHER- 1. CIS NO: 161, SECTOR -32, BELAPUR, N, M. SUBJ.: CERTIFICATE OF PERCENTAGE OF COMPLETION OF CONSTRUCTION WORK OF I NO. (CONSISTING STAND ALONE BUILDING) OF RESIDENTIAL BUILDING AS "SUNCITY PRIDE" - APARTMENT - THE PROJECT MAHARERA REGISTRATION # PS1700077303, SITUATED ON THE CTS NO. - 162 TO THE NORTH, CTSNO, - 143 TO THE SOUTH,CTS NO: 160TO THE WEST &6.0 MWIDE ROAD TO THE EAST, OF DIVISION -, PLOT BEARINGCTS NO,- 16l, KILLE GAOTHAN,SHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA (FSI 1.5), TO BE DEVELOPED BY M/S. SUNCITY PRIDE. SIR/MADAM, I, SHRI. ANIL H. SAKARIA (JAIN), OF M/S. ATELIER ARCHITECT & ASSOCIATES, HAVE UNDERTAKEN ASSIGNMENT AS AN "ARCHITECT" OF CERTIFYING PERCENTAGE OF CONSTRUCTION WORK OF BUILDING OF THE PROJECT, SITUATED ON THE PLOT BEARING CTS NO. - 161, KILLE GAOTHANSHAHBAZ BELAPUR, N.M. ADMEASURING 438.50 S. M. AREA BEING DEVELOPED BY M/S. SUNCITY PRIDE. BASED ON SITE INSPECTION, WITH RESPECT TO EACHOF THE BUILDING OF THE AFORESAID REAL ESTATE PROJECT, ICERTIFY THAT AS ON THE DATE OF THIS CERTIFICATE, THE PERCENTAGE OF WORK DONE FOR EACH OFTHE BUILDINGOF THE REAL ESTATE PROJECT AS REGISTERED VIDE NUMBER (PROPOSED) UNDER MAHARERA IS AS PER TABLE A HEREIN BELOW. THE PERCENTAGE OF THE WORK EXECUTED WITH RESPECT TO EACH OF THE ACTIVITY OF THE ENTIRE PHASE IS DETAILED IN TABLE B. P.I.O... SAKARIA (JAIN) Ar. ANIL H. Archlect) EAT2004 / 32813 9 Trimurti Apt. Own. Association, NL-6/17/0:4, Sec - 15, Nerul, N.M. 400706. atelierarchitect.a@gmail.com 9819376105 | 9322664188 t.awyuv 2 TABLE - A. STANDALONE BUILDING. SINGLE BUILDING/SINGLE WING NUMBER:- BUILDING /WING OF THE PROJECI). (TO BE PREPARED SEPARATELY FOR EACH PERCENTAGE OF WORK SR. NO. TASKS /ACTIVITY. DONE. 75.00% 1, EXCAVATION: 000.00% 2. NO/NUMBER OF BASEMENT(S) AND PLINTH: 000.00% 3. NO/NUMBER OF PODIUMS: 75.00% 4. RCCWORK PARTLY STILT/GROUND FLOOR: 80.00% OF SUPERSTRUCTURE: 5. NUMBER OF RCC SLABS LEVELS PLASTER, FLOORINGS 6. INTERNAL VWALLS, INTERNAL AND WINDOWS WITHIN FLATS/PREMISES, DOORS 30.00% TO EACH OF THE FLAT/PREMISES: FLAT/PREMISES, 7. SANITARY FITTINGS WITHIN THE 000.00% FLAT/PREMISES: ELECTRICAL FITTINGS WITHIN THE LOBBIES AT EACH 8. STAIRCASES, LIFTS WELLS AND LIFTS, STAIRCASES AND FLOOR LEVEL CONNECTING 000.00% OVERHEADAND UNDERGROUND WATER TANKS: EXTERNAL PLASTER, 9. THE EXTERNAL PLUMBING AND TERRACES WITH ELEVATION, COMPLETION OF 000.00% WATERPROOFING OF THE BUILDING/WING: PUMPS, FIREFIGHTING FITTINGS 10. INSTALLATION OF LIFTS, WATER ELECTRICAL FITTINGS AND EQUIPMENT AS PERCFO NOC, EQUIPMENT, TOCOMMON AREAS, ELECTRO, MECHANICAL ENVIRONMENT/CRZ NOC, COMPLIANCE TO CONDITIONSOF PROTECTION, FINISHING TO ENTRANCE LOBBY/S, PLINTH BUILDING/WING, PAVING OF AREAS APPURTENANT TO COMPOUND WALL AND ALL OTHER REQUIREMENTS AS MAY BE REGQUIRED TO OBTAIN OCCUPATION/ COMPLETION CERTIFICATE: 000.00% Ar. ANIL HSAKARIA(JAIN) AATchitect) CA/2004/32813 P.T.O... 3 TABLE- B. INTERNAL &EXTERNAL DEVELOPMENT WORKS IN RESPECIOF THE ENTIRE REGISTERED PHASE. SR. # COMMON AREAS AND FACILITIES, PROPOSED PROPOSED DETAILS. AMENITIES YES/NC. DONE. INTERNAL ROADS & FOOT PATHS NO. NOT APPLICABLE. 2 WATER SUPPLY YES NO. SHALL BE CONNECTED AFTER OBTAINING O.C. 3 SEWERAGE (CHAMBER, LINES, SEPTIC YES NO. WILL BE EXECUTED TANK, STP) WHILE OBTAINING THE O.C. 4. STORM WATER DRAINS YES NO. WILL BE EXECUTED WHILE OBTAINING THE O.C. 5. LANDSCAPING & TREE PLANTING YES NO. ONLY 6.0 TREES SHALL BE PLANTED. 6. STREET LIGHTING NO. NOT APPLICABLE 7. COMMUNITY BUILDINGS NO. NO. 8 TREATMENT AND DISPOSAL OF NO. NO. SEWAGE AND SULLAGE WATER 14 SOLID VWASTE MANAGEMENT & NO. NOT DISPOSAL APPLICABLE 10 WATER CONSERVATION, RAIN WATER YES NO. HARVESTING 11. ENERGY MANAGEMENT NO. NO. 12. FIRE PROTECTION AND FIRE SAFETY NO. NO NOT APPLICABLE. REQUIREMENTS 13. ELECTRICAL METER ROOM, SUB YES NO. STATION, RECEIVING STATION 14. OTHERS OPTIONTO ADD MORE) NIL - NIL - THANKING YOU, YOURS FAITHFULLY, Ar. ANILH. AR. ANIL H. SAKARIA (JAIN). SAKARIA (JAIN) (ARCHITECT.) (Architect) CAI2004 / CA/2004/32813. 32813 NAME: FOR, SHRI. VILAS A, PATIL & OTHER - 1. THROUGH ITS DEVELOPMENI RIGHIS AND P. O. A. HOLDER, M/S. SUNCIIY PRIDE THROUGHIS AUTHORIZED PARINER/S, SHRI. SATISH A. THAKUR & OTHER DATE:08/04/2025.