FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE I (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date:04.06.2025 To, The JAi BHAWANI ORCHID INFRA LLP Kalher (CT), Bhiwandi, Thane, 421302 Quality Assuranc e Certificate (Certificate No.... :..................for the Y~ar Ending March 2025) 1 Subj(!Ct : Certificate for quality of materials used and quality of Construction and workmanship of the work of Vivanta Bliss Phase II having MahaRERA Registration Number P51700076999 being developed by JAi BHAWANI ORCHID INFRALLP Sir, I/We .t:J.i.~nl.~!!L....... have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the developme~t permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and/ or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Parameters Yes/No Remarks Sr. No. I ' ti,.. 1 - ~ Whether soil investigations of the site has been Yes 1 conducted before the structural design and soil . parameters have been accounted for in the structural desian/drawinas? Whether Structural Engineer has been appointed for Yes Name: Shravani Dhamane 2 . License No: - the project? Mobile: 9820610943 E-mail: shravanidhamane®amail.com Whether the inspection register.s, site order book Yes 3 and 9uality control test registers are maintained at the site properly and endorsed by the Engineer-In- Charae? Yes 4 Whether testing facilities to check quality of material is available at site? - . Yes/No Remarks Sr. No. Parameters . . Yes 5 Whether the statua~ provisions for disaster resistance/earthqua e resistant desl~n have been incorporated, specially In case of mu tl-storeyed construction? No 6 Has suitable cognizance been taken on demarcated , flood lines and appropriate precautions taken for rotecting the site from flooding considering local ~oodina issues? 2. Input Materials Sr~ No. Parameters . Yes/No Remarks . Whether the following building materials confirm to Yes 1 relevant IS/BS/NBC Code, or as per Industry Standards? If yes, provide details: (a) Cement concrete and coarse aaareaate Yes (b) Steel and its alloys Yes (c) Electrical wire fittinas and accessories Yes (d) Plumbina and sanitarv fittinas Yes 2 Whether regular tests of materials and construction Yes . products are being done from accredited labs also? If ves, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether suoolv records are beina maintained? 4 Whether suitable water is being used for Yes construction? (i) What is the source of water? Yes (ii) Has water been tested and approved by Yes Enaineer-in-Charae before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship . Yes/No Remarks Sr. No. Parameters Ii j ,- •• '·i·. ·- - ·-·' - -· - - - ~-· Whether works of all the electrical Yes 1 wiring/connections/lift installation/other electr\cal installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? Whether all related works of pll.:,mbing. & sanitary Yes 2 induding installation of water supply systems, drainage systems, sewage systef'!lS, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors . and whether records of the same has been maintained? Yes 3 Whether all the work is being carried out under supervision of experienced and skilled professional? Further, whether the workmanship and q4ality is satisfactory and up to the mark and the work is within the acceptable and permissible limits of deviations as oer relevant Code of Practice? I Sr. No. P1ramtttr1 Yet/No Rem1rt1 Whether remed,al ffl!Hu,.11re undertaken to No ' prevent dampnt11 and 1,a1tages? If yes, provfdt detA~ 5 \l\'hether Mfety preceutions are undertaken during No construtoon actMties for all tn,e of ~ers? Sr. No. Parameters Yes/No No 1 Whether thiro party quaHty inspection Is being No ca"'liec out on site during/after completion of the v.-o.1cs? tf ws. orovide detais. 2 Whether anti-tennite treatment has been undertaken Yes for the so~? 3 Whether fire-fighting arrangements has been Yes undertaken under SUD@MSion of fire coosuftant? 4 Whether proper signages have been instaled on Yes sitelcom:>leted boildino as oer reauirement? 5 Whether p.-ecautions are undertaken to avoid arr Yes oohution dunno construction? P1ease ~.:.~;. 6 Whether records of aft test reports/results have been Yes P."O?erty kept in the presaibed formats and whether the same are available at site for viewing by alo:tees and .to be handed over to the association of alottees? 7 \\'hether au relevant records including sanctioned Yes building plans. utility drawings, various test reports/results have been=rty kept in the prescribed formats to be ed over to the assxiation of aflottees? 8 Any innovative/cost effective/green technc>logy has No been used for improving quality/energy efficiency? Please ~.,;:y. Yours Faithfuly Signature or Engineer (Site Supetvisor) Name: Nitin Pabl Qualification (Notllss than g,adl ■le) License No. (rf any): STATEJRl2024JAPU12474 Phone No: Place: lqeed ~ • of Promoter tw.ne: Jal Bnaw,ni Orchid Infra LlP Date: (>4J>6.202S P.aoe 3 ol l