AA1LL GHARAT AND ASSOCIATES CONSULTING ENGINEER, STRUCTURAL AND INTERIOR DESIGNER GST NO - 27A0TPGS788C1ZG Annexure A FORM (see Regulation S] (Tobe submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date:01-10-2026 To, JAI BHAWANI ORCHID INFRA LLP THANE, MAHARASHTRA, 421302 Subject: Certificate of percentage of Work of completion of construcion work Vivanta Bliss Phase Il having MahaRERA Registration Number P51700076999 (Only Applicable ater projed Registration) being developed by JAI BHAWANI ORCHID INFRA LP Sir IWe MR. ATUL ANIL GHARAT have undertaken assignment as CoNSULTANT ENGINEER Lcensed Surveyor of certifying Percentage of completion of Construction Work of Vivanta Bliss Phase Il having MahaRERA Registration Number P51700076999 (Only Applicable after project Registration, being developed by JAI BHAWANI ORCHIDINFRA LLP) Based on Site Inspecion, with resped to Layout /each of the BuikdingWing of the aforesaid Real Estate Projed Icertify of this certificate upto date 30th march 2028 G.e 1st january 2028 to 30th march 2026) the percetage of work done for each of the buildingwing of the Real Estate project under MahaRERA is as per table A herein below. The percetage of the work executed with respet to each of the activity of the entire phase is detailed in table B Table A Layout/BuildingWing Number: Vivanta Bliss Phase IlBuilding No 3 Wing ENA Sr. No. Tasks/Activity Percentage of Actual Work Done (31-03-2026) (1) (2) (3) Excavation 100.00 2 Basements (f any) 100.00 3 Podiums (if any) 0.00 4 Plinth, 100.00 5 Stit Floor 100.00 6 Slabs of Super Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 50.00 Flats/Premises 8 Sanitary Fitting within the FlaPremises 0.00 Address Contact Email 1st Floor, Sudarshan Building, Kalyan-Bhiwandi Rd., At Pimpalghar Pada, 976652564568408899333 info@atulgharatassociate.in Tal-Bhiwandi, Dist-Thane 421311 8793696931 /8625991689 consu.atulgharat85@gmail.com AATUL GHARAT AND ASSOCIATES CONSULTING ENGINEER, STRUCTURAL AND INTERIOR DESIGNER GST NGr. N27A0TPG5788C1ZG Tasks/Activity Percentage of Actuat Work Done (31-03-2026) 9 Iits Wells Stairca5e Nater Tanksand Lobbi es at each Floor level Overhead and 50.00 Underg 10 Etemal plumbing aildinalwing external plaster, elevation, completion of terraces with 50.00 waterpro ofing of the 11 installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 30.00 CFO NOc. Electrical fitings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s. protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other acivities. Layout/Building/Wing Number: Vivanta Bliss Phase ll Building No 4 Wing FINA Sr. No. Tasks/Activity Percetage of Actual Work Done 31-03-2026) (1) (2) (3) 100.00 1 Excavation 100.00 2 Baserments (if any) 0.00 Podiums (if any) 100.00 Plinth. stit Floor 100.00 Slabs of Super Structure 100.00 internal walls, Internal plaster, Floorings, Floors and windows within 95.00 Flats/Premises |Sanitary Fitting within the Flat/Premises 70.00 Staircases, ifts Wells and Lobbies at each Floor level Overhead and 90.00 |Underground Water Tanks 10 Exdemal plumbing and external plaster, elevation, completion of teraces with 85.00 |waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fitings and Equipment as per 0.00 CFO NOc, Elecdrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, areas appurtenant to Building/Wing, Compound Wall and ali paving of requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Contact Email Address 1st Floor, Sudarshan Building, Paa606a645 /8408899333 info@atulgharatassociate.in Kalyan-Bhiwandi Rd., At Pimpalghar Pada, Tal-Bhiwandi, Dist-Thane 421311 8793696931 / 8625991689 consu.atulgharat85@gmailLcom A|A1UL GHARAT AND ASSOCIATES cONSULTING ENGINEER, STRUCTURAL AND INTERIOR DESIGNER GST NO - B-Common Table 27A0TPG5788C1ZG Areas (Intermal and Extemal Development Works) in respect of Registered Phase I Project Number) Common areas and facilities Is Available Percentage of Actual Details Sr.No Work rne (Yes/ No) (31--2126) (1) (2) (3) (4) Yes 0.00 1 Internal Roads & Footpaths Yes 0.00 Water 2 Water Supply Connection on Completicn 0.00 No STP 3 |Seweragge (Chamber, Lines, Septic Tank, STP) Yes No 0.00 NA Storm Water Drains Yes 0.00 Onfy Tree 5 Landscaping & Tree Plarting Plarting 0.00 NA No Street Lighting 0.00 NA No 7 Community Buildings NA Treatment And Disposal Of Sewage And Sullage Water No 0.00 8 No 0.00 NA 9 Solid Waste Management And Disposal Yes 0.00 Onty Rain Water 10 Water consevation Rain water harvesting Harvesting No 0.00 NA 11 |Energy managemcnt NA 12 Fire protection and fire safety requirements Yes 0.00 13 Electrical meter room, sub-station, receiving station Yes 0.00 Oniy Electrical Meter Box NA 14 |Aggregatearea of recreational Open Space No 0.00 No 0.00 NA 15 Open Parking YQurs Faithfully LRAT &ASSO MK. ATUL ANIL GHARAT (STATE/R/2025 Signature ENGINEER & Name (IN BLOCK LETTEFSAPL sUETANT cRR2022/APUO284HIWAN (License ate of Agreed adcepted b Signature Pretnotr Name: JAraANAN ORCHID INFRA LLP Date: Address Contact Email 1st Floor, Sudarshan Building, Kalyan-Bhiwandi Rd., At Pimpalghar Pada, 9766525 4Fd8408899333 info@atulgharatassociate.in Tal-Bhiwandi, Dist-Thane 421311 8793696931/8625991689 consu.atulgharat85@gmail.com