Bahuball T. Dhamane B. E. Civil M.I.E. Chartered Engineer Off.: F-7, Neighbourhood Shopping Complex, Sector • -4, NenA, Navi Mumbai. Resl.: Keshav Height, A/1001, Opp. Klshor Park. PSl'Slk Nagar, Kalwa, Thane • 5. Off.: 9137 899183 Mobile: 98206109-43 E-mail: shravanklhamane@gmal.com Ref.No. Date _ _ _ __ FORM-2 (See Regulation 3) ENGINliER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date: 20.01.2025 To, 11,ePartnen, Jai Bhawanl Orchid Wra LLP, Vivantas Bliss Near Gala No. U 46, Jal Mats Di Compound, Kalher, Dist- Thane 421302. Subject: Certificate of Cost lncum!d foe Development ol -Vlvanta Bliu Phase u• having MahaRERA Registration Number: 1'51?000'76999 being developed by Jal Bhawanl Ordlld ln&a LLP. Sir, 1. I/We Shravanl Dhamane have undertaken assignment of certifying F.stimated Cost for "ViYanta Bliu PhMe 11• having MahaRERA Registration Number: P51?000'76999 being developed by Jal Bhawanl Orchid Infra LLP. 2. We have estimated the rost ol civil. MEP and allied works required for completion ol the apartments and proportionate completion of internal &: external works of the project as per specifications mentioned in agreement of sale. our estimated rost cakulations att based on the drawings/plans made available to us for the project under reference by the Developer / consultsnts. 11,e schedule ol Items and quantity required for the entire wock as calculated by Quantity Surveyor° appointed by Developer/Engineer, the assumption of the rost of material, labour and other Inputs made by developer, and the lite inspection carried out by us to ascertain/ confirm the I 3. Vie cslin,n\e Total Ilsllmnted Cost of completion of the aforesaid project under rc(eren(c nt Rs.l3,68i33,400/ • (folnl of Tnblc A nnd B) at the Ume of Registration. The estimated total rost or project is wllh reference to the Civll, MEP nnd allied works required for completion of the npMlmen\s nnd proporlionate compleUon of internal & external works, ns per spedficnlions mentioned in ngreen\ent of sale and for the purpose of obtaining occupation cerlificatc/complelion (ertificate lor the buildifig(S) / Wing(S) / Layout / Plotted Development [roan U,e Mumbai MeltopoUtnn Region Development AuU,ority being the plruu,ing auU,ority under whose jurisdiction the aforesaid project Js being implemented. 4. The estimated Cost incurred till 30.09.2024 is calculated at Rs.69,72,500/- (Total of Table A nnd B). TI,e amount of F.stimnted Cost Incurred is calculated on the basis of input materials/ services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and AJiied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estimated at Rs.12,98,60,900/- (Total of Table A and B). 6. I certify that the cost of the Civil, MEP and allied work for the apartment and proportionate internal & external works, as per specifications mentioned in agreement of sale, of aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Table A Building/Wing/L ayout/Plotted Development bearing Number: 3 or called Vivanta Bliss Phase II Building No 3 Wing E Sr. No. Particulars Amounts (In Rs.) 1 Total Estimated cost of the 5,20,00,000/- building/wing/L ayout/Plotted Developments 2 Cost incurred as on 30.09.2024 13,94,500/- 3 Work done in percentage (as percentage of the 2.68% estimated cost) 4 Balance Cost to be Incurred••(Based On 5,06,05,500/- Estimated Cost) 5 Cost incurred on additional / Extra Items not included in the &timated Cost (Table-C) ~ CamScanner Building/Wing/Layout/Plotted Development bearing Number: 4 or called Phase ll Building No 4 Wing F Vivanta Bliss Sr. No. Particulars 1 Total Estimated cost of the Amounts (In Rs.) 7,80,00,000/- buildin g/ wing/l ayout/ Plotted Developments 2 Cost incurre d as_ on 30.09.2024 . 55,78,000/· 3 Work done in' percentage (as percentage of the 7.15% estima ted cost) 4 Balance Cost to be Incurred*..(Based Ort 7,24,22,000/- Estima ted Cost) 5 Cost incurred on additional / Extra Items not included in the Estimated Cost (Table-C) - TableB Internal & External Development Works In Respect of the Registered Phase Sr. No. Particulars Amoun ts (In Rs.) 1 Total Estimated cost of the Internal ru1d Rs.68,33,400/- External Development works including amenities and facili~es in the layout 2 Cost incurre d as on 30.09.2024 0.00 3 Work done in percentage (as percentage of the 0% estimated cost) 4 Balance Cost to be Incurred (Based On Rs.68,33,400/- Estimated Cost) 5 Cost µ1curred on adclition~l / Extra Items not include d in th • ~~ • st (Table-C) Yours faithfully, ::s: ~ ~ /..~ .. a:i ~ E~SHRAVANIDHAMANE . ,S\J~ {Not Less than Bachelor's Degree Holder or equivalent as per section 2(u) of the Act} Local Authority licence no. _ _ _ (If applicable) Agreed and Accepted by: 51goature o Name: Mr. -•-111.a Oesignatio·~u~~~l-.j. ,~- Date: 20.01.2 """"-..., I . l Note: r l. The _scope 0 ~ work is to complete Registered Real Estate Project as per Drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of engineer or can be done by an independent Quantity Surveyor, whose Certificate or quantity calculated can be telied upon by the Engineer. In case of independent quantity surveyor being appointed by DeveJop~r, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by the Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be menti6rted at the place marked (*). 3. (**) Balance Cost to be incurred (4) may vary from Difference between Total es~ated Cost (1) and Actual Cost inc'1Jl'ed (2) due to deviation in quantity required/ escalation of cost etc. As this is an estimated cost, any deviation in qucmtity required for development of the Real &tate Project ,vill result in amendment of the cost incurred/ to be incurred. 4. All components of work with specifications are indicativ.e are not exhaustive. 5. Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specification in a~eement of sale. TableC Llst of Extra/ Additional/ Deleted Items considered in cost (which were not part of the original estimated of Total Cost) Sr. List of Extra/ Additional/ Deleted items Amount (In Rs.) No. 1. Not Applicable