FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 29/05/2026 To, The MILAN ASSOCIATES DOMBIVLI, Kalyan, Thane, 421201 Quality Assurance Certificate (Certificate No. .for the Year Ending ..March 26...) Subject : Certificate for quality of materials used and quality of Construction and workmanship of the work of MILAN HEIGHTS having MahaRERA Registration Number P51700076985 being developed by MILAN ASSOCIATES Sir, I/We Rudra.Patel. have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows: 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil parameters have been accounted for in the structural design/drawings? 2 |Whether Structural Engineer has been appointed for Yes Name: Surendra Patel |the project? License No: |Mobile: 9987062650 E-mail: svpassociates@gmail.com 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at the site properly and endorsed by the Engineer-in Charge? 4 Whether testing facilities to check quality of material No is available at site? Page 1 of 3 1/3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed Construction? Has suitable cognizance been taken on demarcated Yes flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 Whether the following building materials confirm to Yes relevant IS/BS/NBC Code, or as per Industry |Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes (c) Electrical wire, fittings and accessories Yes (a) Plumbing and sanitary fittings Yes 2 Whether reqular tests of materials and construction No products are being done from accredited labs also? f yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes BMC WATER SUPPLY Construction? ) What is the source of water? Yes (i) Has water been tested and approved by Yes Engineer-in-Charge before construction? (iii) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes wiring/connections/ift installation/other electrical installations have been carried out under authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes including installation of water supply systerns, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors Jand whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes Supervision of skilled professional? expenennship Further, whether the and quality is satisfactory and up to the mark and the work is |within the acceptable and permissible limits of deviations as per relevant Code of Practice? Page 2 of 3 2/3 Sr. No. Parameters Yes/No Remarks 4 Whether remedial measures are undertaken to Yes prevent dampness and leakages? If yes, provide details 5 |Whether safety precautions are undertaken during Yes |construction activities for all type of workers? 4. Miscellaneous Sr. No. Parameters Yes/No No 1 Whether third party quality inspection is being No |carried out on site during/after completion of the works? If yes, provide details. 2 Whether anti-termite treatment has been undertaken Yes [for the soil? 3 |Whether fire-fighting arrangements Yes ndertaken under Supevison of froene consultant? 4 Whether proper signages have been installed on Yes site/completed building as per requirement? 5 Whether precautions are undertaken to avoid air Yes lpollution during construction? Please specify. 6 |Whether records of all test reports/results have been No properly kept in the prescribed formats and whether the same are available at site for viewing by |allottees and to be handed over to the association of allottees? |Whether all relevant records including sanctioned Yes building plans, utility drawings, various test reports/results have been properly kept in the prescribed formats to be handed over to the association of allottees? |Any innovative/cost effectivelgreen technology has No been used for improving quality/energy efficiency? Please specify Yours Faithfully Signature of Engineer (Site Supervisor) Name: Rudra Patel Qualification (Not less than graduate) License No. (if any): Phone No: Place: Agreed and accepted by M/s. Milan Associates Signature of Promoter Name: MILAN ASSOCIATES Partners Date: 29/05/2026 Page 3 of 3 3/3