FORM-2A [See Regulation 3A.] ENGINEERS'S CERTIFICATE FOR QUALITY ASSURANCE (Site Supervisor's Certificate) (To be submitted at the end of Financial Year) Date: 29/05/2026 To. The MILAN ASSOCIATES DOMBIVLI, Kalyan, Thane, 421201 Quality Assurance Certificate (Certificate No. ...for the Year Ending .March.25...) Subject: Certificate for quality of materials used and quality of Construction and workmanship of the work of MILAN HEIGHTS having MahaRERA Registration Number P51700076985 being developed by MILAN ASSOCIATES Sir, IWe Budra Patel. have undertaken an assignment of supervision of this real estate project Our Responsibility To carry out the work in accordance with the development permission and as per the approved plan, to submit certificate of supervision of work, to carry out material testing in-situ or in an authorized laboratory as per prevailing and applicable standards, to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and / or other relevant code of practice. The details of the quality are as follows : 1. Structural Design, Stability and Testing Sr. No. Parameters Yes/No Remarks 1 Whether soil investigations of the site has been Yes conducted before the structural design and soil have accounted for in the parameters structural ęnldrawings? 2 Whether Structural Engineer has been appointed for Yes Name: Surendra Patel the project? License No: Mobile: 9987062650 E-mail: svpassociates@gmail.com 3 Whether the inspection registers, site order book Yes and quality control test registers are maintained at the site properly and endorsed by the Engineer-in Charg 4 Whether testing facilities to check quality of material No is available at site? Page 1 of 3 1/3 Sr. No. Parameters Yes/No Remarks 5 Whether the statuary provisions for disaster Yes resistance/earthquake resistant design have been incorporated, specially in case of multi-storeyed Construction? 6 Has suitable cognizance been taken on demarcated Yes |flood lines and appropriate precautions taken for protecting the site from flooding considering local flooding issues? 2. Input Materials Sr. No. Parameters Yes/No Remarks 1 |Whether the following building materials confirm to Yes relevant lIS/BS/NBC Čode, or as per Industry Standards? If yes, provide details: (a) Cement, concrete and coarse aggregate Yes (b) Steel and its alloys Yes l(c) Electrical wire, fittings and accessories Yes (d) Plumbing and sanitary fittings Yes 2 Whether regular tests of materials and construction No products are being done from accredited labs also? f yes, details of such labs 3 Whether manufacturer test certificate for cement, Yes steel, pipes etc. have been obtained and whether supply records are being maintained? 4 Whether suitable water is being used for Yes BMC WATER SUPPLY construction? I0) What is the source of water? Yes () Has water been tested and approved by Yes Engineer-in-Charge before construction? (i) Has water been tested subsequently as per Yes requirement? 3. Quality of Workmanship Sr. No. Parameters Yes/No Remarks 1 Whether works of all the electrical Yes wiring/connections/lift installation/other electrical installations have been carried out under |authorized/registered electrical engineer and whether records of the same has been maintained? 2 Whether all related works of plumbing & sanitary Yes |including installation of water supply systems, drainage systems, sewage systems, sinks, toilets etc. have been carried out under authorized/registered plumbers/sanitary contractors and whether records of the same has been maintained? 3 Whether all the work is being carried out under Yes supervision of experienced and skilled professional? Further, whether the workmanshipand quayis satisfactory and up to the mark and