13 80 , 0 S roRr:OPATr SQUARf BflilND KANARA BLSINE'i'i (fNTER . V. PA1 cl. & AssociA1 l:s LAXMI "JAGAR 6HATKOPAP (�), MUMBAI 400 075 CONSULTING lNGll\iffllS • srnuc IURAL OESIGNf RS HIHAX 250C 6098, 2r.ou 5219 f mt11I "VPdssocidles<.alqmJtl lOlll Web www svpatelassoc1dtes LOrn Agreed and Accepted by: Signature of Partner MIS. MILAN ASSOCIATES, Mr. Hasmukh Patel and Milan Patel, Date: 27.04.2026 Note: I. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by The Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*) 3. Balance cost to be incurred (4) may vary from Difference between total estimated Cost (I) and Actual Cost incurred (2) due to deviation in quantity required I escalation of cost ect. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incutTed / to be incurred. 4. All components of work with specifications are indicative and not exhaustive. 5. Please specify if there are any deviations/ qualifications, Example: Any deviations in input material used from specifications in agreement of sale. Table C List of Extra/Additional/ Deleted Items considered in cost (which were not part of the original Estimate of Total Cost) Sr. No. List of Extra/Additional I Deleted Items Amount (In Rs.) I. 2.