UC ASSOCIATES A/202, Sarvoday Aongan Soc., Pandurang Wadi, Street No. 2, Near Sai Baba Temple, Dombivli (E) 421 201 Architect & Interior Designer Email : ucassociates29@gmail.com I7666 283 484 FORM 1 (see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 31/03 / 2026 To, Mr. Hasmukh Patel & Milan Patel M/S. Milan Associates Dombivli (E). Subject: Certificate of Percentage of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only Applicable after project Registration) being developed by M/S. Milan Associates. Sir, I/We Ar. Uday Mansukhlal Chopda have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only applicable after project Registration, being developed by M/S. Milan Associates. Based on site Inspection, with respect to layout/ each of the Building/Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. UC ASSOCIA T __ A/202, Sarvoday Aangan Soc., Pondurang Wadi, Str ...: t�o 2, Archite(t & Interior Designer Near Soi Bobo Temple, Dombivli (E) I,,") 1 �O: Email: ucassociates29@gmail.com I rt, 7M: �&� 484 Table A la out/ Building /Wing Number _l_{to be prepared separately for each Layout /Building /Wing of the Project) Sr.No. Tasks/Activity %of work done 1 Excavation 100 2 1 Plinth number of Basement(s) and Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 0 5 11 number of Slabs of Super Structure 100 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to 60 each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises. 10 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts,· 60 Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, completion of terraces with 60 waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 15 Bectrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Table 8 Common Areas (Internal and External Development Works) in respect of the Registered Phase / Project Number Sr. Common areas and Facilities, Amenities Proposed %of work Details No. (Yes/No) done 1. Internal Roads & Foot paths. No. N.A. - 2. Water Supply Yes 0 - 3. Sewerage (chamber, lines, Septic Tank , STP). Yes 0 - 4. Storm Water Drains Yes 0 - 5. Landscaping & Tree Planting. Yes 0 - 6. Street Lighting No. N.A. - 7. Community Buildings No. N.A. - 8. Treatment and disposal of sewage and sullage water. No. N.A. - 9. Solid Waste management & Disposal. No. N.A. - 10. Water conservation, Rain water harvesting. Yes 0 - 11. Energy management Yes N.A. - 12. Fire protection and fire safety requirements Yes 0 - 13. Electrical meter room, sub-station, receiving station. Yes 0 - 14. Others ( Option to Add more). Yours ly �:�A Agreed and Accepted by (i;jy UC ASSOCIATES Name : Hasmukh Patel & Milan Patel AR. UDAY M. CHOPDA Date : 31/03/2026 (License No. CA/2017/88339)