UC ASSOCIATES A/202, Sarvoday Aangan Soc., Pandurang Wadi, Street No. 2, Near Sai Baba Temple, Dombivli (E) 421 201 Architect & Interior Designer Email : ucassociates 29@gmail.com I07666 283 484 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 31/ 12 / 2025 To, Mr. Hasmukh Patel & Milan Patel M/S. Milan Associates Dombivli (E). Subject: Certificate of Percentage of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only Applicable after project Registration) being developed by M/S. Milan Associates. Sir, /We Ar. Uday Mansukhlal Chopda have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only applicable after project Registration,being developed byM/S. Milan Associates. Based on site Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. UC ASSOCIATES A/202, Sarvoday Aangan Soc.,Pandurang WNadi, Street No 2, Near Sai Baba Temple, Dombivi (E) 421 201 Architect & Intenior Designer Email: ucassociates29@gmail.com 7666 283 484 Table A Project) Layout /Building /Wing Number 1 (to be prepared separately for each Layout /Building /Wing of the % of work Sr.No. Tasks/Activity done 100 1 Excavation 1 Plinth number of Basement(s) and Plinth 100 2 number of Podiums 4 Stilt Floor number of Slabs of Super Structure 100 5 11 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windowsto 45 each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises. 0 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 50 Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, completion of terraces with 50 waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 15 Electrical fittings to Common Areas,electro, mechanical equipment, Compliance to conditions of environment /CRZ N0C, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate. Table B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number Sr Common areas and Facilities, Amenities Proposed % of work Details No. (Yes/No) done 1 Internal Roads & Foot paths. No. N.A. 2 Water Supply Yes 3 Sewerage (chamber, lines, Septic Tank, STP). Yes 0 Storm Water Drains Yes 0 4 5 Landscaping & Tree Planting. Yes No. N.A. 6 Street Lighting No. N.A. 7 Community Buildings Treatment and disposal of sewage and sullage water. No. N.A. 9 Solid Waste management & Disposal. No. N.A. 10. Water conservation, Rain water harvesting. Yes 0 11. Energy management Yes N.A. 12. Fire protection and fire safety requirements Yes 13. Electrical meter room, sub-station, receiving station. Yes 14. Others ( Option to Add more). Yours Faithfully Agreed and Accepted by: UCASSOCIATES Name : Hasmukh Patel & Milan Patel AR. UDAY M. CHOPDA Date :31/12/2025 (License No. CA/2017/88339)