UC ASSOCIATES A/202, Sarvoday Aangan Soc., Pandurang Wadi, Street No. 2, Near Sai Baba Temple, Dombivli (E) 421 201 Architect &Interior Designer Email: ucassociates29@gmail.com | O7666 283 484 FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 23/09/ 2024 To, Mr. Hasmukh Patel & Milan Patel M/S. Milan Associates Dombivli (E). Subject: Certificate of Percentage of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only Applicable after project Registration) being developed by M/S. Milan Associates. Sir, I/We Ar. Uday Mansukhlal Chopda have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Milan Heights having MahaRERA Registration Number P51700076985 (Only applicable after project Registration, being developed by M/S. Milan Associates. Based on ite Inspection, with respect to Layout/ each of the Building/Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table 8. UDAY M. CHOPDA CA/2017/88339 UC ASSOCIATES A/202, Sarvoday Aangan Soc., PandurangWadi, Street No. 2, Near Sai Baba Temple, Dombivli (E) 421 201 Architect &Interior Designer Email : Ucassociates29@gmail.com |7666 283 484 Table A Layout / Building Wing Number 1 (to be prepared separately for each Layout /Building /Wing of the Project) % of work Sr.No. Tasks/Activity done 100 1 Excavation number of Basement(s) and Plinth 100 2 1Plinth number of Podiums Stilt Floor 5 number of Slabs of Super Structure Windows to 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises. Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, 0 10 Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Walland all other requirements as may be required to obtain Occupation/ Completion Certificate. Table B Number Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Common areas and Facilities, Amenities Proposed % of work Details Sr. No. (Yes/No) done No. N.A. 1. Internal Roads & Foot paths. Yes 2. Water Supply 3. Sewerage (chamber, lines, Septic Tank, STP). Yes Storm Water Drains Yes 0 4. 5. Landscaping &Tree Planting. Yes No. N.A. 6. Street Lighting No. N.A. 7. Community Buildings No. N.A. 8. Treatment and disposalof sewage and sullage water. 9. Solid Waste management & Disposal. No. N.A. 10. Water conservation, Rain water harvesting. Yes 11, Yes N.A. Water Heater Energy management Fire protection and fire safety requirements Yes 0 12. 13. Electrical meter room, sub-station, receiving station. Yes 14. Others ((Option to Add more). Yours Faithfully , Agreed and Accepted by : UDAY M.CHOPDAT) Name : Hasmukh Patel & Milan Patel UCASSOCIATES CA2017/88339) AR. UDAY M. CHOPDA Date : 23/09/2024 (License No.CA/2017/88339)