Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30.06.2026 To, SHETRUNJAY REALTY LLP THANE, MAHARASHTRA, 421302 Subject : Certificate of percentage of Work of completion of construction work of THE PALLAZO having MahaRERA Registration Number P51700076959 (Only Applicable after project Registartion) being developed by SHETRUNJAY REALTY LLP. Sir, I/We M/S NAV RACHANA have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of THE PALLAZO having MahaRERA Registration Number P51700076959 (Only Applicable after project Registration, being developed by SHETRUNJAY REALTY LLP ) Based on Site Inspection,with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: THE PALLAZO BUILDING 1/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) 1 Excavation 100% 2 Basements (if any) 100% 3 Podiums (if any) 0.00 4 Plinth, 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 50% 7 Internal walls, Internal plaster, Floorings, Floors and 22% windows within Flats/Premises 8 Sanitary Fitting within the Flat/Premises 0.00 9 Staircases, lifts Wells and Lobbies at each Floor level 0.00 Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, completion of 0.00 terraces with waterproofing of the Building/wing. 11 Installation of Lifts, water pumps, Fire Fighting Fittings and 0.00 Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Page 1 of 2 Table B - Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Sr.No Common areas and facilities Is Percentage of Actual Details Available Work Done (Yes / No) (As on date of the Certificate) 1 Internal Roads & Footpaths No 0.00 NA 2 Water Supply Yes 0.00 Municipal Corporation Supply 3 Sewerage (Chamber, Lines, Septic Tank , STP) Yes 0.00 Septic Tank 4 Storm Water Drains Yes 0.00 Surface drain System 5 Landscaping & Tree Planting No 0.00 NA 6 Street Lighting No 0.00 NA 7 Community Buildings No 0.00 NA 8 Treatment And Disposal Of Sewage And Sullage No 0.00 NA Water 9 Solid Waste Management And Disposal No 0.00 NA 10 Water conservation /Rain water harvesting Yes 0.00 Rain Water Harvesing Recharge Pits. 11 Energy managemcnt Yes 0.00 Solar Water Heating system 12 Fire protection and fire safety requirements Yes 0.00 As per CFO Noc 13 Electrical meter room, sub-station, receiving Yes 0.00 As per Torrent station Power NOC 14 Aggregate area of recreational Open Space No 0.00 NA 15 Open Parking No 0.00 NA Yours Faithfully Shraddha Digitally signed by Shraddha Aniruddha Aniruddha Paranjpe Date: 2026.09.02 Paranjpe 11:33:06 +05'30' SHRADDHA A PARANJPE (License No. CA/2008/41812) Agreed and Accepted by:- Digitally signed by Jiten Nathalal Jiten Nathalal Shah Shah Date: 2026.09.07 18:53:48 +05'30' Signature of Promoter Name: SHETRUNJAY REALTY LLP Date: 30.06.2026 Page 2 of 2