FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 31/03/2026 To, Shetrunjay Realty LLP, H. No. 1352, Sona House, Narpoli, Bhiwandi, Thane – 421302. Subject: Certificate of Percentage of Completion of Construction Work of ‘The Pallazo’ building situated on Plot bearing Survey No. 164, Hissa No. 1, Village – Kamatghar, Taluka – Bhiwandi, District – Thane, 421302 admeasuring area 4755 Sq. mt as per 7/12 extract, being developed by Shetrunjay Realty LLP. Sir, I/ We M/s Nav Rachana have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of ‘The Pallazo’ having MahaRERA Registration Number P51700076959 being developed by Shetrunjay Realty LLP. Based on Site Inspection, with respect to Layout / each of the Building / Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Shraddha Digitally signed by Shraddha Aniruddha Aniruddha Paranjpe Date: 2026.06.05 12:09:11 Paranjpe +05'30' Table A Building No. 1 Layout / Building / Wing Number ‘The Pallazo’ (to be prepared separately for each Layout/ Building /Wing of the Project) Sr. No. Tasks / Activity Percentage of Actual Work Done (1) (2) (As on date of the Certificate) 1. Excavation 100% 2. Basements (if any) 100% 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor 100.00% 6. Slabs of Super Structure (8th floor slab completed) 35.00% 7. Internal walls, Internal Plaster, Floorings, Doors and 18.00% windows within Flats / Premises (4th floor brick work completed) 8. Sanitary Fittings within the Flat / Premises 0% 9. Staircases, Lift Wells and Lobbies at each Floor 0% Level Overhead and Underground Water Tanks 10. External plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building / Wing 11. Installation of Lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Shraddha Digitally signed by Shraddha Aniruddha Aniruddha Paranjpe Date: 2026.06.05 12:09:27 Paranjpe +05'30' TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase / Project Number Sr. No Common areas and Proposed Percentage Actual Details (1) Facilities (Yes/No) Work done (As on (5) (2) (3) date of the Certificate) (4) 1. Internal Roads & Footpaths NO NA NA 2. Water Supply YES 0% Municipal Corporation Supply 3. Sewerage (chamber, lines, YES 0% Septic tank Septic Tank, STP) 4. Storm Water Drains YES 0% Surface Drain System 5. Landscaping & Tree NO NA NA Planting 6. Street Lighting NO NA NA 7. Community Buildings NO NA NA 8. Treatment and disposal NO NA NA of sewage and sullage water 9. Solid Waste NO NA NA management & Disposal 10. Water conservation / Rain YES 0% Rain Water water Harvesting Harvesting Recharge Pits 11. Energy management YES 0% Solar Water Heating System 12. Fire protection and fire YES 0% As per CFO NOC safety requirements 13. Electrical meter YES 0% As per Torrent room, sub-station, receiving Power NOC station 14. Others (Option to Add NA NA NA more) Yours Faithfully Shraddha Digitally signed by Shraddha Aniruddha Paranjpe Aniruddha Date: 2026.06.05 12:09:59 Paranjpe +05'30' SHRADDHA A PARANJPE Architect (License NO. CA/2008/41812) Agreed and accepted by: Digitally signed by Jiten Nathalal Jiten Nathalal Shah Signature of Promoter Shah Date: 2026.06.05 Name: Jiten N. Shah 12:10:25 +05'30' Date: 05/06/2026