KB CONSULTANTS B Chartered Engineers kbconsultants1 @gmail.com ENGINEER'S CERTIFICATE DATE:30/09/2025 To, M/s. ADIYOGI INFRA THROUGH PARTNER, MR. PRAVIN BALKRISHNABHOIR&OTHERS, ADD: BALAJI MATERIAL SUPPLIER, BESIDES KARRAM GARDEN, OPP, LOTUS POND, NEAR SHIV MANDIR, DAM ROAD, CHIKHLOLI, AMBERNATH (WEST), DIST: THANE, MAHARASTA-421503 Subject: Certificate of Cost Incurred for Development of "ADIYOGI AURA" having [MahaRERA Registration Number P51700076979] being developed by M/s. ADIYOGI INFRA. Sir, Cost for I, Mr.Brijeshkumar D.Parasiya have undertaken assignment of certifying Estimated "ADIYOGI AURA" having MahaRera Registration Number P51700076979] being developed by M/s. ADIYOGI INFRA. completion of the 2. We have estimated the cost of Civil, MEP and allied works reguired for project as per apartments and proportionate completion of internal &external works of the are based on specifications mentioned in agreement of sale. Our estimated cost calculations the drawings/plans made available to us for the project under reference by the Developer/Consultants. The schedule of items and quantity required for the entire work as calculated by Meghraj Longale Quantity Surveyor* appointed by developer/engineer, the developer and the site assumption of cost of Material, labour and other inputs made by inspection carried out by us to ascertain/confirm the above analysis given to us. 3.We estimate Total Estimated Cost of completion of the aforesaid project under reference at Rs.11,37,00,000/- (excluding GST) (Total of Table Aand B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal &external works, as per specification mentioned in agreement of sale and for the purpose of obtaining occupation certificate/completion certificate for the building-1&2/wings-(A&B)/ Layout/ plotted development from the AMBERNATH MUNICIPAL CORPORATION being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.3,96,90,000/- (Total of Table A+B). The amount of Estimated Cost Incurrediscalculated on the basis of input materials/services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal and external works, as per specification mentioned in agreement of sale, of the project is estimated at Rs. 7,40,10,000/- (excluding GST) (Total of Table A+B). 9 Head Office : 13Sai Niketan, Plot No -9A, Sector -20, Kharghar, Navi Mumbai -410 210 2 Branch 0ffice :Shop No.9, Sun Villa Apt., Near Union Bank, Datta Chowk, Belavali, Badlapur (W) 6.Icertify that the Cost oftheCivil, MEP and allied work for the apartments and proportionate internal and external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table Aand B below: TABLE A Building-1/Wing-A/ Layout/ Plotted Development S.No.138, H.No.1/A, Village-Chikhlolí, Ta-Ambernath, Dist.-Thane. Or called "ADIYOGI AURA". Sr. No Particulars Amounts 1 Total Estimated cost of the Project/wings as on Rs. 7,56,00,000/ 30/03/2024 is (excluding GST) 2 Cost incurred as on 30/09/2025 Rs. 1,51,20,000/ (based on the Estimated cost) 3 Work done in Percentage 20% (as Percentage of the estimated cost) 4 Balance Cost to be Incurred Rs. 6,04,80,000/ (Based on Estimated Cost) (excluding GST) 5 Cost Incurred on Additional /Extra Items Rs.0/ as on 30/09/2025 not included in the Estimated Cost (Annexure A) TABLE A Building-2/Wing-B/ Layout/ Plotted Development S.No.138, H.No.1/JA, Village-Chikhloli, Ta-Ambernath, Dist.-Thane. Or called "ADIYOGI AURA". Sr. No Particulars Amounts 1 Total Estimated cost of the Project /wings as on Rs. 3,51,00,000/ 30/03/2024 is (excluding GST) 2 Cost incurred as on 30/09/2025 Rs. 2,45,70,000/ (based on the Estimated cost) 3 Work done in Percentage 70% (as Percentage of the estimated cost) 4 Balance Cost to be Incurred Rs. 1,05,30,000/ (Based on Estimated Cost) (excluding GST) 5 Cost Incurred on Additional /Extra Items Rs.0 ason 30/09/2025 not included in the Estimated Cost (Annexure A) TABLE B Registered Phase the Works in Respect of Internal and External Development Amounts Sr. Particulars No Rs. 30,00,000/ Total Estimated cost of the Internal and External Development Works including amenities and Facilities in the layout as on 30/03/2024 15 (excluding GST) Rs.0/ Cost incurred as on 30/09/2025 (based on the Estimated cost) 0% 3 Work done in Percentage (as Percentage of the estimated cost) Rs.30,00,000/ Balance Cost to be Incurred (Based on Estimated Cost) (excluding GST) Rs. 0/ 5 Cost Incurred on Additional /Extra Items as on 30/09/2025 not included in the Estimated Cost (Annexure A) Yours Faithfully BRIESH PARASIYA M.TECH (STR), M.I.E Consulting Engineer Signature of Engin, Sun Villa, Opp. Dutt Chewk. (Licence No-STÄIL/Poaxastagsa West) Agreed and Accepted By: Signature of Promoter Name: M/s. ADIYOGI INFRA DATE: